Reference Document(s): Please see attached file for reference
COST Implication: TIME Implication:
Reason(s) for Instruction: Has cost Has time implication Confirmation of verbal instruction implication Has NO time Change in design Has NO cost implication Revised work methodology implication To be assessed (may Use of alternative material To be assessed or may not have) Adjustment in scope of work (may or may not have) Unsafe working condition Non-compliance with the Drawings and Specification Reference Pay Reference Activity Item(s): Item(s): Others (specify): see details of instruction