You are on page 1of 34
HAVELLS INDIA LIMITED ‘A-4611462, MLLA., Alwar (Rajasthan) MAVELLS| TYPE TEST CERTIFICATE XLPE CABLE Date 15.03 2020 Customer M/S HARSH CONSTRUCTIONS PVT. LTO. Description of cable: _-4CXX10SQ.MM 2xWY (STO) FRLSH O/SH 1.1 KV CABLE ‘Copper cond XLPE insulated, PVC inner sheathed, {Gstel wire srmoured, PVC FRLSH outer sheathed cable Ref spec: 18: 7086 (P18 wih upto date amendments x4782620 Spectied Casaner Name of he Test Value Va 1 Blocircal Tests Red Yeliow Bias Black 1.4 High Votage Test (2) ALSKVAC for 5 minutes Should witistans Witstood at room temp for each connection 1.2 Max Conductor Resistance: in Ohmvkr a 20°C (MIN) 183 ae _[ a |e [a8 13 Min. Volume Resistvty in Ohm-em @ marc 1x10" 45% 10" (in) © mockc 1x10" 34x10 (min) 1. Physical Dimensions (rum) (2) Min. Thickness of outer sheath 140 155 (©) Min. Thickness of inner sheath 030 043 (€)_ Nom. Thickness o insulation 070 082 088 = 08s oar (8) Min, Thickness of meusation 053 07 077 075078 (©) Dimension of Armour wiestip 14020004 13970 141 Tested CLASSIFICATION | RESTRICTED Testing ncharge HQAP No: TTR Page? of 2 PARTICULARS OF TEST UNITS [Requirements Observation 46X10 2xW¥ Trewin [insulation Tasulation Sheath Red Yellow Bue Black 1 |witnout Ageing ami | Bae ayTensite Strength (Min) Nim? 125 ms | 168 184 «195 203 | 76 b}EIongation at break(Min) % 180 200 | 25 8 555520 | ass 2 {after Ageing in Air Oven layTensie Strength.) Ninm? | 125 ws | vs 12 197 208 | 186 by€Iongaton at break(Min) % 150 200 | sts 520635 4s | 280 2.1 Jvaseten unaged sample layTensie Srength % 25 2 | 417 109-403-248 | 568. lb Elongation at break % Ey 8 190 2800183 4ar | 1.96 3 [Loss of mass (Max) rmoen? 20 NA NA 038 4 | Shrinkage TestMtax) 4 4 190 05 = 100-480 | 2.00 5. |Hot Deformation TestiMax) 0 NA WA 168 (Depth of indentation) 6 [Heat Shock Test No sign of NA Passes craciscale | NA the Test 7 | Therma Staitty TestMin ) 80 WA NA 125 @ [Hot Set Test: For XLPE insulation la}Etongation under load(Max.) % NA 175 5565. 7% 45 | NA b)Permanent sex(Max.) % NA 6 1200216178145 | NA 9 Jeter absorption (Gravinetic) Max) rmoen? NA 10 | 02 028 088 = 04s | NA 10. [Ftammabaryteston cable tec-222-4 arm s)Unatectes potion rom mm 50 375 lowered of he top clamp. (Man) frTime of buming ater Soc Cy 3 removal of famo(tex) Test on ALICu Conductor. (before stranding)_ As per iS 8130 11 |Anneaing test % Min. 180 282 12. |FRLSH Teston o/sH la) Oxygen index (Min) * 2 335 Jb) Temperature Index (Min) °c 250 355 J) HCL gas(Max) % 20 14.10 |) Smoke Density Rating (Max) % 60 4307 mour wirestrip AAs pers 3975 Tensile Strength Nn? 250 0 580 36570478 Elongation at break(Min) % 6 1438, Uniformity (dp) test - No red deposit Passes the test [Weight of zinc coating(Min) ima 90 1384 [Torsion test on wiros(tin) No “a 68 [Winding test on strips : No crack & zn NA should not Peel off Max. Resistivity of armour ‘chmem Max-14.5 X10 13.26 x10 (Mex CLASSIFICATION | RESTRICTED HAVELLS INDIA LIMITED ‘8-481/482, MLA, Alwar (Rajasthan) HAVELLS| TYPE TEST CERTIFICATE XLPE CABLE Date:- 15.08.2020 Customer MIS HARSH CONSTRUCTIONS PYT. LTD. Description of cable: ACK 6 SQ.MM 2XWY (STO) FRLS O/SH 1.1 KV CABLE Copper cond. XLPE insulated, PVC inner sheathed, steel wire armoured, PVC FRLS outer sheathed cable. Ref spec 1S: 7098 (Pt-1YB88 with upto date ammencments. H1x63500620 ‘Spaced Opsened ame ofthe Test Value Value 1 Electrical Tests Red Yellow Bue Black 1.4 High Votage Test: (2) ALSKVAC for S minutes ‘Should witnstand at room temp for each connection, 1.2. Max Conductor Resistance: in Ohrevkm at 20°C (MIN) 3.08 1.3 Min, Volume Resistivity in Ohm-com (@) arc 1x10" 4:54. 10" (min) (®) atsote 1x10 3.52 10" (min) IL Physical Dimensions (mm) (2) Min. Thickness of outer sheath 124 141 (0) Min, Thickness of ner sheath 030 048 (2) Nom, Thickness of insulation 070 085 087088088 (6) Min, Thickness of insulation 053 077078078076 (0) Dimension of Armour wires 1.4020.04 14070 1.42 Testog By CLASSIFICATION | RESTRICTED HQAP No TTR Page? of 2 PARTICULARS OF TEST TRITS Requirements —Obsevator 4CX6 2XWY ‘Shean [insulin Trsulaton, Sheath RED YELLOW BLUE BACK 1 fovitnout ageing aaa | roma ayTensile Strength (Min.) Nim? 125 m5 | 76 180 185 194 | 176 bje1ongation at break(Min) % 150 20 | soo 540 830 825 | 280 2 |Ater Ageing in Air Oven JayTensie Strength Min.) iment 128 vs | 1 16 189 75 | 182 Elongation at break(Min) % 160 20 | 525 500 | 540840. | 275, 2.1 |waiaton ownage sample layTensie Strength % 25 2s | 208 222 ©0216 = 979 | saat lb}Etongation at break % 25 2 | 500 7410-189 2.86 | 179 3 |Loss of mass (Max) rmgen? 20 NA NA 033 4 | Shrinkage Test(Max) % 4 4 100 075 1004.50 | 150 5 |Hot Deformation Test(Max) % 50 NA NA 163 (Depth of indentation) 6 {Heat Shock Test Nosignot | aya NA Passes caniscale the Test 7 |Tretmat stabity Test(Min.) Moutes 20 WA NA 122, 8 |Hot Set Test: ForXLPE insulation a)Elongation under loed(Max.) % NA 175 7% 80 80 as | NA b)Permanent settMax.) % NA 6 100080150100 | NA 8 |wrator absorption (Gravimetric) (Max) ingen? NA 10 | 011 028 © 044 asa | NA 10, |Flammabity test on cable AEC-392+4 eae a)Unafiectes portion frm mom 50 370 leworodgo ofthe top cto, (Min) byTime of buing ater See 6 2 ‘removal of tameMax) [Test on ALICu Conductor. before stranding)_ AAs por is 8130 11 [Annealing test % Min. 180 332 12 |FRLSH Test on O's la) Oxygen index (Min.) % 29 34 b) Temperature Index (Min ) °c. 250 350 lc) HCL gastttax.) % 20 1339 [s) Smoke Density Rating (Max) % Cy 442 [reet on armour wirelstrip ‘As por IS 3975 13. [Tensile Svength Nim? 250 to 580 365 70 455 14 | Elongation at break(Min.) % 6 132 15. [Uniformity (dip) test e No red deposit, Passos the tost 18. |Weight of zinc coating(Min ) ima 90 a2 17 Torsion test on wires(Min.) No a 70 18 [Winding test on strips - No crack & zn NA should not Peel off 19_| Max Resisivi our obec Maxt4.5 x10 13.6510 QMaxy Tested By CLASSIFICATION | RESTRICTED HAVELLS INDIA LIMITED ‘A-461/462, MALA., Alwar (Rajasthan) TYPE TEST CERTIFICATE UHAVELES XLPE CABLE Date 15.03.2020 Customer MIS HARSH CONSTRUCTIONS PVT. LTD. Description of cable: 4CX4 SQ.MM 2XWY (STD) FRLS OISH 1 Copper cond. XLPE insulated, PVC inner sheathed, G.steel wire armoured, PVC FRLS outer sheathed cable. Ref spec: 1S: 7098 (P18 with upto date ammendments, Hx63395E20, Spector Obeanes ‘Name of the Test Value Value 1 Breetrical Tests Red Yelow ‘Blue Black 1.4 High Voltage Test (9) AL3kVAC for 5 minutes ‘Should withstand witnsteod ‘atom temp for each ‘connection, 4.2 MaxConductor Resistance: in Ofek at 20°C (MIN) 1.3 Min. Volume Resistivity in Ohm-cm (@)atzr'c () atso’c Physical Dimensions (mm) (2) Min Thickness of outer sheath (0) Min, Thickness of inner sheath (©) Nom. Thickness of insulation (6) Min. Thickness of insulaton (@) Dimension of Armour wielstrip Tested sey [Cage [aay [aes] 1x10 44x 10" (min) 1x10? 