You are on page 1of 3
N_ POWER DISTI PANY OF AP Lit ‘Ojo The Chief Genecal Manager (P&MM,IPC) APSPDCL, Corporate Office, ‘19-13-65/A, Kesavayanagunia, Tiruchanoor Road, Tirupati, 127 ge ‘Memo, Ho, CGM(PS&MM,IPC)/GMUPC/E Met metering/D. No, 14, dtz_—-12:2014, Sub: -APSPOCL — IPC Solar Roof Top Nat metering Services ~fielc instructions issued Regarding. Ref: - 1) GO.Ms.No22, Dt 25.03.2013 2)G.0.Ms.No.27, Bt, 18.06.2013 3) CE/IPC/SolanF. Rooftop Net metering /D.No, 458/13,0%.30.07.2013 4) GOMsNo 58, Dt, 25.10.2013 5)ULG, Nate,No-CGM(Fin}'GMabi AOPA AOMHTID.No,LOB214,d113.11,2014 The attention of al Superintending Engineers fOperation are drewn te the references cited above, ardlit is requested to arrange to implement the following field instructions while commissioning the Solar Roof Top Net Metered Services, FIELD INSTRUCTIONS FOR SOLAR ROOF TOP NET METERED SERVICES 15 AS, FOLLOWS 1. Solar roof top net metering services are introduced and are registered as pee GO. Ms No :22, 27 &S8. 2. The application for Solar Roof Top Net metering in a prescribed format. ( Annecure 1)enclosed bas to be registered in CSC(Custonier Service Center) concem up ko S00 KWA. By paying application registration fee of Rs. 100%. 3. Inresponse DE*Operation has to issue Technical feasibility repart for the SRT SPY Unie, na preseribed formate ( Annexure 2) forall categories of services( single phase, three phase, CT services and EL.T services.). 4, Main point to be bench marked while issuing technical fowsbility are = + Bank A/C detuils of the consumer is to be eollected along with the application form. SRT Net metered services are eligible without battery support, ‘et metering facility shall be allowed for single phsse ¢uaree phase J CT meter services *H.T. Metered services. The consumer shall instal a SPY systetn Qvith in sonetioned load Jimits ) and request the ABSPDCL, for inspection thin 6 months of approval. 5, APSPDCL shall provide Net metering (Net meter with CT's, PTs, as per applicability } on cost basis duly preparing the estimate after sanction by appropriate authorities by concerned DEOparation.ée after eolleetion of the necessary estimate charges frem the consumer {Solar developer), 6. SPV Generator shall bearthe entire cost of metering (CI s, PT s, Meters ) ‘ ‘with priot permission from SPDCL. The Solar panel shall meet 1S & IEC Standards. 7. Thore shall be no requirement of CEIG cevtification on LT Net metering services up fa 19 KW capacity, However the consumer shall give a 30 days notice of his intention to commission the plant to the supplier as well as to the concemed inspector ( CEIG), 8. Incase of H-T dedicated feeders the metering may’ be installed as per the existing APERC guidlines 9. During the petiod of synehronization af the SPV with the grid the DEO DEVMEP shall inspect , calibrate and seal the bidirectional meters. Diseom personnel reserve the right to inspect the entine premises al any time and otherwise in accordance with Bleetricity Act-2003. 10, Guidelines on Billing and Payment ® The consumer shall receive a Net import/ Export bill indicating either net export to grid of Net import from the Grid. Tn case af net import bill consumer shall sectle che same as per existing nortns as follows : + IFStis a net Export Bill.thea credit amount shall be enery forward to next month for adjustment against next month import bill. Na interest will be payable on this ceedit forward amount ,Net eredit available in his aceount will be refunded twice in a year based on June and December month bills ofeach year, «Net credit amount payable will be deposited by DISCOM in consumer's ‘bank aceount bering ac mimber provided by consumer at the sage of application, + The amount payable for net export of energy vill be based on the pooled ‘ost decided by APERC for that year. 11. The Process Maw for release of Net metering estimates - Integration af CSC & SAP in the Anmexure~ 3. 12. The procedure of billing for Solar Roof Top Net metering issued in the reference 5" cited is amended as Follows: SNe Pari Taisting Proposed T g The settlement of [ Netersdit available in his registered surplus energy | account will be refunded shall be on carried out on a ‘a year ased on hralf yearly basis(ic.in the | une end December moat month of September and | bills ot each year. March) at the pooled cost notified by the APERC for that year either by way of | credit to consumer account by payment tothe consumer through eheque. 2 13 [inthe Wusteations 1” | TF iris nei Export bil Month billing Net units. 35 then credit amount shall is charged with consumed be carry forward to next | units for consumption of — month fisr adjustment that month, even though against next month import generated units are balance | bill, available, 2.39.5" & 6" month net | 7 units are negative: pays — | 23" 5"& 6 month net for Minimum Charges Miniaynm Charges TENet Units are negative | Deleted the Para this ean i.e, Export units more be read as“ MM.Charges than import units then bill ace applicable far-which shall be issued for ‘consumed nits are Zero or Monthly Misirnusy less equivalent for ‘Charges only, MM Charges” Hence all SE/Speration s are requested to circulate the above field instructions up to all Section offices for wide publicity . Receipt of the Memo may be acknowledged Enel: Annexures: 3n08 Chief General Manager (P&:MM.1PC) Corporate Office:,APSPDCL To, The Superintending Engineer/Operation Vijayawada /Guntur/OngeleyTirupati/Kadapa Nellore/Ananthagur/Kumocl. Copy ta Chief Enginéer /Zone/Vijayawada/Tirupatircumool Copy ta The Chief General Manager/ Finance/ Corporate Office/ APSPDCL, The Chief General Manager/ Operation/Corporate Officer APSPOCL Copy to: General Manager/IT/ SAP/CSC/Corporate Office/ APSPDCL: itis requested to implement the process flow as per Annexure :3 and amend the billing procedure "S£copy to all Divisional Engineers/OpnvWie.P/ Copy submitted Te Director /P&MMIPC/APSPOCL: for favour af information Copy submitted To Director /Operation/APSPOCL; for favour ef information Bere pesRarcue! ant &

You might also like