PT. Umega Maju Bersama
(UMB.ope- Foaming 220
FOAM SERVICE REPORT Rey. No. Ot
[Customer PT. Pertamina Hulu EnergiSiak [Contract [3900003652
Date 1 Bepew\esr 220 [Foam No.
[Objective Field andWelNo,_| TC 13
Rig Hoist [OS 4 oF Area Batang Feld
[Well Program No. [charge To.
Operation ‘Standby |Operation| Standby | Cancel
Description | Date | Time | Operatic ae charge | charge change | Amount COR)
rival Time 7 ae 1 Jew
Release Time halas| 20:
Total Time
CONSUMABLE REPORT
‘Quantity Unit Price
ees fon (Gallon / Litre) (WOR / Gallon / Litre) ‘Amount (IDR)
FOAMER A2. ly (0-000 _ | 2.160.000
DEFOAMER [fle 250.060 | 259.000.
SOLAR Bas Ge 10.000 | 2, 600.000
EQUIPMENT RENT REPORT
Unit rice
Description Operation Hours ORE RSGAP Amount (IDR)
Foam unit da
Rotating Head —
Stripping Head So
E TOTAL AMOUNT (IDR)
Time
Date Sart eg Duration Description
[gra =nate
(3? 3e] 1 fae]
fa: BI fe 4nl 2 pa]
ee es
= SER Ee U0 Foamng
o petion Foour Loree — 426 Ft
ae Re ngecen Foun 423- U4?
Wve | 20: Fal 1 Daw
— Conbun Re apc tion, pe Lag FE Get
eir0e [zp :00[ ( Jaw
- fs down
CREW.
[Supervisor n [Supervisor
[Operator Or. |Operator
Jr. Operator te Jr. Operator
PM. Opt & Swamper Uh PM. Opt & Swamy
PREPARED BY ‘APPROVED BY
PT. UMEGA MAIU BERSAMA PT, PERTAMINA HULU ENERGISIAK
[Name / Badge eM ha Name / Badge Teun Voraaa
Position [Steerer Position Company man
signature a ee
signature My
PPS fA, EWS
Dsibotan WHE POs Ma BT