3.2% 10" (min) 124 148 030 oa o70 ose 087 08s 8s ose om 075 ara os 1 402004 19970142 Testing Incharge CLASSIFICATION | RESTRICTED HQAP No. TTR Page2 of 2 PARTICULARS OF TEST ———] UNITS |__— Requirements Cesanaton 0x4 2xWY Sheath — | sulton Tnguaton. Sheath RED YELLOW BLUE BLACK + Jartnout Ageing Saat a)Tensie Stength (Min Nn? [125 ws | 78 185 «183183 | as b)Elongaton at breakin ) * 160 200 | 500 sso 40825 | 300 2 [ater Ageing in A Oven ayTensio Seengnatin) Nim? | 125 zs | ws 7s 79 we | i179 byElongation at break(Nin * 150 mo | sis os 525 a5. | rs 2.1 |vatonoinages tome layTensie Suenge 1% Fo 2 | 281 sa 219 © 328 | 229 b}Elongation at break Es 25 2 | 300 os 278 «490 | a3 3 flossot mass (Max) moet | 20 NA NA 033 4 | Shvikage Testiax) « ‘ 4 | 100 180 © 100 © 050 | 1.00 5 [Hot Deformation TestMtax) % £0 NA NA 165 (O2pth oF ngentaon) 6 [beat shock Test Nosignot | ya NA Passes crock the Test 7 [Thermal Stability Test(Min rinses | “60 NA NA "22 8 |Hot set Test: ForXLPE insulaton s)Etongation unser toa Max) % NA ws | 65 800 «750 | WA b)Permanent sax) % NA 15 | 150 © 1000150100 | NA 9 [water aosomton Gravinete (a) moet | wa 10 | 02 021 022 om | NA 10 |rammatiay test on able 160-22-1 re cores ame siunatectes poten fom mm %0 360 loweredge ofthe op clamp. sn) brine of tuning ator see 60 2 ‘removal of fame(tax) [Test on ALICu Conductor. (before stranding)_ As per's 8130 11 [Annealing test % Min. 18.0 203 12 |FRLSH Toston ors a) Oxygen index (in) % 2 336 bi Temperature index (Min) 6 250 375 Je) HCL gasiMax.) % 20 134 J) Smoke Density Rating (Max) % 60 446 ‘on armour wirelstrip ‘As periS 3875 13 [Tensie Strength Nim? 250 to 560 375 70 466 14 [Elongation at break(ttin) % 6 132 18 |Uniomity (dp test 2 No ed deposit Poses the test 16. |weight of zinc coatingtMin) gina %0 133 17 [Torsion tst on wices(Min No “6 65 18 [Winding teston stip 5 No crack & 2n NA should rot Peel off 19_| Max Resistivity of amour ormem | Matas x10 13.5610 (Max) Teste: CLASSIFICATION | RESTRICTED HAVELLS INDIA LIMITED ‘A-461/462, MLLA., Alwar (Rajasthan) Date: 15.03.2020 Customer M/S HARSH CONSTRUCTIONS PVT. LTD. Description ofcable- 3X4 SQ.MM 2XWY (STO) FRLS OFSH 1.1 KV ‘Copper cond, XLPE insulated, PVC inner sheathed, G.steel wire armoured, PVC FRLS outer sheathed Cable, Ref spec 157098 (P-1)/88 with upto date ammendments 14X60007E20 Spocttod Casened Name ofthe Test Value Value 1 Electrical Tests Red Yellow Blue 1.1 High Voltage Test: (2) ALSKVAC for minutos ‘Should withstand Withstood ‘at room temp for each connection 1.2. Max Conductor Resistance: in Ohimvkm at 20° (WAN) 4st 457_|_486 | 486] 1.3 Min. Volume Resistivity in Ohm-cm (@ Azo 1x10! 38x10" (min) (©) atootc 1x10 2.4% 10" (min) Hl. Physical Dimensions (mm) (2) Min. Thickness of outer sheath 124 145 (©) Min, Thickness of inner sheath 0.30 os, (c) Nom, Thickness of insulation 070 Cy a (4) Min. Thickness of insulation oss 075 07373 Dimension of Armour wire/stip 1.4020.04 1.3970 1.42 Tostoc/ty Testing Incharge CLASSIFICATION | RESTRICTED. HOAP No: TTR, Pago? of 2 PARTICULARS OF TEST ORTS Requirements ‘Casenaton 30X8 2xWY ‘Seeues | sulin Tasulation ‘Sheath Red Yellow Blue 1 without Ageing waar | Toso, la)Tensite Strength (Min.) Nim? 125 ms | 196 185 176 158 le)Etongation at break(Min.) % 150 200 | 500 © 495510 250 2 |attar Ageing in Air Oven JayTensite Sirengtn(win.) Nim? 125 ws | 2 196 © 189 168 lo)etongation at break(Min.) % 150 200 | 518 500835, 285 2.1 vaste to unaged samp JayTensile Strength 1% 2 2% 714 5953.98 5.06 b}EIongation at break % 2 2 | 300 101 490 6.00 3 |Loss of mass (Max) maton? 20 NA NA 0.26 4 | Shrinkage Test Max) 4 4 075 2001.80 075 5. |Hot Deformation Test(Max) 50 NA NA 162 (Depth of indentation) 6 |Heat shock Test No sign of NA Passos crates | NA the Test 7 [Thermal Stability Test(m iter 80 WA NA 112 8 |Hot Sot Test: For XLPE insulation la)Elongation under load(Max.) % NA 175 a 6s 75 NA JovPermanent set(Max) % NA 18 195 2650.85 NA 9 [Water absorption (Gravimtic) (Max) glen NA 10 | 016 033 026 Na 10. |Ftammabiy test on cable tEC-332-1 aa sss : a)unatiectes portion rom om 50 35 lomeradge of te top clamp. (Min) byTime of buring afer See © 3 removal offame(Max) [Test on ALICU Conductor. (before stranding)_ ‘As por IS 8130 11 [Annealing test % Min. 22.5 293 12 |FRLSH Test on OSH 1a) Oxygen Index (Min.) % 2 325 b) Temperature Index (Min.) °c 250 355 Je) HCL gas(Max.) % 20 1419 J) Smoke Density Rating (Max) % © 489 [Fest on armour wiro/strip ‘As por 1S 3975 43. [Tensile Strength Nim? 280 0 580, 385 TO 436 14 [Elongation at break(Min) % 6 152 15 [Uniformity (ie) test 7 No red deposit Passes the test 18 [Weight of zinc coating(Min.) gma 90 1412 17 _ [Torsion test on wires(Min.) No a 63 18. |Winding test on strips : No crack & zn NA should not Peel off 19,_| Max. Resistivity of armour ohen-cm Max-14.5X10° 13.25 x10 (Max) Test By CLASSIFICATION | RESTRICTED gauuwn viow sani vos zm | omaooera | omrweo [aurea | von aoorens eos | oamiegons z ‘hoor to eons | wieooesras — | omeeroe |eweerse | we om | caowniovs | corms eee eer ami aves st cor000% wore [a we were | remus am 00 ee wi arepao | eamnuwe | _smsosres 2 worera |eoreen | wi rooneeo | wowwuwa | slwsossevs e009 wore |eorern | wi ee ee ad > worwwe [eortow | waarmee | wurRwooao | woomuIve “wasn Gorse Dwar] se20 axoreees | rovers oreo cowenuwe | seovwsia vaisn no o1mm 210] 5 TRUER ae Co le ee enn eer eel uD werent [wore | Ww a voane aauen pie} alo vm woo Oi] er 6st toytesjorat ye To'40 | ozorTO'RO | saoMUAS apa | Hu KE /He KEG OT rood ‘womuney om per now0M KUM YORE IAT ron corer [eorere | wi aropeeao | wares wen queg peo) ai¢ MvORNS ali] TE oe cxocevst | ororerst | mrooomsao | eammuwe | sovanum pre anvoa) ot 2 eoEi0%0 Tomarumeos | ar Aveatoar | woeruwe wa ‘aanomaasro] 6 003 a woman ‘aunonw oe] @ — woreret | w | earoormwostero | eames on ‘wma won| 28 wore | mw | emwoormostoro | swan — 2 190009 cwocerst |erorerat | ww aroneire | emmuwe | seman eas s woes woreest Tw | ewnteor ooe50 ) ‘asi08 9 > wenn reoero10 | oeorww | somesuonn | nroiwoos-o ous . 