THIS SERVES AS ACCOMPLISHMENT REPORT OF RYBUILD INTERIOR
RESIDENTIAL BUILDING CONSTRUCTION FROM LAST WEEK WORK DATED ON 26th OF JULY TO 31ST OF JULY
NUMBE WORK DESCRIPTION REMARKS
R 1 OUTDOOR CR WALL FINISHING Ongoing to finish 2 OUTDOOR CR INSTALLATION OF Ongoing to finish PLUMBING FIXTURES 3 OUTDOOR CR ROOFING INSTALLATION Ongoing to finish 4 OUTDOOR DINING ROOF FRAMING Ongoing to finish 6 CHB LAYERING FOR ELECTRICAL Ongoing to finish ROOM 7 ELECTRICAL ROOM COLUMN POURING Ongoing to finish 8 ELECTRICAL ROOM BEAM Ongoing to finish FABRICATION 9 INTERIOR DRYWALL FOR CASHIER Ongoing to finish AREA FRAMING 10 INTERIOR DRYWALL FOR FILING AREA Ongoing to finish 11 INTERIOR CEILING FRAMING Ongoing to finish 12 ALLOCATION OF STEEL EXIT DOOR Ongoing to finish DEMOLISHED WALL 13 AHU ROOM WALL FINISHING Ongoing to finish 14 EXTERIOR FAÇADE FINISHING Ongoing to finish PREPARED BY: