You are on page 1of 1

Equipment Owner Type / Model

Manufacturer Serial
Manufacture Date Capacity / SWL
Reference Specification API 16A & ASTME 165/E709

A R
Final Result
(A: Accept / R: Reject)

Item Inspection Criteria RESULTS


Pass Fail N/A Comments
1 General Requirements

1.1 Equipment documents are available


1.2 Check the manufacturer’s name plate or stamps.

1.3 Check the material certificates of the equipment and if they


are missing or incomplete conduct a material test.
2 FIELD INSPECTION

2.1 Visually check the equipment for any damage or cracks.

2.2 Measure and record the ring joint grooves, flange


thickness, bolt hole size and number of holes
2.3 Compare measurements to relevant standard
2.4 Perform MPI on the welds between the body and flanges.
2.5 Pressure test to maximum working pressure and record
2.6 Repaint the equipment as required
3 PERIODIC INSPECTION & REPORTING

3.1 Prepare and submit the inspection report.

REMARKS