0009 oworerat fewoeeest | wi res recr recs | SMNREND | verre ‘wow veo von worn] oem | Gomerwenrinat [reoewoua |euesae | smesnamen | on orxenoran | men) | senyomnns vaznrwoveanwomia] T « ' 2 : , * : ye ae ‘Agqorrey| mena] senevere>] | Wnowen june 18037 9 26 ee japow/a40r1 _quswidnbe fo swan) ov speoyan ger foncavan| — fosiea| Kaveporayan | WOMETBA~EY | Jor oy a oN - - * aap NT A ba ReieoRe) ‘INNA DNUSEL 30 STUWIS NOM WARTTO Excellent Services A HOUSE OF TESTING & CALIBRATION 18.34 1037, 8-54, 67, Ganpat Paradiso, Cantal Spl, Vchyadhar Negat, Jajpur302099, Tel: O141-2231774 ‘Mop, 09314501795, 9414611788, Ea! bjesh. singh 6@yahoa com brjshhercelntservices. co, visi us: wwn.excelentoervices.coin cath. cote CALIBRATION CERTIFICATE (Format No. ; QRVET/D4 Rev. 00) Tianie and Addross of Customer Page No Toft ULR Wo. Co2697 20000000780 HAVELLS INDIA LTD. Centicate No, 200110006107 (UNIT- ALWAR WIRE & CABLE) Tob Request No& Date | 202010006716 & 03/0172020_| Calibration Date ‘8/01/2020 \7* ‘A: 461-482, 204-2044 & SP 218, Recommended Bus Bale | 0770172021 MLA, ALWAR (RAL) Cerificate Tesve Date | 10/01/2020 Description & Identification of UUG: Name | Million Mega Ohm Meter (Volume Resistivity) is a OK “Make/ AS. ~ [Range (10 to 1000)*707MD "| Calibration Model ‘any id ‘Least Count | As per results Parameter Fontenet Sr.No. [== ‘Accuracy | = | Calibration zm 7. No, | PALTURINGOS Tocation | RAO Tab Performed At Environment Condition Temperature mac Tuiaty 30- TEMA Dotalls of Standard / Master Equipment Used: fame S.No. Cerificate No Walid up t Calibrated By Megohm Box 100807 ERTL(NVG0(4)-(2019-20A0216 | OB/07/2020 | NABL Cert No.CC-2137 Megotim Box 70 osvi9i/t 2a/1072020_|_NABL Cert. No.CO-2754 RESULTS Range Parameter ‘Avg. Reading on WUC | Evior ‘Expanded Teststance Range | Reading on Standard (0) @ @ Uncertainty (4) 70 20.17M 20.00 DoT AT [10% 10° 200.02M 199.9M 012M 3.15% 17 | 1 2.0066 | 2016 ‘C004 | a 10" ‘20.556 2046 0156 ook 0" 498.106 197.4G 076 0" ‘osozr oor pomoery]| 8% bo Remarks: Tine reported expanded uncertainty is at coverage factor k = 2 which corresponds to approximately bo” 95% for a normal distribution. «_— Methodology of calibration procedure ES/SOP/ET/07 based on (S- 1248 (part-8) and NABL-~129 (4)l— “Certiicates shall not be reproduced except in full, without the written approval of Excellent Services. (_—~ “Readings are taken without adjustment and readings are average of Ssets of reading. Results relate only to the lems caltated, -UWUC: Unit Under Calibration, Engineer Calibration oe Authorized Bignature a Brijesh (Tec! eS Excellent Services™ 2S A HOUSE OF TESTING & CALIBRATION 8.2410 37, 8.64, -7, Ganpat Paradiso, Cental Spina, Vidhyadhar Noga, Jaipur-302030, Tel: 0141-2251774 ‘Mob, 09814501786, 9414011796, Exnal bifesh_singh8@yehoo.com briesh@exceboiserices.coin, viel us: wivwexcellentearicos.co.in CALIBRATION CERTIFICATE (Format No QRM/24 Rev: 00) [Name and Address of Customer Page No. ez [OLR No [ecase720000000775F HAVELLS moIA LTD. [Gerticate Ne. [zo0qve008r3 = (UNIT. ALWAR WIRE & CABLE) [dob Request No & Date _|2020/0008013 & 030172020 [Caroration Date o7o1r2000 JA. 461-462, 204 2040 8 SP 215, [Recommended Doe Date [06/01/2021 = [WL ALWWAR (RAL) [Cerificate Issue Dato [10/01/2020 Description & Identification of UC: [Name [Dlg. Tensile Teating Machine Condlton on Recent [OK maker JPresto a tren a Parameter | Fore Ise. No, [14o74s4763 a apes Tension fgne_[PALTCTEOOT [Gatralon Pertomned At [Site Location RED Lab Environment Condition Calibration Procedure Nor Raom Temp, 230-2350 Ko] _ESISOPAUD based 18-1828 (Par 1-2015 and NABL T2O11G) Dotals of Standard / Master Equipment Used: Womenclature SrNo. | Capacity | CortificatoNo [Valid Upto | _ Gallbrated By ‘Big Thermo Harem isase’ | owe Y90av2002 ‘Yaroer2020 | NABL Cer. No, CC-2587 Load Cet wit Indicator 1158 ‘oon ‘80506001 2670712020 | NABL Cer. No. CC-2567 LLoed Celi with indicate | 10s0000ev_| _2500N ssosinscio2 __ | 28/07/2020 | NABL Cert. No. CO-2507 |Rango/east Count: 0-s00N0.1% FAppICS] sienaard | Standard ‘Observations Oieton Courts Woon] Reais | % Roane | Retatve Force | Reading | Reading | Postion | Positon | Postion Pe | Uneerisny | Ace Ewer | Rp (WUC) | Fromcat. | strtoom | 0" | 2 | 240" | Wo F ) (a) e | eee | Tee Et ee | fuiice1) | (umes1%) ‘a0 | 20002 | 20002 | tee71 | 10088 [toes | op | tesso | osar] o7s,| orem 00 | soc | soa | 29775 | 29760 | 2062s | oo | zoreas | oz] asay-| o17l” woo | score | aooce | 30728 | 2070s | aorae | oo | sora53 | ote | osn~| 00s -”| soo | sooor | sooo: | aris | aon60 | asoss | oo | aooeso | oie] aon] ox, 0 | sooor | sooo | soos | sosoo | soos | oo | socaro | any] aa] 00, a0 | socos | eooor | ros40 | rosos | root | oo | ress07 | ore] soy] oot 1000 | oon | tooo | ase | onisa | onsts | oo | ooaeza | ois 016 zooo| ssi | sso | esiz | ssie | seas | oo | ssorr | oan 00 3000) 8340 e340 | 8209 8305, 8278 0.0 82040 o2y 033i“ soo | sse07_| sscor | s3or6 | yanso | rom | oo | taese0 | o2ay 3s i/| Zero (a me ae Max Ut (4) 707 ‘xiao Resousen __ | —aaxina= 205 —| is acne Hs ean nao As CaseT Eopded Unc, $0205 Eataied Moan Reatve Etor E> (0.75 2 0.50) Engineer-Calibration ‘Authorized Signature Se... Excellent Services A HOUSE OF TESTING & CALIBRATION 8.3410 37. 8.54, G7, Ganpati Paradise, Central Spine, Vitiyadhar Naga, Jlpu-802030, Te: 0141-2231774 ‘Moo. 09314501796, 9414011796, E-mail" brjesh singhi6@yahoo com brjesh@excollerisentees.con, Vitus: www ekcllentservices. coin CALIBRATION CERTIFICATE (Fomet No: QRNM¢24 Rev. 00) Catoraon Dats ___oriov20z0 I age No.2 of2 Recommended Due Date _[os/o12021 I LR No |ec2s8720000000176F RangofLeast Count Repay Sond | So aa Di Wan | Rai | Rae | Te farce | Reading | Rexdng | Posion | Poston ] Poston | Oratory | Ace nor | Rep (Woi| Femea | stmoom | or | sz | aa” | wo fe P|) ey [eon | torp | ex | 2 | Fs umes | cunts) Zero ror a. iit) 7a ‘inv Revhsion ocinn 208 his Machine as Geen Gaaiied As mas Expanded Unceraiy 7 Frinated Mean Relate Error E= (J Range/teat Com [Apetied] standard | Standard Ceaeriatine Nien Conm Woon | oteiative | = Palaiva | wRelaive orce | Reading | Resdng | Postion | Postion | Positon Beatie | ace enor |" Rep. ET re rr rd A | "Soe | ome | red ea | re ene] cast) Baro Gor fax Umit) 204 “Relative Resotion ioe: £05 is Woche tos Goon Cnetieg As Cane: Expanded Uncertainty? Estimated Mean Relative Error: E= ( )%| REWARKS: “The reported expended uncetaltyis at coverage factor k=2 which carespends oa coverage probebbty of approximately $5% or @ normal estou, considering the cforent components such ae 200 ex reeahton,. tepectaiy Unceany of ference Stade, This machin hasbeen verted and he resut have been found within he penis lms 3 per S-1628 (pat) 2015 y= Result ela only thems atated Ceriicaes shal rol be reproduced except in ful without the witn approval of EXCELLENT SERVICES — UU: Unit Under Catraton, Engineer-Caltbration ‘Authorizd Signature 28S ew a sger) ‘Excellent Services ‘A HOUSE OF TESTING & CALIBRATION 4.36, copa Prae, Cantal Sole Miyata Nop pt 392 023, TO 223774 Fax: 1798 Sort soo \Dbencohenteeivices. con, vik us ; warw.excollentservices coin eo, : 09514801756, 8414014706, Eat’ Brjsh_slnghi8@yahoo.com.briesh@o CALIBRATION GERTIFICATE Tartraion bas [oroaneo Pape No [bot aconmened Due oats [ovat TUR a= [RigetCcant Count Seta =i Det of Standard / Maser Equgiont Woe Tomanaatre Shs | Capacly | Ceriiate No [Val upto] ——_cattratea oy Be. Fel Gms =ouatT | won| —— Toarseacro 1] orrtanap PAB Con. No, COREA vee vmen _[-ecreviorees |Upo2ave.