General Note

-All dimensions are in mm.


except those in elevations
-Use concrete quality.
.C-25 for all Structural members.
.C-30 for column and shear walls.

- Use Reinforcement quality .


.For all Diameters, Use S-400.
- Use concrete cover.
15mm for slabs & Walls
25mm for Beam and columns
50mm for Footings.
STAIR CASE PLAN 3 - Provide at least a1.2m wide
concrete apron all around
the building with surface
SC. 1:50 drainage ditches draining
away from the building.
- Use this drawing in conjunction
with AR drawings.
C

D
- Start all Beam Stirrups at
50mm distance from face
5000 C D 1 of column
-Foundation depth shall be
decided at site
1 Ø14c/c150 - 2540 -All stirrup measurements are

170

170
4 2200
270 external
2
300

160
Ø8 per step

0
20
5 3
300 1348 1463 300 6 Ø8/250 1900

170
50
86
0 -5
c / c15 600
4 1 1565
Ø1

170

170
80 03
2020
-5
1 2 34 c/
4 1
0
c15 590
Section B-B
2335 Ø1 sc.1.25

170
Ø8c/c200 - 670 4
340

330
60
50
11 11 0-
5
1
/c1 600
4 c
270270270270270270270270270

10
270270270270270270270270270

1
10 900
Ø
5279

9 9
8 8
7 7
6 6
5 5 R

4 4 Section D-D DALLOL


3 3 Scale 1:25 4Ø16 CONSULT
4
2 2 ዳሎል አማካሪዎች

400
1 1 x
4Ø20
No DATE INITIAL REVISION
3

300 CONSULTANT:
300

DALLOL
250 CONSULT

50 0
ዳሎል አማካሪዎች dallolconsult@gmail.com

5
PROJECT NAME:

350
G+5 GUEST HOUSE

350
OWNER:
AYSHESHUM TEKA
250 STRUCTURAL DESIGN:
x Ø10 c/c100-1300
ASMELASH BEKELE PSTE/3081

JUBA
5

DRAFTING BY: DATE OF ISSUE:


MAR,2021
DRAWING TITLE: Scale:
STAIR CASE DETAIL.

DRAWING STAGE: DRAWING NO:


FINAL DRAWING ST-12''/12