V L C BBLS: Required Data
V L C BBLS: Required Data
Required data:
ρf = Formation gradient in ppg.
ρm = Old mud weight in ppg.
To calculate the formation gradient, first we need to estimate the kick length. The vol-
ume of the kick around the drill collars is equal to:
6.02 4.752
Vk _ dc Ldc Cann _ dc 800 10.4 bbls
1029.4
The remaining volume of the kick was around the drill pipes. The length of the kick
around the drill pipe is equal to:
We know that the formation pressure can be calculated using Eq. (5.1):
Pbh Psidp Gm H vc
Pbh Psidp
Gm
H vc
Thus, formation pressure can be determined using Eq. (5.7) and substituting for the
mud gradient as follows:
Pf 13, 401
f 14.32 ppg
0.052 H vc 0.052 18, 000