| __roveesina | ance | NABL Cot No. C02587 _pesuers at peea on DUC fnin}]”Obsered Renna on Standard ror Expanded Unceraily (rmmimin) (mmimnin) “ 200 19997 G00 20 2099 om s 4 i ‘a 070% pm me pita cs (7 x0 09s oar REMARKS: ‘heey expand uri a eran ar cone oti ete er Seba Ee Goa ee on oe atin repentabiny, Uncerianty of reference Standard. ath, ‘This machine has been verified and the result have been found within ine permnissioke ks as per 1S-1626 (part) 2015 Feeaeate on to alte rat sat ect ite tin po XCLLENT SERVICES {Que Ut Unde Caeaton. Aasueing 9°. 80665, EngineerCaliration ——/ Excellent Services ™ ZS A HOUSE OF TESTING & CALIBRATION 8-34 i937, 8-54, 6:7, Ganpali Paraiba, Contra Spine, Vidhyadhar Noga, eipur902039, Tol: O141-2291774 ‘Mob. : 09814501760, 9414611706, E-mail: brieah singht6@yatoo.com brjesh@lexcolaniservices.co.n, vist us : www.ercallonteervicas coin CALIBRATION CERTIFICATE (Format No. ; QR/M/05 Rev. 00) ‘anno and Address of Customer age No Toft ULE No. ‘C2597 FHO00O0OTEAF HAVELLS INDIA LTD. Cericata No- TooTO00ETO = (UNIT: ALWAR WIRE & CABLE) Job Request No & als | 2020/0000 8 0510172020 Calbation Date 08/0172020_ ‘Ad -462, 204-2040 8/SP 218, Recommended Due Date | 070072021 = MLA, ALWWAR (RAL) Cestcata asus Date | 10901720007 Description & dontiiction of UUG: Name | Stool Scale of Conductor Resistance Measurement App. | eK Wake’) ets ‘Range 0-4000mm y% Calibration Model east Gaunt tm | _ Parameter Sr.No | = Accuracy = Catbraton | {ap Ta. No, — | PALTESHOE Tocaton RED La T= | Performed at Environment Condition Temperaure atop] ___ Humiy OT ORR Details of Standard / Master Equipment Used: Name Seo. No- Certificate No | Valid up | ——Calibratoa by Tsaswing Scale & 0567 a00049055 | 0671072020 | NABL Cort. Ne.CO-BT05 Tape Calbrater | _ ESMECHMSETCIOY RESULTS SW. WOE Value ‘Avg. Value Ov St Error (ou) (own) (rom) i 50 50.005 70.035 2 400 100,068 0068 3 200 200.102 Ea 4 400 400.743 O14F > 5 500 600.189, 99 6. 800 800.245, 0246 z 000 1000.32 a2 Expanded Uncertainty ¢ 117m Romarks: The reported expanded uncertainty is at coverage factor k=2 which corresponds to a coverage probability of — L—~ approximately 95% for a normal distibutlon. Ya “Methodology of calibration procedure ES/SOP/M/26 based on IS: 1481:1993 and NABL 129-1(A)._ L=— Certificates shall not be reproduced except in ful, without the writen approval of EXCELLENT SERVICES, b “Resi relate only ta the toms caltrated Authorized/ignature Brjesh , (Technic aranager) “Readings are taken without adjustment and readings are average of 3 sets of readings. -UUC: Unit Under Calibration — aA Ge Excellent Services™ 2S ‘A HOUSE OF TESTING & CALIBRATION 8.2410 97, 6-54, @-7, Ganpat Paratise, Central Spine. Vidwyedhar Nager,Jeipu-902030, Te: 0141-2291774 Mob, : 08014801796, 4474011796, Esnal rrfesh singh i@@yahoo.com brkesh@excetenisendoes.coin, vist us wavw.excllentserwoes con CALIBRATION CERTIFICATE. (Format No. ; QR/TH2 Rev. 00) Mame and Address of Customer Page No Toft TLR Ro. ‘062587 2000000077F HAVELLS INDIA LTD. Certificate NE. zo0to0828 - | (UNIT- ALWAR WIRE & CABLE) Job Request No & Date 2020/06/29 & 03/01/2020 Calibration Date ‘sr07r2020 ‘Ac AB1- 462, 206 - 204A & SP 216, Recommended bus Dale | 0801/2021 = MLA, ALIVAR (RAL) Coniiate esue Date | 1000172020 Deseription & Identifieation of UC: Conalion on Name | Conditioning Chamber ree OK MRT) Sountron Range 0-80°C, T0-SSHRH | Calibration | Temperature Model Teast Count [O° &tmRH | Parameter_| / Humidity Sco [== ‘Reawracy | #1°C AF 2GRH_V— | Calibration ae [__16. No. PALTLTCOZ0/HCO02 Location RAD Lab a Performed At Environment Condition Temperature T Baee From SOTERA Dotals of Standard / Mastor Equipment Used: Tame ‘Be. Wo.nd. No. ertficate No | Valid up to Calibrated By ‘Thermo Fiygrometer | 61095247 /20268654 | 1910/1481/04 | _25/V072020 | NABL Cert, No.GC-2507 ‘ith Sensor JESITHVTHM.-02 RESULTS ‘Temperature @ 50% RH Humiaity @ 25°C S.No] Avg. | Avg. | Error | Expanded avg | Avg. | Eor | Expanded Master | uc | ('c) | Uncertainty | No. | master | uuc | (%RH) | Uncertainty voy_| ce) ® car) | (aR) (2) T_ | _ 19.39 | 19) Ome Oso | 1 | 220 | 2 | 02a TexRh 2_| 2321 wi | oii os 2 a6 M_| 046i 1.6%RH | 3. 29.93 20.8 Diy OSC 3. AST cu -O54/| 1.6%RH 4 31.17 310 | 017) ose | 4 36.65 36 __| 0657) _1.6%RH 3. [3789 | ara | 0A] orc | 5_| 7ag2 | 75 | 082] 1.6%RH v 6 aaa, a22z__| 022] 05°C 4 _6. 30.99 eo | Os T8%RH 7 | 5608 | 498 | 023, os'c | 7] 9108 | 90 | -109,] 1.0%RH Remarks: The reported expanded uncertainty is at coverage factor k=2 which corresponds to # coverage probebilty L— of approximately 95% for a normal distibution. -Methodbology of calibration procedure ES!SOP/tI05 based on DKD-RS-7 and NABL-129(5).— Certificates shal not be reproduced except in fl, without the written approval of EXCELLENT SERVICES, |_—~ Results relate ony tothe items calibrated, “Readings are taker without adhustment -UUC: Unit Under Calibration — Format No, : SEIS.10/F8 Rev. 08 Engineer- Calibration Authorized Signature arjesh unBrSingh (Cechnidgt ttanager) Pi anda Cen af K is Excellent Services™ ZS A HOUSE OF TESTING & CALIBRATION 1-34 fo 37, 6-54, 6.7, Ganpali Paradso, Canal Spine, Vettyachar Nagar, Jipu-202038, Tal :0141-2231774 Mo, : 09814501785, 9414011796, E-mal‘bresh singh 6@yahon.com bikeh@excolontsarics.co., vish vs wwexcellentservces coin CALIBRATION CERTIFICATE (Format No. ; QR/702 Fev. 00) ame and Addross of Customer Page No tol TLR Ne. ‘Geus57200000010F HAVELLS INDIA LTD. Gerficata No. 700170006720. (UNIT. ALWAR WIRE & CABLE) Job Request No Date | 2020/0006/28 & 0370112025 Calibration Date o70772000 > ‘Ac 61-402, 204 - 2044 8 SP 215, Recommended Due Dale | 060172021 = MLA, ALWVAR (RAL) Coriicate Issue Date | T0r01/2020_\ = Description & Identification of UC: Wave | Contonng Chamber wee] on WaT) Soamiron Range 080°C, 1099RH_y | Calbraion | Temperature Model ‘Least Count | 0.1°6 & 14RH Parameter_|_/ Humidity ‘Sr.No [= Aesuracy [41°C &E24RH | Calibration am Wd. No, | PALTLTCORATHCOGS | Location | REDLab >| Performed At Environment Condition “Temperature Bae Hamat 3-7 RA Details of Standard / Master Equipment Used: se Namie i. Nos. No. aticato No Calibrated By ‘Thermo Hypronveter | 67095281 / 20268084 | 1etort4etie4 | —26/1012020 | NABL Cert. No.CC-2507 ‘With Sensor /ESTHMTHM.02 RESULTS Temperature @ 60% RH Humiaty @ 25° SWo] Ave. | Ava. | Error | Expanded | 8. | Ave | Avo | Enor | Expanded master | vuc | (0) | Uncertainty | Wo. | taster | Uuc | (ARH) | Uncertainty coy | rey c (ari) | CARH) () | 2021 [204 | or op ose | ates [a 0267] TeRRA 2_|-as83_[ 232 | 0.19] 05's] 2] 3542] 35 _| 00g] 1 OMRRY 3__|3005 | 298 | 0.19} 05" yp] _3._| 4086 | —40| -0.54 —16%RH 4 [3128 |— aif | tar] osc] 4 | 6562 | 85] 0644 _1o%RH 5__|_3rm_| 375 | -0aw| —osyy | 6._| 7508 | 75 | -08@/| —1.6%RH, 6. | 4233_[ a1 | oza7} 05% | 6 | 108 | 61 | 096] _1.6%RH 7 [80.15 | 489 [025] orc] _7_| at. | 90] =1.11] —1.6%RH | Remarks: ~The reported expanded uncertainty is at coverage factor k=2 which corresponds to @ coverage probability’ of approximately 95% for a normal dstrbution. Methodology of calibration procedure ES/SOP/T/05 based on DKO-RS-7 and NABL-129(5) uae Certificates shall not be reproduced except in ful, without the written approval of EXCELLENT SERVICES, Results relate only to the items calibrated. -Readings are taken without adjustment _— -UUC: Unit Under Calibration = Format No. : SEIS. 10/F8 Rev. 04 Engineer- Calibration Authorized Rignature Briesh Kyhar Singh rager) A] HAVELLS INDIA LIMITED ALWAR, RAJASTHAN HAVELLS —_antsosoor2esis0 sen012015; 10 «soot 2018 carted Company) CALIBRATION CERTIFICATE Page 1 of2 Name and Address of Customer: UL Namber c303219000001433F Havells India Limited, Certificate Number HIVE/i9i014 (EHV Plant) Date of issue 28.42.2019, 4-461/462, SP-215, MLA. Alwar, Rajasthan [Date of Calloration 21.12.2019) Suggested Due Date 20.12.2020 Location of Equipment: PD Test Room Service Request No. Bate | AC-09/21.12.2019 Calration Performed at Site UNIT UNDER CALIBRATION i: or alan [eas escent tate Te Oto 125/250/35007 Fitted with — east Count/Resslution | 300 Make/ttodel Shanghal tanpo ‘Accuracy/Acceptance Creda | £3 % of rag. Sr.No. /10 Nox PACTLAVOOS Calibration Range Sto 145 kV Test Parameter ‘AC High Voltage Visual inspection Satisfactory STANDARD EQUIPMENT USED FOR CALIBRATION Name ~~ [ make/Model |” se.No. | Range/ Lease | cortifcate No | Calibration | Calibrated By Count Valiity Copadive Rectiher & | 1400972071 | —Oto2s | REL/CAL/AB- | 26.08.2070 te Voltage Oivider | Eiectronics | 1748 | kW/OoLKv 19/387 Capacitive Power Peare | Oo ISOW/A | RPsRO-OORTAA | 26052000 FoR Voltage Divider | control wv Environmental Condition during Calibration Galration Reference [151348 (Pare-3) Temperature") zz Calibration Procedure | HILCAL/SOP-01 Humidity G6 RH) « Format No. HIV? 8/07 Electrotechnical Calibration RATT d up 0100) ‘hug. UUCReading | error Expanded Coverage Factor ky) oy Uncertainty (100) z 30 30 216 200) z 50 =Oa 216 2.00 3 a © = a6 2.00 4 a Ey “a 436 200 5 ioe 100 2 a6 2.00 We et calltated by Author (¥inod Kumar) {Sanjay Kaushik/Umesh Kumar/Arhit J6era) Calibration Engineer Quality/Technical Manager’ ‘Address: A-461/461 & SP-215, M.1.A. Alwar-301030, Rajasthan (INDIA) Email: amit jangra@havells,com ; vinodS kumar@havells com Contact: 0144-2854100/4229; Web; wwvchavells.com & HAVELLS INDIA LIMITED ALWAR, RAJASTHAN HAVELLS —tmsosoorams;1s0 140012015; 15045001: 2018 certied Company) CALIBRATION CERTIFICATE Page 2 of2 Certificate of Calibration ‘ULR Number €C203219000001433F Series resonant test system (ID No. Certificate Number HIL/E/191014 PACTLHVO09) ‘Range 250 kV AC (Calibrated up to 145 kV) ‘Sr.No. | Avg. Masterinstrument | Avg. U.U.C Reading Error ‘Expanded Uncertainty | Coverage Reading (KY) wr wv) (210%) Factor (k) i ~ a z ae 2.00 z © a z 436 2.00 3 20 a z 436 2.00 a 320 302 2 a6 2.00 5 5 144 a a6 2.00 ‘Uncertainty of Measurement: The reported expanded uncertainty of measurement s stated as the standard uncertainty of measurement multiplied by the coverage factor k + Atleast'S measurements were made for each calibration point and an average ofthese was reported in the results. 2 Guidelines and notes provided on the backside of this certificate. nani (Sanjay etl nn Jape uality/Technicat al calibrated by (Vinod Kumar} Calibration Engineer Address: A-461/461 & SP-215, M.I.A. Alwar-301030, Rajasthan (INDIA) Email: amitjangra@havels.com ; vinod9 kumar@ havells:com Contact: 0144-2854100/4229; Web: www.havells.com & HAVELLS INDIA LIMITED ALWAR, RAJASTHAN HAVELLS {am 150 $001:2015; 160 14001:2035; $0 45001 2018 Certified Company) CALIBRATION CERTIFICATE — Wame and Address of Customer: ‘LR Wurber eaoaaIg00NOOTISIF Havells India Limited, Certificate Number HILJE/190984__L— (Research & Development) Date of issue 28.122019 + ‘A-461/462, SP-215, M.A. Alwar, Rajasthan ‘Date of Calibration 18.12.2019, Suggested Due Date 17,32,2020 Location of Equipment: Fire Testing Lab ‘Service Request No. & Date ‘AL-O7/13.12.2019 Calibration Performed at site UNIT Equip. For Calibration _| Digital Temperature Controller with Sensor_| Range/Size Oto 100° 5 Fitted With ‘Smoke Density Test Apparatus Lesst Count/Revolution | O1"C ‘Make/Model SA Associates ‘Accuracy/Acceptance Criteria | + 0.5% of reading_| ‘Sr.No. /IDNO, PALTLTC039 Calibration Range owsrc Test Parameter | Temperature Visual inspection Satisfactory STANDARD EQUIPMENT USED FOR CALIBRATION Wame | Make/Model | Sr.No, | Range/ ease | Certiieste Wo | Calibration | Callrated By Count Nalidity Precision RadijRadieat | 115001659 | Multiple | WmIJe/i90I3e | i2.08.2020 | Havellindia Calisrator ameter Limited, Alwar Environmental Condition duriag Calibration Galbration Reference | 181248 (Part-3) Temperature{"C) m2 | Calibration Procedure HIL/CAL/SOP-18 Humidity (% RH) 49 Format No. ‘HIL/7.8/OMF-06 Electrotechnical Calibration ‘CAUBRATION RESULTS 3. | Ave: Measured Reading | Avg: Standard Reading | rvorin"€ | Expanded Uneeriainty | Coverage No. inc in'C (a)("c)_, | Factor (k) 1 300 29.80 a 028 2.00 z w0 Er i | Er) 200 3 100.0 7 oO rs ‘+ Uncertainty of Measurement: Te reported expanded uncertainty of measurement is stated aqthe— standard uncertainty of measurement multiplied by the coverage factor k. ‘+ Atleast § measurements were made for each calibration point and an averagé-of these was reported in y_- the resutts. * Guidelines and notes provided on the backside ofthis certificate. We btiale (Vinod Kumar) (Sanjay Kaushik/Umesh Kurtat/Arit Jae Calibration Engineer ‘Quality/Technical oo ‘Address: A-461/461 & SP-215, M.I.A. Alwar-301030, Rajasthan (INDIA) Email: amitjangra@havells.com ; vinod9,kumar@havells.com Contact: 0144-2854100/4229; Web: wwwhavells.com HAVELLS INDIA LIMITED <2, 8 ALWAR, RAJASTHAN lassie HAVELLS (an ts0 9001:2015; 50 14001:2015;1$0.45001: 2018 Certified Company) ESS CALIBRATION CERTIFICATE Ghee Name and Address of Custom ULR Number €C203219000001393F Havells India Limited, Certificate Number ‘it/e/190986_ (Research & Development) Date of Issue 28.12.2019 ‘A-461/462, SP-215, M.LA. Alwar, Rajasthan Date of Calibration 18.12.2019 Suggested Due Date 372.2020 = Location of Equipment: Fire Testing ‘Service Request No. & Date "AL-07/13.12,2019 L— Calibeation Performed at site INIT UNDER CALIBRATION DETAILS ‘Equip. For Calibration | Digital Timer Range/Size Dio9Min p> Fitted with Smoke Density Tes Apparatur Least Count/Resokition [0.01 Min. I= ‘Make/Model ‘SAAssociates: “Accuracy/Acceptance Criteria | 0.02% of reading U ‘St. No. /1D No. PALTLTIMO06. Calibration Range Ot09Min. 17 Test Parameter Time ‘Visual Inspection Satisfactory STANDARD EQUIPMENT USED FOR CALIBRATION ‘Name ‘Make/Model ‘Se. No. Range/ Lease Count | Certificate | Calibration | Calibrated By No. | validity Dighatstopwarsh | Casto | CAYSWOT | OToz¥Wwa/OOK gar | 2O0032I8 | 01.02.2020 | Beli Caloration Environmental Condition during Caloration Galbration Reference | Si348 (PaS) Temperature("C) 243 7 T calibration Procedure HIL/CAL/SOP-03 ‘Humidity (% RN) a5 v_| Format No, Hi B/OMF-12 Electrotechnical Calibration: CAUBRATION RESULTS Se] Aves Measured ‘vg Standard Reading ‘rrorin | Expanded Uncertainty | Coverage no._| Readinginttin. | He. Min, See. _1/100See. | Sec. (#)(See) Factor (e) 1 1 00 00 38 9 001 03s 2.00 2 3 a) 38 on 036 2.00 3 Soe 9 et | a 7 wo oF 00 05 70057 039 7_| 200 5 3 00 o =007)7 04647 | 200 ‘+ Uncertainty of Measurement: The reported expanded uncertainty of measurement Is stated as the standard uncertainty of measurement multiplied by the coverage factor k. ‘© Atleast S measurements were made for each calibration point and an average of these was reported in Le ‘the results, + _ Guidelines and notes provided on the backside ofthiscertiiate, y= Calibrated by (Vinod Kumar) Calibration Engineer rand {Sanjay Kaushik/Umesh KeharPAmt Jangra) ‘cauinranas\ 2) Quality/Technical Manager {+ (tec ‘Address: A-461/461 & SP-215, M.l.A. Alwar-301030, Rajasthan (INDIA) Email: amit s.com ; vinod9,kumar@havells.com Contact: 0144-2854100/4229; Web: www.havells.com HAVELLS INDIALIMITED <<, &) ALWAR, RAJASTHAN pes HAVELLS —— tinisoson:01ss0sec:23s 0 e501: 208 ceried company) CALIBRATION CERTIFICATE NABLILACIOZS4 Wame and Address of Customer: UiR Number e203219000001384F Havells india Limited, ‘Certificate Number HIVE/190977_— (Research & Development) Date of issue 28.12.2019 4-461/462, SP-215, M.LA. Alwar, Rajasthan | Date of Calibration 28.12.2019 ‘Suggested Due Date 17.12.2020 Location of Equipment: Fire Test Lab ‘Service Request No. & Date | Al.07/13.12.2019 © ‘Calibration Performed at site UNIT UNDER CALIBRATION DETAILS Equip. For Calibration [ OC Volk Meter Range/size oeev Fitted with ‘Smoke Density Test Apparatus Least Count/fesolution ory ‘Make/Model SAAssociates ‘Accuracy/Acceptance Crteria_| + 1 % of a Se. No. [10 No. PALTLVMOOL Caloration Range ieee “Test Parameter DC Voltage Visual inspection —~Tiatisfactory = STANDARD EQUIPMENT USED FOR CALIBRATION Wame | Make/Model | Sr.No. | Range/ ease | Certificate No | Calibration | Calibrated By Count Validity Maltiproduct | Fluke/Ss02a | 3185804 Multiple | ERTUNVSO(a- | 19.12.2013 ERTUN) Calibrator Paramettrs | (2038-19)/80877 Environmental Condition during Calibration Calibration Reference | 15 1248 (Part) ‘Temperature("C) 22 _ | Calibration Procedure HIL/CAL/SOP-09 Humidity (5 RH) 46 | Format no. HIY7.8/0MF-O1 Electrotechnical Calibration Se. ] Avg. Measured Reading | Avg. Standard Reading | Error in | Expanded Uncertainty | Coverage No. inv inv (2) (4) Factor (k) 1 1.00 100132 305 0.05 2.00 2 2.00 2.0028 000 7 0.08 7 2.00 3 3.00 3.0064 =001y7 oat 2.00 4 4.00 4.0088 =001)7 013 2.00 3 6.00 60148 =001 018 p= 2.00 ‘+ Uncertainty of Measurement: The reported expanded uncertainty of measurement is stated as the standard uncertainty of measurement muiplied by the coverage fatork. ‘+ Atleast 5 measurements were made for each calibration point and an average of these was reported ink the results. * Guidelines and notes provided on the backsie ofthis certificate. = Qe 6 Ailet caftrated by ES uttorbeb Se i (Vinod kumar) / (Sanjay Kaushik/Umesh Kumat)Amit sgigra} Calibration Engineer ‘ Quality/Technical Manager Address: A-461/461 & SP-215, M.I.A. Alwar-301030, Rajasthan (INDIA) Email: amit.jangra@havels.com ; vinod9.kumar@havels,com Contact: 0144-2854100/4229; Web: www.havells.com & HAVELLS INDIA LIMITED ALWAR, RAJASTHAN HAVELLS so soox201s:50 1400n2015;150 45001: 2018 ceed company) CALIBRATION CERTIFICATE ORES Name and Address of Custorner: Gia Number ‘CERRRISODOONISTOF Havells india Limited, Certificate Number _ ‘HIL/E/190963. {Research & Development) Date of sue 78.12.2019, ‘A-461/462, SP-215, M.L.A. Alwar, Rajasthan _| Date of Calibration. 46.12.2019 1 ‘Suggested Due Date 15.12.2020 | _ Location of Equipment: Thermal Test Lab Service Request No. & Date AL-07/13.12.2019 Calibration Performed at site UNIT UNDER CALIBRATION DETAILS Equip. For Calibration | Digital Timer; —— | Range/size 0t0.99.89 Min Fitted with Hot Set ‘Least Count/ Resolution 0.01 Min. ‘Make/Model ‘Countror/1050 ‘ceuracy/eceptance Criteria 005 6 of reading ‘Sr. No-/ 1D No. PALTLTMOOS >= Calibration Range (0t0.90 Min, | “Test Parameter Time Visual inspection Satisfactory. STANDARD EQUIPMENT USED FOR CALIBRATION Name Make/Wodel |" Sr.No. | Range/Lease Count | Certificate | Calibration | Calibrated By No. Validity Digital Stop Wateh Casio _| CAL/SW-03 | Oto 24 Hre/O0ISec | 20003218 | 01.02.2020 | Belz Calibration Environmental Condition during Calibration Calibration Reference 5 1288 (Pare) Temperature("C) mar Calibration Procedure HIL/CAL/SOP-03 Humidity (% RM) % Format No. HILT B/OMFA2 Electrotechnical Calibration CALIBRATION RESULTS Sr. | Avg. Measured ‘Aug. Standard Reading ercorin | Expanded Uncertainty | Coverage No. | Readingin Min. | Hr. Min. Sec. __1/100Sec. | _ Sec. (2) (See), Factor (k) 1 1500 [00 14 59 98 0.02] 0.68 2.00 4 3000 ~+(|00 2 58 34 ‘006 >t iB 7 200 3 a00*([00 48 «58 w 0m | 12) 200 a 000 [0 89 58 Cy 06 | 28 p 200 5 o00 ~+fol2CB af 08 (| 340 200 ‘+ Uncertainty of Measurement: The reported expanded uncertainty of measurement is stated as the standard uncertainty of measurement multiplied by the coverage factor