You are on page 1of 1
Analysis Reaction 3.ACT Decide on appropriate action and implement it. Identity on the control chart The cause of the problem The action taken As far as possible,eliminate the possibility of the special cause happening again 4, CONTINUE MONITORING Plotting shouldcontinueagainst theexisting limits The effects of the pracess intervention should become wisible. If not, it should be investigated. Where control chart analysis highlights an improvement in performance, the effect should be researched in order that: Its operation can become integral ta the process Its application can be applied to other pracesses where appropriate Control limits should be recalculated when out of control periads for which special causes have been faund have been eliminated fram the process The control imits are recalculatedexeluding the data platted for the out of control period suitable sample size is also necessary On completion of the recalculation, you will need to check that all plots lie within the new limits Systematic Variables Statistical Analysis and SPC te

You might also like