V GOVERNMENT OF THE PEOPLES REPUBLIC OF BANGLADESH

MINTSTRY OF TIOME AFFAIRS


Border Guard Bangladesh
lnvitation for Tenders (lFT)

1 Ministry,Division Ministrv of Home Affairs


2. Agency Border Guard Bangladesh
J. Procuring Entity Name Director General, Border Guard Bangladesh
1. Procurins Entitv Code Not used at present
5. Procuring Entitt' District Not Applicable
6. lnvitation for Construction of Various Wdrks in Border Guard Bangladesh'
1. Invitation Ref No 44.02.t205.07 .03 .301 .21 12

8. Date 30 lune202l.
KEY INFORMATION
o Procurement Method Open Tenderine Method (OTM)
FUNDING INFORMATION
10. Budget and Source ofFunds GOB Fund
PAR' TICULAR INFORMATION
1l Project/Programme Name (if As per Ser No 6.
aoolicable)
12. Tender Package No As per Ser No 23,
tl
lJ. Tender Package Name As per Ser No 23.
Date
1tr
I+. Tender Publication Date 02 Julv 2021.
15. Tender last Selling Date 25 iuh 2021.
Date Time
t6. Tender Closing Date and Time 26 Julv 2021. 1 200 hours
17. Tender Openins Date and Time 26 Julv 2021. 1230 hours
18. Name & address of the Office (s) Address
-Selline Tender Document (Principal) Works Branch. Head 0uarters Border Guard Bangladesh, Peelkhana, Dhaka.
-Receiv ing Tender Document Works Branch, Head Quarters Border Guard Bangladesh, Peelkhana, Dhaka.
-Opening Tender Document Works Branch, Head Quarters Border Guard Bangladesh. Peelkhana, Dhaka.
t9. PlaceiDatelTime of Pre -Tender Not Applicable.
Meetins (Optional)
INFORMATION FOR TENDERER

20. Eligibility of Tenderer a. Any individual(s) enlisted firm(s) of BGB & other Govt/Semi Govt/Autonomous
organization of related contractors rvho fulfill the quali{ications criteria stipulated in the
tender data sheet (TDS), PCC and other conditions ofthe tender(s) documents(s).
b. Tlie required number ofsimilar contracts shall be I (one) over the last 5 (five) years.
c. Tenderers to lulfillment of conditions mentioned in the tender data sheet'
(i) Minimum work experience of similar construction ri'ork in single contract
(certificate to be attached as per ITT )
(iD The annual average tum over documents to be attached with tender (as per ITT)
(iii) The minimum amount of free funds (liquid assets) credit facilities (Certificate to b

attached rvith the tender as per ITT )

21. Brief Description of Works Construction of Sainik Banack, Other Ranks Family Quarter, JCO's Mess, JCO's
Family Quarter, Officer's Mess & Constr of BOP.
22. Price of Tender Document (Tk). As per ser 23.

/.) . Tender Package No, Name, Lot No, Identi ication of Lot, Location, Price of Tender, Tender Security and Completion Time as under

Package Package Wk/Lot Identification ofLot Location Price of Tender Completion


No Name No Tender security time in
Document amount (Tk.) weeks/
(Tk) months

1- Sainik WR-1 Vertical extension of Sainik Barrack upto 4th Feni 2,0001- 11,64,850/- 6 Months
Barrack floor over existing l't floor including furniture
at Feni Battalion (4 BGB).
rrd r1L^+^*-^^ nnn/. 1 A< n.OOl- Monfh
Identification of Lot Location Price of Tender Completion
Package Package Wldl,ot
Tender security time in
No Name No
Document amount (Tk) weeks/
flk) months
6 Months
WR-3 Vefiical extension of Sainik Banack upto 4tt' Naikhangchori 2,A001- 12,47,5001-
floor over existing 1't floor including ftlmiture at
Nailthangchori Battalion (1 I BGB).
5,000/- 6 Months
WR-4 Vertical extension of Women Sainik Barrack 2,0001-
Satkania, 9,1

