Saudi Aramco 6717-ENG (11/98) 726-200 (Inspection Department) Ref: RFI No. RFI-WELD-073
BI: 10-09003-0006 JO: Phase Construction Title Industrial Support Facilities (ISF) Package 13
To : Project Inspection Unit/ Mr. Liaqat Ali Civil Mech. Plumb. Comms. Elect. Others
Work Permit Required: Yes No Inspection Level: RH Review/Approval of Documents Hold points Witness Point
SAPMT representative has verified that the work is ready for CONTRACTOR has verified that the work to be inspected is
inspection and conforms to the project requirements complete and in compliance with the following specifications:
Work Description: Post Welding Final Inspection of Fully Threaded Rod on the
embedded plates 1VC3002A-1pc(C/D-Feb28,2021), 1VC3003-3pcs(C/D-Jan31,Feb1,2-
2021), 1VC3003A-2pcs(C/D-Feb9,21-2021) and 1VC3002D-1pc(C/D-Mar1,2021)
NOTE: Inspector's signature is for receiving this request only and not for approval or disapproval of the work or facility inspected.
Distribution:
A. Original – Inspection Unit B. 1st Copy – RPO Proponent C. 2nd Copy – ID Coordinator D. 3rd Copy – Construction Contractor