LOAD CENTRE IN M = (114x1.2+68X5.5+68X8.5+68X11.5+68X14.

5)/(114X2+68X4)

= 5.713

DIST CENTRE FR0M 68 =5.713-5.5

=0.213

=0.1065(CENTRE BETWEEN LOAD CENTRE AND NEAREST HEAVY LOAD)

=3.2+1.2+4.3+0.1065

=3.2-(8.8065-8)( position of first load )

2.8965
3
2.3935 1.2 4.3 3

0.1065
8m 8m

RA RB

Total load on span=114*2+68*3=432kN

RB= (114*2.3935+114*3.5935+68*7.8935+68*10.8935+68*13.8935)/16=181.5495kN

RA=432-18.5495=250.4505

Moment at centre of span=250.4505*8-114*5.6065-114*4.4065-68*0.1065=854.88kN

This ordinate is under the central 68kN load (8-.1065)*(8+.1065)/16=4

This is ordinate at 2nd 114 kN load from left 4*(8-.1065-4.3)/(8-.1065)=1.82

This is ordinate at 1st 114 kN load from left 4*(8-.1065-5.5)/(8-.1065)=1.21

This is ordinate at 2nd 68 kN load from right 4*(8+.1065-3)/(8+.1065)=2.52

This is ordinate at 1st 68 kN load from right 4*(8+.1065-6)/(8+.1065)=1.04

Maximum BM=68*4+1.82*114+1.21*114+2.52*68+1.04*68=859.5kN