EEP000093-12102310-1-ST-ARR-0002 REVISION 1

A A

FH15 DS29 FH16 DS30 DS31 FH24 DS32 FH25

B
2020
4320

2300 2200
48800

44400 2200 2300


4320

2020

O N B

I
50 50

FHC
A A B B

T
C/L OF EXISTING STACK

CL OF I.D FAN
CL OF I.D FAN
4100

C C

FHA

R U
T
42050 48900
UNIT - 1

D D

DS29 FH16 DS30


PLAN AT EL. + 0.00
1:50

FH17 DS29

2300

N S FH16

2200
4320
DS30

2120
FH17
4 Nos. - Ø 24 x 60 LG.

O
C C 50
BOLTS TYP @ HB CON.
2300 2200 2120
FHC HB3
E 50
FR1 NOTE : E
+1100 HB3 FR1 HB2 CP4

C
CP3 1. ALL DIMENSIONS ARE IN mm.
T.O.S 15
0
4 Nos. - Ø 24 x 55 LG.
BOLTS TYP @ CP CON. 2. READ THIS DRG. IN CONJUNCTION WITH DRG. NO. EEP000093-12102310-1-ST-ARR-0001
70 (U.N) 3. FOR DETAIL DRAWING REFER DRG. NO. EEP000093-12102310-1-ST-DET-0001 TO 0012
70 HB1

4100
HB2 4. CUT AND BUNDLE FOR TRANSPORT IF NECESSARY.
15
0 B2 5. PARTS WHICH ARE TACK WELDED FROM SHOP, SHALL BE FULL WELDED DURING
B1
STRUCTURAL MEMBER
CP2
ERECTION AFTER PROPER POSITIONING.
BY OTHERS
1300

F
+0
-200
U/S OF BASE
PLATE

O R FHA

4 Nos. - Ø 24 x 60 LG.
BOLTS
CP1

2490 2390 1930


4 Nos. - Ø 24 x 60 LG.
BOLTS
1

0
GRID MARK CHANGED & VIEW ADDED

ISSUED FOR CONSTRUCTION


PRS

PRS
JD

JD
SKA

SKA
23.09.2019

28.05.2019
F

F
REV. DESCRIPTION CREATED BY CHECKED BY APPROVED BY DATE

C-C
PROJECT

1:75
MEJA THERMAL POWER PROJECT STAGE-I (2X660 MW)
WET FLUE GAS DESULPHURIZATION SYSTEM
EEP-000093
A-A EMPLOYER

D
1:25
MEJA URJA NIGAM PVT. LTD.
(A Joint Venture Company between NTPC and UPRVUNL)

G G
DS31 FH24 DS32

E
CONSULTANT
DS31 FH24 DS32 FH25
D D FH23
2200 2300 2020
2120 2200 2300
4 Nos. - Ø 24 x 60 LG.
FR1 50 BOLTS TYP @ HB CON.
50

U
+1100 FR1
T.O.S FHC FGD CONTRACTOR
HB3
4 Nos. - Ø 24 x 55 LG.
CP3
BOLTS TYP @ CP CON.
(U.N) GE POWER INDIA LIMITED

S
CP4

HB1

4100
QFGDM SUB CONTRACTOR

H H
B1 B2

S
STRUCTURAL MEMBER
CP2 GE COMPANY, USA
BY OTHERS
HB2 6 Nos. - Ø 20 x 60 LG.

I
BOLTS
+0
FHA NTPC DRAWING NUMBER Rev. No.

-200 CP1
4 Nos. - Ø 24 x 60 LG.
SUPPORT STRU. ARRANGEMENT UNI
4 Nos. - Ø 24 x 60 LG.
U/S OF BASE BOLTS
BOLTS
GE DRAWING NUMBER
Rev. No. Sub-Contractor`s Drg./Doc. No. Rev. No.

PLATE 1930 2390 2490


2250 2250 EEP000093-12102310-1-ST-ARR-0002 1 N.A. N.A.
D-D Prepared Scale Type Format
1:75 NIH A1
ISSUED FOR
I B-B
Checked Title
I
1:25
CONSTRUCTION MK
ELEVATION & PLAN
PRS 23.09.2019
Issued by:............Date:................. Approved Approved (QFGDM)
We reserve all rights in this document and in the SA N.A. BOOSTER FAN INLET DUCT SS
information contained therein. Disclosure to third parties Dept : ENGG Language
without express authority is strictly forbidden. Date No. of sheet Sheet No.
© General Electric Company and/or its Affiliates, 2018
GE Power India Limited 17.05.2019 1 1 OF 1 ARRANGEMENT UNIT-1 en