MAINTENANCE

REF: MMPL/PM/MTN/00
REV: 00
MYTHRI METALLIZING PVT LTD DATE:
TITLE: LIST OF MACHINERIES

SL.NO. MACHINERIES QUANTITY REMARKS

1 Diesel Compressor 1 No Good Condition

2 5 HP electric compressor 1 No Good Condition

3 Hopper 1 No Good Condition

4 Painting Pressure Pot 2 No Good Condition

Prepared By: Approved By:


MAINTENANCE REF: MMPL/PM/MTN/00
MYTHRI METALLIZING PVT LTD REV: 00
Title: Machine Break Down Register DATE:

BREAK DOWN TIME COST B/D


EQUIPMENT TOTAL DETAILS OF SPARES APPROVE
DATE OF ATTENDED REMARKS
NUMBER FROM TO TIME BREAK DOWN REPLACED D BY
SPARES BY

Prepared By: Approved By:


SITE DAILY INSPECTION REPORT

Date:

Blasting Profile (SA 2 ½ )

Reading 1
Reading 2

Reading 3

Reading 4

Painting DFT

Sl No Primer Mio Finish


Reading 1
Reading 2

Reading 3

Manager Sign: Production In-charge Sign:


MYTHRI METALLIZING PVT LTD SITE PRODUCTION REPORT REF: MMPL
REV: 00

DATE: SHIFT: PRODUCTION REPORT NO:


Sl No Customer/Party Name Description Weight Quantity Star End Time Remarks
Time

Total Vol Of The Job

Total SQM: Total Weight:

Blaster Name: Painter Name: Helper Name:


1. 1. 1.

2. 2. 2.

Manager Sign: Production In-Charge Sign:


MAINTENANCE
REF: CPEI/PM/MTN/00
CORROSION PROTECTION
REV: 00
ENGINEERS INDIA DATE:
TITLE: LIST OF MACHINERIES

SL.NO. MACHINERIES QUANTITY REMARKS

1 Compressor 2 No Good Condition

2 Arc rectifier 4 No Good Condition

3 Hopper 3 No Good Condition

Prepared By: Approved By:


MAINTENANCE REF: CPEI/PM/MTN/00
CORROSION PROTECTION REV: 00
ENGINEERS INDIA Title: Machine Break Down Register DATE:

BREAK DOWN TIME COST B/D


EQUIPMENT TOTAL DETAILS OF SPARES APPROVE
DATE OF ATTENDED REMARKS
NUMBER FROM TO TIME BREAK DOWN REPLACED D BY
SPARES BY

Prepared By: Approved By:


SITE DAILY INSPECTION REPORT

Date:

Blasting Profile (SA 2 ½ )

Reading 1
Reading 2

Reading 3

Reading 4

Painting DFT

Sl No Coating thickness Aluminium paint DFT


Reading 1
Reading 2

Reading 3

Manager Sign: Production In-charge Sign:


CORROSION PROTECTION SITE PRODUCTION REPORT REF: CPEI
REV: 00
ENGINEERS INDIA

DATE: SHIFT: PRODUCTION REPORT NO:


Sl No Customer/Party Name Description Weight Quantity Star End Time Remarks
Time

Total Vol Of The Job

Total SQM: Total Weight:

Blaster Name: Coater Name: Helper Name:


1. 1. 1.

2. 2. 2.

Manager Sign: Production In-Charge Sign: