Culture Documents
2
Energy Consumption
Impacting Production Cost
• Electrical and Thermal energy
accounts for 40 to 50% cost of
cement manufacturing.
• Global Warming
• Environment issues
• Energy Conservation issues
GAS
Point-1 Point-2
6
ARREST MASTER
1001
Product Highlights Two Component System
• Part A & Part B (1:1 Mix Ratio).
• Temp. Resistance: 180⁰C
• For Upper Cyclones, VRM’s &
Power plants.
• Density: 2.5 g/cm3
• Compressive Strength: 500-
525 Kg/cm2
• Non shrinkable properties &
no tools required for
application.
• Pot Life: 30 Min.
• Setting Time: 5 min at 80⁰C
Flapbox
9
ARREST MASTER 1001
Flange Flange
Downpipe Flanges
10
ARREST MASTER 1001
• Side View • Front View
Dispersion Plate
11
ARREST MASTER 1001
Before After
VRM Section
13
ARREST MASTER 1001
Before After
Part A Part B
26
Advantages of Arrest master Series over
Conventional Methods and Products
Property Conventional Arrest Master
Method/Products
Life of application Short As long as desired
Method and time required Experienced meson easy and less time taking,
for application required and takes long any body can do
time application
Effectiveness Less and decreases with High, Remains effective till
time whole life
Resistance to thermal Less, cracks and damage High, can withstand against
shock occurs due to thermal thermal shock and
shock shrinkage and expansion
Venerability to plant start- High, required to replace Less, remains intact even
stop after few start stops after many start stops
Requirement of repair and frequent Nil
recheck
Ability to withstand Not able Can withstand up to 7mm/s
vibrations vibrations (AR-2001)
27
Working temperature less High up to 800 Deg C
Savings through
False air reduction
Case Studies:
1) Single String Preheater
2) Double String Preheater
3) Cement Mill VRM
28
Single String Pre Heater
1% FALSE AIR REDUCED AT PREHEATER OUTLET
Date 19th Nov,2016
Type Of plant Five stage ILC
Kiln length 65 Metrs
Kiln Dia 4.2 Metrs
Heat Consumption 750 K Cal/Kg-Clinker
Type of Cooler Grate cooler
S No Particulars Unit Values
1 Parameters
1.1 Kiln Feed TPH 315
1.2 Clinker Factor 1.62
1.3 Barometric Pressure at site mmWg 10036
1.4 Ambient Trmp Deg C 25
1.5 Power Cost Rs/Unit 3.2
1.6 Coal CV K Cal/Kg Coal 7800
1.7 Coal Cost Rs/Kg 8
1.8 PH Out let pressure mmWg 800
Pressure at PH fan Inlet mmWg 850
1.9 PH Out let temp. Deg C 300
1.1o Flow at PH Out Let m3/Hrs 731000
1.11 Flow at PH Out Let Nm3/Hrs 311333
2 False air 1%
2.1 False air Volume m3/Hrs 7310
2.2 False air Volume Nm3/Hrs 3113
3 LOSS in Power
3.1 Loss on account of PH Fan KwH 20.96
3.2 Loss in money Rs/Hr 67.06
3.3 Annual Loss due Power In Lacs 5.31
4 Loss in Heat
4.1 Loss on account of heat Kcal/hr 312500
4.2 Loss in money Rs./hr 321
Annual Loss due to Heat In Lacs 17.77
5 Total Loss (Rs) Lacs per annum 30.70
6 Arrest Master 1001 Cost Lacs 1.64
6.1 Pay-Back period In one month
Note: Considring 330 days run plant in a year
29
Conclusion : Arrest Master 1001 : Cost-effective Industrial Solution
Double String Pre Heater
S No Particulars Plant Details
1.2 Kiln length 55.8 Mtrs
1.3 Kiln Dia 3.8
1.4 Heat Consumption 815 K Cal/ Kg - Clinker
1.5 Type of Cooler Grate Cooler with IKN KIDS
1.6 Calciner Type ICL
1.7 PH Make/Stages KHD/5
S No Parameters Unit Plant Details
2.1 Kiln Feed TPH 210
2.2 Clinker Factor 1.64
2.3 Clinker production TPH 3073
2.4 Barometric Pressure at site mmWg 10017
2.5 Barometric Pressure at sea level mmWg 10336
2.6 Ambient Temperature Deg C 35
2.7 Power Cost Rs/Unit 3.2
2.8 Coal CV K Cal/Kg Coal 7800
2.9 Coal Cost Rs/Kg 8
3 Reduction in False air after using " ARREST MASTER 1001"
3.1 False air across PH (Before/After) % 9.7 7.6 2.11
Parameters Unit Kiln string Pyro string UNIT-I
4 Preheater outlet
4.1 Temperature deg c 391 395
4.2 Draft mmWG -625 -815
4.3 Flow M3/h 228000 325000
4.5 Flow Nm3/h 85179 118249 203429
5 False air = 2%
5.1 False air volume Nm3/h 1797 2495 4292
5.2 False air = 2% M3/h 4938 7043
6 LOSS
6.1 Loss on account of Power in SG fan kwh 11 20 31
6.2 Loss in money Rs./hr 35 65 101
31
32
Some Testimonials
from NCBM Seminar
• T. Prasad (VP Project Engineering) – Thyssenkrupp
(Excellent Product. Need to be applied at Preheater, Duct
Flanges to Conserve heat.
• Rajesh Kothari (Cluster Head) – Ambuja Cements Ltd .
(Interesting Product)
• K Ganesh (President) – RV Consulting (Sagar Cement
Group)-(Good product & has future)
• Rakesh Nayak (Section In charge) – Dalmia Cement ( Very
good product for False Air Arresting)
• Devendra Sinha – JSW Cement (A good option for mind
relief for false air ingress points)
• Rabindra Singh- NCBM (Good product with future)
33
Our Esteemed Customers
OCL India Ltd. Line- 1 & 2, Rajgangpur, Odisha
Dalmia Cement East Limited, Bokaro, Jharkhand
Kapilas Cement Manufacturing Works, Cuttak, Odisha
Dalmia Cement Bharat Limited, Belgaum, Karnataka
OCL India Limited, Medinipur, West Bengal
34
Our Esteemed Customers
J. K. White Cement Works, Gotan,
Rajasthan
35
Our Esteemed Customers
Andhra Cements Limited-
(Unit: Durga Cement Works)
36
Successful trials conducted at
Ultratech Cement Ltd:
Sewagram Cement
Baga Cement
Vikram Cement
Ambuja Cements Ltd:
Rabriyawas
Bhatapara
Darlaghat
Other Groups:
My Home
Ramco Cements
Asian Cement 37
Our Vision
“Advancement through innovation”
We are committed to the relentlessness
pursuit of innovation in compact, energy
saving, high precision technologies.
Our Values
Our values serve as a compass for our action and describe how we
behave in the world.
Leadership: The courage to shape a better future.
Collaboration: Leverage collective genius
Integrity: Be real
Passion: Committed in heart and mind
Diversity: As inclusive as our brand
Quality: What we do, we do well
Directors Message
“By using the latest technology and quality systems, we are committed to delivering a
38
uniformly high-quality product which meets all our customer requirements.”
• Institute for Industrial Productivity
• Bureau of Energy Efficiency
• Knowledge Exchange Platform
• British High Commission, New Delhi
39
Children's Park, Ajmer, Rajasthan -305001