00. OBJECTIVE
The objective of this procedure is to provide a system for evaluation of vendors on monthly basis
based on the quantitative data. This performance data shall be used for continuous improvement
of vendors.
Note: In case of spares not supplied, the marks shall be divided as Quantity Default (25)
and Time default (50)
4.0 VENDOR RATING CALCULATION
a) DEFECT RATING
The following debit system shall be followed for each defect raised by vendor
The following debit system shall be followed for rejections due to vendor fault.
c) QPCR RATING
The following debit system shall be followed for each QPCR raised on vendor:
Rating shall be processed on the basis of all the parts report received from a vendor
Last report submission date will be considered for rating calculation
In case SMIR is not applicable for any particular vendor, 4M marks will get doubled
4M : Man, Machine, Material, Method
SMIR : Summary of Monthly Inspection Report
e) WARRANTY RATING
Top 80 warranty vendors of previous year shall be considered for warranty rating.
The number of claims per 10000 parts supplied & warranty cost per part supplied shall be
considered for calculating the warranty rating.
The following debit system shall be followed for calculating warranty rating:
Deduction Scheme : 8.75 points to be deducted for every claim per 10000 parts supplied by
vendor.
Formula to be used:
Deduction scheme: 17.5 points to be deducted for every claim of 10 paisa per part supplied
Formula to be used:
i. For Recall / Service Campaings 100%(N), 75% (N+1), 50% (N+2), 25% (N+3)
ii. For Dispatch suspension / Unapproved changes 50% (N)
If more than 2 events are applicable in the same month, higher debit shall apply. There is no
debit addition.
%Qty Deafult = (Total E-Nagare Qty Default+Total DI Default / Total Nagares+Total DI)
Formula = 150-(n*1.5*10)
When the time default is more than 7.5% , the marks will become zero.
The following debit system shall be followed for calculating Spares default made by
vendor rating:
When the spares default increases by more than 15%, the marks will be considered as zero
Nagare Schedule DI Schedule
*Note In case of Line stoppage (LS) or Line run without components (LRWC) delivery marks
of the month will be Zero.
6.0 RECORDS
Sr. Format
Record Type Responsible Retention Period
No. Number
Detailed vendor rating
1 - PUR 3 Years
report
Audit plan for least
2 PUR-107/01 PUR 3 Years
performing vendors
3 Vendor Audit check sheet PUR-107/02 PUR 3 Years
Vendor Audit
4 PUR-107/03 PUR 3 Years
Countermeasure report
CP-102/01
History Sheet
Reference Number
Regulation Name Procedure for Vendor Rating
PUR-1-07
Original Applicable Date: 01/12/2017
Amendment Date Contents
Changes made as per the requirements of revised CP-1-02
01/06/2018
(Dt.25.04.2018)
Section 4.1 (a): Defect rating formula changed to
150 – ( A *75 + F*30+G*10+R*25)*K
Section 4.1 (b): Line Rejection Rating formula changed to 100 – P
Section 4.1 (c): Record Management changed to Section 4.1 (d).
Also the criteria is changed as