You are on page 1of 1
PLINTH AREA RATES FOR DIFFERENT TYPE OF BUILDINGS IN PUNJAB BUILDINGS DEPARTMENT (South ZONE), LAHORE. ‘2nd BI-ANNUAL 2021 (PERIOD Ist Jul¥ 2021 to 31st December 2021) TYPE OF BUILDING UNIT 3 5 D.C KHAN 7830, 1930 2089) 2089, 2099, 2099, 2217 2134 1840, 4737) 473747371 MULTAN. ‘BAHAWALPUI (eat, t94t, 1949) Toei 1949, 1949, 2095, 2095/2095, 20982100 2100 2109) 2109/2109) 2109) 2114 atte 2154) 2164) 216421842182) 2182 2142|_2142_2142, 214224472147) ‘SCHOOLS ‘COLLEGES! HOSTELS (ve Wardrobes) HOSPITALS C. BUILDINGS oe C PURPOSE HALL AUDITORIUM WITH PRE-STRESSED ROOF ON HALL (CEILING HEIGHT=23" A) (GARRAGE / CYCLE STAND 1880| 1880/1880, 1880) 1858, 1858, frat) tar|_srar| rar) eas SIDENTIAL BUILDINGS : . I 2500] 2602] 2557] 2554) 2425) 2425) 24254 2427 2529, 25292529) — 25344 2529, 2a21) 2424) 24241 242712424 zee 2285) 2zaeh 200) cae pare 2are_zarel —_ 2329/2329) 2329[ 23294 2333| 2322) sez ~ 2322) 2322) | 2470|_2470. 2470, 24701 2477| 2477), ~ 2460) 2460) 2460) 2460" 2460/ ‘COMPOUND WALL 45° THICK, & 55D FT. HIGH ABOVE PLINTH LEVEL net soaa6t4|_t0r1 tert 16101610) 4618 1618, 1618 7 BOUNDARY WALL $° THICK, & 6.00 FT. HIGH ABOVE PLINTH LEVEL mj — aaa, —23en 2, 2340) —aaas| zal SECURITY WALLS" THICK, & 00 FT. HIGH ABOVE PLINTH LEVEL. Tope} ett) s1tt) siti) e111; 5164) 5164 ERHULE! EXCEPT CYCLE STAND & GARRAGES pst f— t40[ 40, 140 a40h 440,110 ERVALE| FOR CYCLE STAND 4 GANRAGES. Fat_j at ata aa : at} —ze| — zal — val ——1at — ral — ro 2363) 5075 23632363, 2363 ‘5075. 6075 5075 110140110, a 4 43 737878 — rant — a0 a5] [a a] a ‘ADDITIONS/ REDUCTIONS : ie i 39) 39) "ADD FOR STRIP | ISOLATED COLUMN FOOTING Pst { 375|_ 375|__ 376] ‘375; 383) 383] 367-367, 367) {ODFOR EACH 1" ADDITIONAL HEIGHT ABOVE TR I |—~sa—_ sof o_o] oe — ol 5555 S| OO FOR EaciT TF ROGEPER FaATO— se eee ee ee eee) ap as) as a a a Bi I a IBBED RAFT FOUNDATION. psn | fans) 13881306) tase} 4414 tata 4350) 1350" 1350 FLAT RAFT FOUNDATION. — [Pst {1558 155815581658) 1591 1520 1820 1520 ‘ADD FOR STEM OF RCC RETAINING WALL Psa { 330|_ 990] 330 33 336 320 320 320 “6 AOD FOR FOUNDATION FOR FIRST FLOOR AND SUBSEQUENT FLOORS est. } 400400 100,10 84 101, 401101 "TAD FOR FRAME STRUCTURE FOR EACH FLOOR eee ae Pst. 451) 451. 451.454 457, az 442 az § REDUCE COST OF FOUNDATION (Subsequent fo Ground Floor) Pst. 353, 3633833834 203, 209 354384354 “ADD FOR FIRST FLOOR AND SUBSEQUENT FLOORS Pst. 400' 100 100 ‘100! 8484 401401) 101 i. These rates are based on standard drawings / specifications, normal bearing capacity (0.75 Tsf), normal plinth level 4-ft above ground Level and 3ft deep foundation from NSL. These also include Marble on Counters and Stairs. i. The raft foundation has been taken for five storeys. The rate for same will be incteased or decreased depending on number of storeys. Nhe i ii. The boundary wall of 8-0" height is with RCC column 12°x9" & Plinth beam 12"x9" with PCC coping as per design provided by the Director (P&D). cure TSMAN DESIGN OFFICER, iv. The Plinth Area rates are inclusive of Carriage of crushed stone aggregatelBajti for Chief Engineer eae Zone) cee ounce) from approved query to site of work. Punjab Buildings Department Lahore. ‘unjab Buildings Department Lahore.

You might also like