You are on page 1of 8

1994

h/1 TUBE42.7*3.6

6
6

No. In assembly
100 H/1
100 H/2
No REV MARK REVISION DESCRIPTION REV. DATE
h/1 TUBE42.7*3.6 SS400 200 1994.0 0.26 6.6
MARK SIZE GRADE No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 52.84 1316.3

DRAWING
HANDRAIL SINGLE PART
Tekla structures

NAME:
CONTRACT No: BOMBANA PO DRW SCALE: 1:5
PROJECT: WAREHOUSE ISSUE DATE:
REVISION: REV DATE:
993 987

R2
00

585
5985

h/2 TUBE42.7*3.6
6

987

No. In assembly
50 H/1
No REV MARK REVISION DESCRIPTION REV. DATE
h/2 TUBE42.7*3.6 SS400 50 8450.6 1.14 28.4
MARK SIZE GRADE No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 56.88 1420.3

DRAWING
HANDRAIL SINGLE PART
Tekla structures

NAME:
CONTRACT No: BOMBANA PO DRW SCALE: 1:10
PROJECT: WAREHOUSE ISSUE DATE:
REVISION: REV DATE:
987 6 4006 987

R2
00

585
5985

6
h/3 TUBE42.7*3.6

No. In assembly
50 H/2
No REV MARK REVISION DESCRIPTION REV. DATE
h/3 TUBE42.7*3.6 SS400 50 8450.6 1.14 28.4
MARK SIZE GRADE No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 56.88 1420.3

DRAWING
HANDRAIL SINGLE PART
Tekla structures

NAME:
CONTRACT No: BOMBANA PO DRW SCALE: 1:10
PROJECT: WAREHOUSE ISSUE DATE:
REVISION: REV DATE:
990 70 40

30
2*D18

54

h/4 L60*6
6

1100

No. In assembly
150 H/1
No REV MARK REVISION DESCRIPTION REV. DATE
h/4 L60*6 SS400 150 1100.0 0.26 6.0
MARK SIZE GRADE No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 38.44 895.0

DRAWING
HANDRAIL SINGLE PART
Tekla structures

NAME:
CONTRACT No: BOMBANA PO DRW SCALE: 1:5
PROJECT: WAREHOUSE ISSUE DATE:
REVISION: REV DATE:
30

2*D18
40 70 990

54

h/5 L60*6

6
1100

No. In assembly
150 H/2
No REV MARK REVISION DESCRIPTION REV. DATE
h/5 L60*6 SS400 150 1100.0 0.26 6.0
MARK SIZE GRADE No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 38.44 895.0

DRAWING
HANDRAIL SINGLE PART
Tekla structures

NAME:
CONTRACT No: BOMBANA PO DRW SCALE: 1:5
PROJECT: WAREHOUSE ISSUE DATE:
REVISION: REV DATE:
5990
965 2000 2000 1025

w/1 UNP150
70 40

70 40

70 40
2*D18 2*D18 2*D18

No. In assembly
22 W/5
26 W/7
2 W/9
No REV MARK REVISION DESCRIPTION REV. DATE
w/1 UNP150 SS400 50 5990.0 2.93 95.9
MARK SIZE GRADE No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 146.46 4796.2

DRAWING
WALKWAY SINGLE PART [
Tekla structures

NAME:
CONTRACT No: BOMBANA PO DRW SCALE: 1:10
PROJECT: WAREHOUSE ISSUE DATE:
REVISION: REV DATE:
5990
965 2000 2000 1025

w/2 UNP150
70 40

70 40

70 40
2*D18 2*D18 2*D18

No. In assembly
22 W/5
26 W/7
2 W/9
No REV MARK REVISION DESCRIPTION REV. DATE
w/2 UNP150 SS400 50 5990.0 2.93 95.9
MARK SIZE GRADE No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 146.46 4796.2

DRAWING
WALKWAY SINGLE PART [
Tekla structures

NAME:
CONTRACT No: BOMBANA PO DRW SCALE: 1:10
PROJECT: WAREHOUSE ISSUE DATE:
REVISION: REV DATE:
w/4 L60*6

830

No. In assembly
132 W/5
156 W/7
12 W/9
No REV MARK REVISION DESCRIPTION REV. DATE
w/4 L60*6 SS400 300 830.0 0.19 4.5
MARK SIZE GRADE No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 58.02 1350.7

DRAWING
WALKWAY SINGLE PART [
Tekla structures

NAME:
CONTRACT No: BOMBANA PO DRW SCALE: 1:5
PROJECT: WAREHOUSE ISSUE DATE:
REVISION: REV DATE:

You might also like