1. Modeling part(HEC-HMS) is required for getting the peak discharge & HEC-RAS is
required for Hydraulic Modeling for getting the water levels.
2. Catchment demarcation is also required on Toposheet for verifying the Catchment Area
in Arc-GIS.
3. At Bridge No.-3 Height of the point at the Bridge Location is Missing as per Report, So
that we can calculate the time of concentration properly.
4. Peak Discharge is not matching as per the Report. Its getting 73.70 cumecs in place of
87.697 cumecs.
5. Bed Levels along the river is not given in the report so that we can get cross section as
well as wetted perimeter,area. Hence, Detailed design calculation (Excel Part) is missing
in the report for Hydraulic Calculation for getting HFL.
6. Calculation of Bridge No.-23 is missing in the report.
7. At Bridge No. 24, Height of the point at the Bridge Location is Missing as per Report.
So, that we can calculate the time of concentration properly.
8. Peak Discharge is not matching as per the report. Its getting 7.34 cumecs in place of
9.781 cumecs.
9. Here is also Bed Levels along the river is not given in the report so that we can get cross
section as well as wetted perimeter,area. Hence, Detailed design calculation (Excel Part)
is missing in the report for Hydraulic Calculation for getting HFL.