Professional Documents
Culture Documents
Every Every
ACTIVITES RESPONSIBLE Daily Other Weekly 15th Monthly Remarks
PERSON day Day
IN-CHARGE
The machine
that are
LATHE used to
MACHINE GGS-02 3 Pedestal remove 153-
2 WORK Grinder excess REG
SHOP materials on
a work piece
EQUIPMENT MAINTENANCE SCHEDULE
EQUIPMENT TYPE LATHE MACHINE
EQUIPMENT CODE TOYO mffGE TE-seires CAR, 223
LOCATION LATHE machine Workshop
ACTIVITIES MANPOWER Schedule for the month of
5. Are the inner parts of the machine is still good and nothing should
be replaced?
UNIT NO.
GGF-01 Description: Lathe Machine
Date Reported:
Observation/s:
Overheated Motor Reported by:
INSPECTION REPORT
In-Charge:
In-Charge:
INSPECTION REPORT
Date: Date:
Inspection Repair after Activity
INSPECTION REPORT
Findings: Recommendation:
Motor that been overheated has been replaced and 003-REG is ready for operation use.
ready to be used
Date: Date:
BREAKDOWN / REPAIR REPORT
Date: Date:
Date: Date:
BREAKDOWN / REPAIR REPORT
Date: Date:
Date: Date:
WASTE SEGREGATION LIST
In-Charge :
Cutting Fluid X
Used wrappers X
Broken Equipment’s X
Scrap Paper X
Broken Utilities X
OPERATIONAL PROCEDIRE
Operation Procedure: