Standard Method of Test
‘Mechanical Mixing of Hydraulic Cement Pastes
‘and Mortars of Plastic Consistency
AASHTO DESIGNATION: T 162.
{ASTM DESIGNATION: C 305-91)
Score racket a¢ shown in Figure 1A or IB 3.2 Paddle—The paddle shall be
(NOTE 1)ewhich shal be sed to miain- readily removable, made of stainless
1 Thiemetbodeoversthemechasi- inthe clearangeWeiwesn the ower end steel and shall conform, tthe, basis
1, Ti tire en pees of he paddle and the beim ofthe bow design shown in Ee Phe
“s monars of plastic coositency fot greater dian 25 tam but not lest sions of the paddle shall be such that
ae ot isco invve haz- ab 08 mim (lhe approximate diameter when in the ming poston ihe padoe
J Tit rane ens ant equips of gran of 20-30 Ottawa smd) when outline canfoms (@ the coneut of
fn Thus standard does not purport ote bow! ise he mining position bow! sed with the mixes. and the clear-
ldress all of the safety problems, if
bys associated with its use. It is the
ance between corresponding points on
the edge of the paddle and the side of
the bowl in the position of closest ap
NOTE 1—When the beacker it in jhe
a associ wih iO sued one eston Seca the moor HOUSE
sponsibility ofthe user ofthis standard eps ae to te font and facing upward
ee roa fet a an eta al be aetna 40 em
“establish poping oe cay Oe hea Le ne ean Bat not less han OF
FeptmoryItadon pert 0%. ean ae tt Pole he tool ising Rowi—The_ removiie
oe eee antl steed de mixing bows have anomaly
amend i Was raonarnsce, Iya Lal bof pve sare
SIGNIFICANCE. AND USE tenths oton imine et, VGC A73
er ee alae Letom ee ate ba
2.1. This method is intended for use existing thveaded holes in the bottom ‘of ihe Figore nd shall be made
21 This mebod is inended fr we eau, The cpm wo fo ge OF sn ee ey bed in
ste mechanical ining of pas ine anew be ied ow i they SSMPDS MATA ‘will be positively held in
7 ig ae ees oe ey theming apart a fe poston
Tine ihetoca oe Ure te ming proeedre Tees
\. APPARATUS
AA Mixer—The mixer shall be an
sjectrically driven mechanical mixer of
bye epicyelie type, which imparts both 2
slanetary and a revolving ration to the
friner paddle, The mixer shall have @
fninimam of two speeds, contelled by
‘efinte mechanical means. (Rheostat a
justment of speed wil not be acceptable.)
The first, or slow speed shall revolve
tne paddle at 2 rte of 140 * 5 1pm,
svi a planetary motion of approximately
62 rpm, The second speed shall revolve
the paddle ata rate of 285 = 10 tpm,
‘vith a planetary motion of approximately
125 rpm. The eleetic motor shall be at
veast 124 W (lg hp)! The mixer shall be
‘equipped with the clearance adjustment
nettle mee ye te Corp. es
‘OC eee anor e es Fearcwens FIGURE IB Clearance Adjustment Bracket
300re METHODS OF SAMPLING AND TESTING 301
35. Supplementary Apparanss—The 6.14. Stop the miner for 15 seconds
balances, night, glst graduntes, and and dorng tk tice scrape down ino
ny other supplementary sppacais used the beth any paste tat may have col
in caning aod prepa the mortar lected'on the side ofthe bowl
trates prot to mixing sal conform 6.5 Stantheminerstmediam speed
tothe respective requirements for such (289 = 10-mpm) and mix for | mine
paras specitied nthe method forte
the parculr test for which the momar
is sing wepare
PROCEDURE FOR MIXING
4. TEMPERATURE AND MORTARS,
HUMIDITY
7A Place the dry paddle and the dey
4. The temperature of the room bowl inthe mixing poston ia the mixee
Shall be maintained between 20 and Then introduce the materials fora batch
27.5°C (68 and 81,5°F), andthe tempera- ‘ito the bowl and mix in the follow-
fe of the dry materials, paddle, and i Manner:
‘bowl shall be within the above range at ‘7-12 Place all the mixing water in
the tine of test, The temperature of the te bow
‘mixing water shall not vary from 23°C 74.2. Add the cement to the water;
(3. by tore than = LTC GR), ‘hen sta the mixer and mx atthe slow
42. The relative humidity of the lab- Peed (140 = 5 rpm) for 30 seconds.
ortary shall ot be less than 50 percent, 7.3 Add he ete quanti of sand
slowly over a 30-Second period, while
reixing at slow speed.
Tilt Stop the mite, change 10 me-
&. taremnats, Ts” Sen te oe
mmoroaroNsc, i e285 10pm sd
Conststency
TALS Stop the mine and let the nor-
tar stand for 1h minutes. During the
S.1_The materials and their propor- first 15 seconds of tis interval, quickly
tions and quamities shall conform to he scrape down ino the batch aay moar
Fequrements contained in the partiular har may have collected on the side of
‘method tor which the paste or monar i te bowl; thea forthe remainder ofthis
being prepared interval, cover the bow! withthe fd.
7.1.6. Finish by mixing for ¥ minute
at medium speed (285 10 spa).
ont 4—& PROCEDURE FOR MIXING 7.47 in any cate equiig emis:
FIGURE3 Mixing Bow! PASTES ‘Heorin bow sal equ seaped
6.1. Place the ry paddle and the dey Sowa into the batch w
‘ow! in the mixing postion in the mixer, PROF fo remixing,
‘Then inzoduce the materials for abate
he provided a lid, made of a aonab-
sovbing material not attacked by cement.
34 Seraper—The scraper shall con-
sistas semingdrabier ae ached 180 te Bowl and mixin te follow NOTE Caen The anaes e-
fst of semis rb ble suche TP oe ween pail and bowl specified in this
handle about 150 mm Yong, The "8 TT ine ining wate ined wt Sub when sig Hadad
blade shall be about 75 mm long, 50
sun wide, and tapered 10 a thia edge
bout 2 mm thick,
‘mortar made with Onawa saad. To permit the
ricer to operate freely and to avoid serious
612 Add the cement 10 the water sss pala cs oe tae Sec
and allow 30 second forthe absorption SSueuay at eed, aay be weeny tonet
NOTE 2—A bichen tol known asa plate of the water. the clearance adustnent bracket to provide
sad tow! soraper conforms 1 these require 61-3. Startthe mixer and mix at slow greater clearances than hose specifi in Sex~
sens speed i140 + 5 rpm) for 30 seconds. dun 34
the bowl