upto 4ft floor over existing 2od floor including Chattogram


furniture at BGTC&C, Satkania, Chattoglq.m'-
7,95,0001- 06 Months
WR-5 Conshuction of I x 200 Men Sainik Banack (5 Mongla, 2,0001-
storied foundation) upto 2nd floor including fumiture Bagerhat
at Disrai Trainins Centre. Monela Bagerhat.
5,08,300/- 6 Months
WR-6 Vertical extension of Sainik Barrack upto'4h Mongla, 2,0001-
floor over existing 2nd floor including furniture Bagerhat
at Disrai Trainine Centre, Mongla, Bagerhat.
6 Months
;t2021-2, Other WR-1 Conskuction of I x Other Ranks Family Quarter Sultanpur 2,0001- 10,76,9801-
Ranks (5 storied foundations with piling) upto 3'd floor
Family @er floor 4 x unit) with Lobby, Stair & Fumiture
Quarter at Sultanpur Battalion (60 BGB).
12,47,5001- 6 Months
wR-2 Construction of 1 x Other Ranks Family Quarter Khulna 2,0001-
(5 storied foundations with piling) upto 2nd floor
@er floor 4 x unit) with Lobby, Stair & Furniture
at Khulna Battalion (21 BGB).
Bandarban 2,0001- 6,87,6501- 6 Months
WR-3 Vertical extension of Other Ranks Family Quafter
upto 5ft floor over existing 2d floor including
fumiture at Sector Headquarters, Bandarban.
WR.4 Consffuction of 1 r Other Ranks Farnily Quarter Rohonpur 2,0001- 12,08,825/- 6 Months
(5 storied foundations with piling) upto 3'd floor
(Per floor 4 x unit) with Lobby, Stair & Fumiture
at Rohonpur Battalion (59 BGB).
wR-5 Construction ol I " Other Ranks Farnily Quarter Habiganj 2,000/- t0,94,2301- 6 Months
(5 storied foundations rvith piling) r.rpto 3'd floor
(Per floor 4 X unit) with Lobby, Stair & Fumiture
at Habigani Battalion (55 BGB).
wR-6 Construction of 1 x Other Ranks Family Quarter Srimongol 2,0001- 10,77,7261- 6 Months
(5 storied foundations with piling) upto 3'd floor
@er floor 4 x unit) with lobby, stair & furniture at
Srimonsol Battalion (46 BGB).
WR-7 Cons0uction of I x Other Ranks Family Quarter Satkania, 2,000/- 12,00,97 5l- 6 Months
(5 storied foundations with piling) upto 3'd floor Chattogram
(Per floor 4 x unr| with lobby, stair & furniture at
BGTC&C, Satkania, Chattogram.
WR.I Construction of 1 x JCO's Mess, Dining Hall, Jaminipara 2,0001- 8,22,375/- 6 Months
t2021-2 JCO'S
Mess Cook House (3'd storied foundation) upto 2nd
floor including cupboard & furniture at
Jaminipara Battalion (23 BGB).
I
wR-2 Construction of x JCO's Mess, Dining Hall, Marissa 2,000/- 8,22,37 5l- 6 Months

Cook House (3'd storied foundation) upto 2nd


floor including cupboard & furniture at Marissa
Battalion (27 BCB).
WR-3 Construction I
of x JCO's Mess, Dining Hall, Bolipara 2,0001- 8,41,250/- 6 Months

Cook House (3'd storied foundation) upto 2nd


floor including cupboard & fuiniture at Bolipara
Battalion (38 BGB).
WR-4 Construction of I x
JCO's Mess, Dining Hall, Satkania, 2,000/- 9,22,37 5l- 6 N4onths

Cook House (4e storied foundation) upto 2nd Chattogram


floor including cupboard & furniture at
BGTC&C, Satkania, Chattogram.
Peelkhana, 2,0001- 12,45,0001- 6 Months
l- JCO's WR-1 Vertical extension of JCO's Family Quarter"upto
Family 7ft floor over existing 5ft floor including Dhaka
Quafier furniture at HQ BGB, Peelkhana, Dhaka'
6 Months
WR-2 Supply & Instalment of 1 x Passenger Lift & I x Peelkhana, 2,0001- 5,62,5001-
Cargo Lift in JCO's Family Quarter at HQ BGB, Dhaka
Peelkhana, Dhaka.
L Pac kage Package Wkilot Identification of Lot Location Price of Tender Completion
Tender security time in
\o Name No
Documeut amount (Tk.) weeks/
flk) months
6 Months
t0t202t- lonsff of WR-1 Consfiuction of Pekpara BOP (A Type) including Sunamganj 2,000/- 8,35,2301-
22 BOP fumitwe under Sunamgani Bathlion (28 BGB).
Lalmonirhat 2,000/- 1,37,6251- 6 Months
WR-2 Consfuction of Gonrlonondol BOP (A Tlpe) including
fi.nniture ruider lalmonirtat Batalion (15 BGB).
Construction of Jharsinghersor BOP (Cyclone Rangpur 2,0001- 10,42,1001- 6 Months
WR.3
Shelter Type) including fumiture -under
Ranspur Battalion (51 BGB).
Nilfamari 7,56,6251- 6 Months
WR-4 Consfluction of Borososi BOP (A Type) including 2,0001-
fumiture under Nilfamari Battalion (56 BGB)'

PROCURING ENTITY DETAILS


1n 60 davs.
Tender ValidiW
25. Name of Official inviting Tender ColASMFaisal
26. Desisnation of 0fficial inviting Tender Deputy Director General (Work$
27. Address olOfficial inviting Tender Headquarters Border Guard Bangladesh, Peelkhana, Dhaka
28. Contact details of Official inviting Tender frt,pno*No :9650001 | Fax :96502-15
29. Special Instruction
a. The procuring entity reservos the right t0 accept or reject all tenders.
b'1f tl" t .d.rr any false/incorrect of forge certif lcate, the tender security shall be forfeited.
"rb-ts
i Application in letter-head pad must be submitted by fender for purchase
d. Original money receipt ofpurchased tender document must b9 gllacheql11llllle tender.
30. nthescheduledateforan1,unavoidablecircumstancethesanrel'i,illbereceived/openedon
the next r,iorking date at the same time and sante venue.

www.bgb.gov.bd

{llfl
Deputy Director General (Works)
For Director General