You are on page 1of 3

HOUSEKEEPING SCHEDULE

Qualification EPAS NC II Station/Bldg EPAS LAB 1


Area/Section Practical Work Area
In-Charge John Dominic B. Acuña
Schedule for the 1st Quarter, 2023

Every 15th
other Day

Monthly

Remarks
Responsibl

Weekly
Every
ACTIVITIES

Daily

Day
e Person

1. Clean and Trainees X Activity is


check Electronic /Trainer done
tools/ before and
equipment from after using
dust and oil; dry the
and properly equipment
laid-out/secure /room
d/ stable.
2. Clean and Trainees X Activity is
checked print /Trainer done after
and non print using the
materials materials
3. Clean and Trainees X Activity is
arrange working /Trainer done
booths, tables before and
according to after using
floor plan/ lay- the
out; check equipment
stability.
4. Store and check Trainees X Activity is
chemicals/ /Trainer done
solution and before and
sealed properly. after using
the
• Used gloves equipment
to avoid contact
with chemicals

5. Clean and Trainees X Activity is


check floor, /Trainer done
walls, windows, before and
ceilings. after using
the room.
• graffiti/dust/
rust
• cobwebs and
outdated/
unnecessary
objects/ items
• obstructions
• any used
materials/
scraps(slugs,
stubs) spilled
liquid
• open cracks
(floor)
6. Clean and Trainees X Activity is
check work /Trainer done
shop ventilation before and
and after using
illumination by the room.
dusting
lamps/bulbs,
replacing non-
functional
lamps and
keeping exhaust
clean.
7. Clean and Trainees X
check LCD /Trainer
projector and
screen,
computer set - Activity is
monitor, CPU, done
keyboards, before and
mouse – free, after using
unnecessary the
markings, dust; equipment
cables and
plugs are in
order; well-
arranged; all
items functional
8. Clean, inspect Trainees/ X Activity is
air conditioning Utility done
equipment: personnel before and
(in the after using
• keep screen absence of the
and filter free trainees equipment
from /Trainer
dust/rust
• Check
selector knobs
if in normal
positions and
are functional
• Check if
drainage is
OK
9. Clean and X Activity is
inspect wash area done
and rest room before and
after using
Check if
• the room.
drainage is OK
• Rust and
stain
10. Dispose of Trainees/ X Activity is
waste materials Utility done
personnel before and
(in the after using
absence of the room.
trainees
/Trainer

Prepared By: John Dominic B. Acuña Date: May, 2023

You might also like