You are on page 1of 3

One-Line Diagram - OLV1=>MCC-1 (Load Flow Analysis)

Bus MCC 1

3.3 A 65.8 A 21.2 A 34.5 A 34.5 A 34.5 A 34.5 A 28.3 A 13.2 A 325.1 A 3.3 A 171.7 A 51.5 A 26.2 A
PF 82.7% PF 90.4% PF 87.5% PF 88.7% PF 88.7% PF 88.7% PF 88.7% PF 88.2% PF 86.3% PF 84.3% PF 82.7% PF 86.5% PF 86.5% PF 85.0% PF

A 125 A 30 A 40 A 40 A 40 A 40 A 40 A 20 A 630 A 20 A 225 A 100 A 40 A 50 A 50 A 50 A 50 A 50 A


8 CB40 CB42 CB44 CB46 CB47 CB49 CB51 CB53 CB1 CB55 CB57 CB59 CB60 CB62 CB64 CB65 CB66 CB67

Cable2
10 m
1-3/C 300

Trafo step up SKG T.Gede


400 kVA

Cable1
Mtr22 Mtr24 Mtr26 Mtr28 Mtr30 Mtr31 Mtr33 Mtr35 Mtr37 1 km Mtr39 Lump4 Lump6 Lump7 Lump8 Lump10 Lump11 Lump12 Lump13
1.5 kW 37 kW 11 kW 18.5 kW 18.5 kW 18.5 kW 18.5 kW 15 kW 6.6 kW 2-3/C 300
1.5 kW 116 kVA 34.7 kVA 17.6 kVA 21.2 kVA 21.2 kVA 21.2 kVA 21.2 kVA 21.2 kVA

Trafo step down area


400 kVA

Cable3
5 m
1-3/C 300

0 A
CB2

Main MCC Kantor-Perumahan 309.3 A 1 V


0.38 kV 85.7% PF 388.

0 A 17.7 A 0 A 10.6 A 279.2 A 0.9 A 1.2 A


CB6 89.5% PF CB3 89.5% PF 85.0% PF 100.0% PF 100.0% PF

0 A
CB8 0 A
sub-bus main MCC 1 1 V CB5
sub-bus main MCC 0.381 kV
8. V 388.
0.38 kV 38
1.5 A 1.9 A 6 A 1.5 A Cable5 0 A CB4
15 A 3.1 A 85.0% PF100.0% PF85.0% PF 85.0% PF 300 m
85.0% PF100.0% PF 1-3/C 185

Bus3 Panel penerangan


0.38 kV 0.6 kVA
P.SPD Masjid 279.2 A 4 V
SDP 1 barack P-Blok D SPD-2
10 kVA 2 kVA 67.
85.0% 3PF
1 kVA 1.2 kVA 4 kVA 1 kVA
Panel Taman
0.8 kVA
SDP 4
180 kVA

page 1 09:54:38 Jun 06, 2017 Project File: Pertagas~


One-Line Diagram - OLV1=>MCC-1 (Load Flow Analysis)

9 V
394.

page 2 09:54:38 Jun 06, 2017 Project File: Pertagas~


One-Line Diagram - OLV1=>MCC-1 (Load Flow Analysis)

page 3 09:54:38 Jun 06, 2017 Project File: Pertagas~