RENCANA ANGGARAN BIAYA

PEKERJAAN BAJA LAP. BULUTANGKIS

NO URAIAN SAT VOLUME HARGA SAT (RP.)


A. PEKERJAAN PERSIAPAN
1 Pek. Betelan Poer M3 2.058 150,000.00
2 Plat Poor 60x60 M3 0.43 3,500,000.00
3 Kolom Poer 25/25 M3 0.26 3,500,000.00
Jumlah A
B. PEKERJAAN BAJA
a. Rangka Baja
1 Rafter/Span IWF 150 KG 420.00 20,000.00
2 Kolom IWF 150 KG 504.00 20,000.00
3 Plat pengaku 6 mm KG 45.22 20,000.00
4 Plat penahan gording 6 mm KG 25.43 20,000.00
5 Base Plat 10 mm KG 42.39 20,000.00
6 Gording C 125 KG 488.00 20,000.00
7 Trikstan besi beton D.10 mm KG 22.20 20,000.00
8 Ikatan angin besi beton D. 12 mm KG 42.24 20,000.00
9 Listplank C 125 KG 98.80 20,000.00
10 Jarum keras + besi beton D.12 mm BH 8.00 60,000.00
11 Angker Baut 5/8" x 16" BH 24.00 65,000.00
12 Moer baut5/8"x 2" BH 72.00 3,500.00
13 Moer baut 3/8"x 1" BH 96.00 2,500.00
Jumlah ( a )
b. Atap zink alume
1 Atap zink alume 0,35 mm M2 112.00 65,000.00
2 Nok zink alume (plat 0,4 mm) M1 14.00 65,000.00
3 Talang Air (0.35 mm alume) M1 28.00 150,000.00
4 Drilling skrup BH 560.00 1,500.00
Jumlah ( b )
TOTAL JUMLAH

Makassar, 7 Mei 2013


Pelaksana,
AMIN ISKANDAR
JUMLAH (Rp.)

308,700.00
1,512,000.00
918,750.00
2,739,450.00

8,400,000.00
10,080,000.00
904,320.00
508,680.00
847,800.00
9,760,000.00
444,000.00
844,800.00
1,976,000.00
480,000.00
1,560,000.00
252,000.00
240,000.00
36,297,600.00

7,280,000.00
910,000.00
4,200,000.00
840,000.00
13,230,000.00
52,267,050.00