DEVELOPMENT PERMIT PLAN

ENGINEERING
OCTOBER 2020
1 GENERAL NOTES 2 LIGHTING LAYOUT 3 POWER LAYOUT
E-1 SCALE: NTS E-1 SCALE: 1:50MTS E-1 SCALE: 1:50MTS

9.00 9.00

5.00 4.00 5.00 4.00

c d
c d

5.00
5.00
b b
e e
Sa,b,c

2.19
2.19
ENTRY PORCH ENTRY PORCH
(VERIFY ACTUAL) (VERIFY ACTUAL)

4 LOAD SCHEDULE 7 LEGENDS


E-1 SCALE: NTS 6 RISER DIAGRAM E-1 SCALE: NTS
E-1 SCALE: NTS

Sa
Sa,b
Sa,b,c
S3Wa

5 WIRE SCHEDULE
E-1 SCALE: NTS

PROJECT TITLE OWNER SHEET CONTENTS REVISIONS SHEET NO.


E E E E E
ARCHITECT
E
PRC No. VALIDITY
GOLDEN HAVEN SITE OFFICE GOLDEN BRIA HOLDINGS, INC.
GOLDEN HAVEN
IAPOA No.

PTR No.
OR No. / DATE

DATE
NATHANIEL S. ACOSTA
P
R
P
2
V
0
2
O
3
R
7
5
1
T
D
A
8C
YL
F
:
I:
ES
O
S
IN
E
AL
E
CT
C
RE
A
IN
LG
N
E
IE
R

yS
tC
S
P
Ia
32
T
1R
icU
4
lT
E
6:
arA
D
T
:
E
E
E E E E
E-1
0
4
2
70
8
-N
T
:I 2
0
200
3
,D a
JA
n.T E
:
PLACE TIN LOCATION : BRGY. BANAYBANAY - HALANG, AMADEO, CAVITE ADDRESS : 2/F GOLDEN HAVEN BLDG. C5-EXT. RD. LAS PINAS CITY DRAWN BY : DATE : CHECKED BY : DATE :

You might also like