k. ‘Atleast 5 measurements were made for each calibration point and an averagé.of these was reported in the results. + Guidelines and notes provided on the backside of this certificate, ~~ \ yr ay. abt (Vinod Kumar) (Sanjay Kaushik/Umesh Kunlar/Amit Jphera) Calibration Engineer Qualty/Teehnical Manager ‘Address: A-461/461 & SP-215, MLA. Alwar-301030, Rajasthan (INDIA) Email: amit.jangra@havells.com ; vinod9,kumar@havells.com Contact: 0144-2854100/4229; Web: www.havells.com. & HAVELLS INDIA LIMITED ALWAR, RAJASTHAN HAVELLS —_—emnssosoorc20is;1so 14001-2015; 15045001: 2018 ceri Company) CALIBRATION CERTIFICATE Name and Address of Customer: ‘VLR Number 1€6203715000001397F Havells India Limited, Certificate Number HIL/E/190990 (Research & Develogirent) Date of tssue 28.12.2019 ‘A-461/462, SP-215, M.LA. Alwar, Rajasthan | Date of Calibration 18.12.2019 Suggested Due Date 17.12.2020 = Location of Equipment: Electrical Test Lab Service Request No. & Date | ALO7/13.122018 Calibration Performed at site UNIT UNDER CALIBRATION DETAILS Equip. For Calibration | volt Meter Range/Sixe 3,100, 500] Fitted With Volume Resistivity ‘Least Count/fesoiution iv ue ‘Make/Model Shivananda/t$:38 ‘Aceuracy/Acceptance Criteria | 0.5 %ofrds. | ‘Sf. No. [1D No. PALTLVMO08, = Calibration Range 13, 300, 500V | “Test Parameter DC Voltage Visual inspection Satisfactory STANDARD EQUIPMENT USED FOR CALIBRATION Name | Make/Model | Sr.No. | Range/tease | Certificate No | Calibration | Calibrated By Count Validity Diaital Flake/@eaga | 3186009 Muttple | ERTUNVAO@)- | 19.12.2019, eRTUN) Multimeter Parameters | (2018-19)/80876 Environmental Condition during Calibration ‘Gilibration Reference 15 1288 (Part-3) “Temperature('¢) "22 | Calibration Procedure | HIL/CAL/SOP-10 Humidity (RH 6 = __| Format No. HI? 8/0MF-O1 Electrotechnical Calibration CALIBRATION RESULTS Sr | Avg: Measured Reading | Avg. Standard Reading | ErrorinV | Expanded Uncertainty | Coverage No. inv inv. (2) (4), Factor (ik) T 8 $9816 . 2.08 2.00 z 700 35.5740 cae oa 200 3 500 499.715 ° iz 058 | 2.00 ‘Uncertainty of Measurement: The reported expanded uncertainty of measurements stated as the standard uncertainty of measurement multiplied by the coverage factor k. ‘© Atleast 5 measurements were made for each calibration point and an average of these was reported in the results. + Guidelines and notes provided on the backside of this certificate. Le. : Aly {Vinod Kumar) r (Sanjay Kaushik/Umesh Kur Calibration Engineer ‘Quality/Technical Manager ‘Address: A-461/461 & SP-215, M.A. Alwar-301030, Rajasthan (INDIA) Email: amit.jangra@havells.com ; vinod9,kumar@havells.com Contact: 0144-2854100/4229; Web: www.havells.com @ HAVELLS INDIALIMITED <<, ALWAR, RAJASTHAN HAESIRA HAVELLS (an s0 001.2015; 150 14001201550 450012018 Ceres Company) 4/7 CALIBRATION CERTIFICATE Pee ‘Name and Address of Customer: UL Number CRSRTODROOOTSEEE Havells india Limited, Certifcate Number HIL/E/190962,_— (Research & Development) Date of sue 78.12.2019 A-461/462, SP-215, M.1.A. Alwar, Rajasthan Date of Calibration 16.12.2019 = Suggested Due Date 35.12.2020 Location of Equipment: Thermal Test Lab Service Request No, & Date AL-07/13.12.2019 Calibration Performed at site UNIT UNDER CALIBRATION DETAILS Equip. For Calibration | Digital Temperature Contrplfer with Sensor | Range/Size Oto oe Fitted With. Hot Set Test Apparatus Least Count/Resolution orc ‘Make/Model Vertex/\/T48264 ‘Accuracy/Acceptance Criteria |#0.2°C l= ‘St.No./ 10 NO. PALTETCOIS a Calibration Range Oto 4000 = ‘Test Parameter ‘Temperature Visual inspection Satisfactory STANDARD EQUIPMENT USED FOR CALIBRATION, Wame | Make/Model | Sr.No. | Range/Lease | CertificateNo | Calibration | Calibrated By Count Validity Precision Racix/Radieal | 15002659 | Multiple] HIVe/is013 | 12.08.2020 | Havelis india Calibrator Parameters Limited, alwar Environmental Condition during Calibration Calibration Reference 15.1248 (Part-5) Temperaturet"C) 242__ © | Calibration Procedure HIL/CAL/SOP-28 Humidity (% RH) “6 Format No. HIL/7-8/0MF-06 Electrotechnical Calibration CALIBRATION RESULTS ‘St. | Avg. Measured Reading | Avg. Standard Reading | Errorin°¢ | Expanded Uncertainty | Coverage No. in’c in‘t wee Factor () 1 400 oot 00 033 2.00 % 7200 720.00 00 033 2.00 3 2000 7200.04 00 ee 2.00 4 200) 273.95 00 038 2.00 3 400.0 398.91 a 056 2.00 ‘= Uncertainty of Measurement: The reported expanded uncertainty of measurement isstated asthe —— standard uncertainty of measurement multiplied by the coverage factork. = (== Atleast 5 measurements were made for each calibration point and an average of these was reported in the results + Guidelines and notes provided on the backside ofthis certificate, —-—~ Oe (Vinod Kumar) Calibration Engineer (SanjoyKausi/umesh Kuma Amt pha) uality/Technical Manager ‘Address: A-461/461 & SP-215, M.A. Alwar-301030, Rajasthan (INDIA) Email: amitjangra@@havels.com ; vinod9 kumar@havells.com Contact: 0144-2854100/4229; Web: www.havells.com HAVELLS INDIALIMITED 3s & ima ( ALWAR, RAJASTHAN HAVELLS (fn ts0 9003:2015; $0 14003:2085; 150 45001 : 2018 Certiied Company) CALIBRATION CERTIFICATE ce i Name and Address of Customer: LR Number ‘3c203219000001396F Havells india Limited, ‘Certificate Number HIL/e/190983 (Research & Development) Date of tssue ze2010 ‘A-461/462, SP-215, M.I.A, Alwar, Rajasthan Date of Calibration 36.12.2019 ‘Suggested Due Date 17.22.2020 Location of Equipment: Electrical Test Lab Service Request No. & Date | AL-07/13.122019 Calibration Performed at Site ‘UNIT UNDER CAUBRATION DETAILS Equip. For Calibration | Dial Micro ohm Meter Range/Size oui Fitted With = Least Count/Resolution As per results L= ‘Make/Model RTS/RMO-36 ‘Accuracy/Acceptance Criteria | 20.03% ( + O-2 ‘Sr.No. [1D No. PALTLRMOO2 Calloration Range ima@to1a L= ‘Test Parameter ‘DC Resistance Visual inspection Satisfactory USED. ame ‘Wake/Model | Sr.No. | Range/ tease | Certificate No | Calibration | Callrated By Count Validity ‘Standard ‘gest | ooia > | 1901/0438 Resistance cosaw — | s7me76 02 1 | 1901/083/300 | 08.01.2020 | Excellent S755 aa 7 | _1901/o83/101, Services Siandard Wawel 330 | ima@toik@=| 1901/083/103 | 08012020 | excellent Resistance Sox Services Environmental Condition during Calibration Calibration Reference 151248 (Part-3) Temperaturel'C) 7421 _| Calibration Procedure | HI/CAL/SOP-13 Humidity (% RH) « Format No, HIL/?.8/OMF-A3 Electrotechical Calibration CALIBRATION RESULTS ‘St. | Avg. Measured Reading | Avg. Standard Reading | Error in (Q) | Expanded Uncertainty | Coverage Now (9) (a) 2%) Factor (X) q 09982m 2465m ~O2a8im) 070 = 2.00 2 2.996 30.300m =9.106m 0607 2.00 3 3.9m 100.10m =oaim p>] 060 200 @ 0021 1.0055 0.0034 = 070 p- | 2.00 ‘+ Uncertainty of Measurement: The reported expanded uncertainty of measurement i stated asthe 1 standard uncertainty of measurement multiplied by the coverage factor. | ea ‘+ Atleast 5 measurements were made for each calibration point and an average of these was reported in the resus, ‘+ Guidelines and notes provided on the backside ofthis certificate.) 7” (winod kumar) (Sanjay Kaushik/Umesh Kurhar/Amit gra) Calibration Engineer i Qualty/Technical Manager Address: A-461/461 & SP-215, M.I.A, Alwar-301030, Rajasthan (INDIA) ‘Email: amit.jangra @havells.com ; vinod9,kumar@havells.com Contact: 0144-2854100/4229; Web: www.havells.com &® HAVELLS INDIA LIMITED ALWAR, RAJASTHAN HAVELLS (ano 9001:2015; $0 14001:2015; 180 45001 : 2018 Certified Company) CALIBRATION CERTIFICATE Name and Address of Customer: ‘inmomber ceaosniBOOOOOLAOGE Havells india Limited, Certieate Number HLM i9042 = tneaarch & orvdedieanl Date of sue 30.12.2039 ‘A-461/462, SP-215, M.I.A. Alwar, Rajasthan Date of Calibration. 18:32:2019_ Suggested Ove Date 97.322020 = Location of Equipment: Fire Test Lab Service Request No. & Date AL-07/13,12.2019_ — Calsration Performed &t [ste UNIT UNDER CALIBRATION DETAILS quip. For Calloration_[Presure Gauge Range/Size Dio aa ited with Srioe Density Tes Apoaratus Least Count esol 0. kgm k= Make/Model Waaree Accuracy/Acceptance £3 % offs. 1 St. No. /1D No. PALTLPOGE Callration Range Oto 4 bafsgem Test Parameter | Temperature Visa inspection Satisfactory (_— D FOR CAUBRATION ame Wediamof | Ss.No. | Range/ease | Cetiente No | Callvation | Calibrated By Pressure ‘Count Vatsey Pneumatic Pressure Pneumatic | 25451802 | -1to 25bar/ | 0C273319400002363F | 22.01.2020 Belz Caloetor with Dial 0001 opr, calibration Pressure Gauge | Environmental Condon during Calibration Calibration Reference | OXDREE NARLIDD Temperature("C) 25.2 Calibration Procedure ‘HIL/CAL/SOP-07 ‘Humidity (% RH) $3 | Format No. ‘HIL/7.8/QMF-11 Electrotechnical Calibration ‘CAUBRATION RESULTS Pressure Pressure indicated on Standard ‘Mean (P) ‘Measurement | Hysteresis ‘Expanded Coverage Applied on (kg/ern2) ((i.en3)/2 Deviation IM2-M1[ | Uncertainty | Factor (kj) inter) ‘mii (up) | M2 (down) | 13 (up) tere Pens | fen | Meee He aoe [ance | eae | “he 00 | 0000 coat | — 200 Zo | 2007 | 00s —|i008 | Love 00 1 | 0.02 aca | 2.00 20 2008 | 2006 | 2010 2007 00 L~ | _ 0.002 008 p= | 2.00 30 [30m [300 | 302 | —s010 ot | 0001 ace 17] 2.00 40 [| a0 [40] 016 | —a0is 00) | 0008 oae =| 2.00 + Uncertainty of Measurement: The reported expanded uncertainty of measurements stated asthe standard uncertainty of measurement multiplied by the coverage factor k. + Atleast 5 measurements were made for each calibration point and an average of these was reported inZ=— ae Sf lbersedornsroiad osu belieclii nein Vt ted by ws Altre (Vinod Kumar} (Sanjay Kaushik/Umesh Kurbas/ shor) a Sa ero ines ‘Address: A-461/461 & SP-215, M.1.A. Alwar-301030, Rajasthan (INDIA) Email: amit.jangra@havells,com ; vinod9,kumar@havells.com Contact: 0144-2854100/4229; Web: www.havells.com & HAVELLS INDIA LIMITED ALWAR, RAJASTHAN HAVELLS (An 180 9001:2015; 150 14001:2015; 50 45001 2018 Certified Company) CALIBRATION CERTIFICATE Page: 10f2 Name and Address of Customer: LR Number ‘ec203219000001405F—— Heavells india Limited, Certificate Number HIL/M/190455. (Research & Development) care ot neat ae ee A-461/462, SP-215, MILA. Alwar, Rajasthan ete of Caltsration 19122019 Suggested Due Date 38.12.2020 Location of Equipment: Mechanical Test Lab | Service Request No.& Date | AL07/13.12.2019 Calibration Performed at Site UNIT UNDER CAUBRA’ Equip. For Calibration_| Digital Weighing Balance. Range/Sive Oto SKE Fitted wrth N/A ‘Least Count/Resolution 0.001 Kg._\ 7 ‘Make/Model Interface ‘Accuracy/ Acceptance Criteria | + 0.02 Kg Se. No. /1 No. PALTLWSGO2, Calibration Range ‘to S Kg ‘Test Parameter Mass Visual inspection Satisfactory ‘STANDARD EQUIPMENT USED FOR CALIBRATION Name] Make/Model Se-No, Range/Accurac | Certificate No | Calibration | Calibrated By Class Validity WENSAR 756 mg to 200@ | METSAR/2348/ | 04.06.2020 | __ WETSAR Standard (€2cass) ‘we/0o ~~ _| recnowocies Weight Set [B.C Sinha | BLS1718/5/10028 |The (Fi Class) | WMICI/F/2019- | 01.02.2021] Weightronics '181738/F/20029 | 2kg(F1Class) | 02/2589 '151718/F/50030 | 5 kg (F1 Class) Environmental Condition during Calibration Galibration Reference OIMLR76-1& NABLAZO | Temperaturel ) 246 Calibration Procedure | HIL/CAU/SOP-06 ——~ Humidity (% RH) 46 Format No. HIL/7.8/QMF-10 Mechanical Calibration CALIBRATION RESULTS inearity Error st. | Ave Measured | Avg- Standard Reading | error (kg) ‘Banded | Coverage Factor (2) No. | _ Reading (ka) (ee) Uncertainty if 0.020 5200000, ‘0.000 71 Fr} 2 0.030 0.030000 0.000-~ om 2.00 3 0.050 °0.0500000 0.000 = O74 200) a ‘0100 ‘.i00000% 0.000 = on 7 | 200 5 0.200 02000002 0.000 = on 700 6 ‘0500 '0.5000005 2.000 on 700 {(Minod kumar) Calibration Engineer - vl” 07 ‘Author! (sanjay rappin ie Jara) Quality/Technicat a ‘Adare: 161/461 & SP-215, M.A. Alwar-301030, Rajasthan (INDIA) Email: amit jangra@havells.com ; vinod9,kumar@havells.com Contact: 0144-2854100/4229; Web: wenwhavells.com & HAVELLS INDIA LIMITED ALWAR, RAJASTHAN HAVELLS ——tensoscoxans; so ac:2015 500012018 cred compan) CALIBRATION CERTIFICATE Page: 2 of 2 Certificate of Calibration aR narbar cexaaTisooo001403F Weighing Balance (ID No: ALTLWs002; Range:0 Ming Slnex 8 mare rapa S| Aug Measured] — hug Standard Reading] Evora) | —tapanded—] Coverage Factor io. | “Reading (i) Sg) Uncertainty (2 9) 7 7.000 Toow0o8 000 on 2.00 8 2,000 ‘2.000078 ~~ 0.000 O71 2.00 3 5000 50000150 3000 on 200 Repeatability: Repeatability of the balance at maximum capacity is 0,001 kg and at half capacity 0.001 ke. Eccentricity Error: Eecentrcity of the balance Is 0,001 kg. re ‘Uncertainty of Measurement: The reported expanded tincertainty of measurements stated as the _ standard uncertainty of measurement multiplied by the coverage factor k. ‘Atleast 5 measurements were made for each calibration point and an average of these was reported in ‘the results, Guidelines and notes provided on the backside of this certificate. ae Mole caste by é sutrorked Soh (Vinod Kumar) E (eau (Sanjay Kaushik/Umesh Kump/Alnit Jara) Calibration Engineer ‘ Quality/Technical Manager ‘Address: A-461/461 & SP-215, M.1.A. Alwar-301030, Rajasthan (INDIA) Email; amit.janara@havells.com ; vinod9 kumar@havells.com Contact: 0144-2854100/4229; Web: vww.havells.com

You might also like