You are on page 1of 1

SALURAN SEKUNDER ASAM CANGKOK

1.00 3.00

m m
h 1 1

TIPIKAL CANAL OF SECTION BKG.6-PB3

6
G.
BK A
AP C.1
AD BA
+0 IS NG
P.0 BAG OR
A
6/ AN 0
K G. N +2 AN C
B U P5 AT C.1
NG MB BA
BA JE .1D
.1B AN
G
AC C.1
G
AC .2 R B A
B 49 NO +2
8
AIN .70 IN B
13 AIN 1+ TA 3A DR 81 A
0+ DR P1 BA P1 SS C.1
E
.1F .4+ DR
P1 S M O BA
C PB SS
OS JE CR BA O
CR RT G CR
4
1+ ULVE .8 AN
PB 49 OR
12.0 XC 1+ AN
BO PB BAT
E M
J

L 10.0

IP
TL a

TM TA

R R

5.0

0 1 2 3 4 5 6 7 8 9 10 m
V=

0 20 40 60 80 100 120 140 160 180 200 m


H=

bidang persamaan / reference level


+ 0.00 meter
PATOK HEKTOMETER
Hm 0 Hm 1 Hm 2 Hm 3 Hm 4 Hm 5 Hm 6 Hm 7 Hm 8 Hm 9 Hm 10 Hm 11 Hm 12
HECTOMETER STONE

PB.2A
NOMOR PROFIL
PROFILE NUMBER
P.0 P.1 P.2 P.3 P.4 P.5 P.6 P.6A P.7 P.8 P.9 P.10 P.11 P.12 P.13A P.13 PB.1A PB.1 PB.2 PB.3 PB.4 PB.5A PB.5

1040.90

1089.30

1140.00

1190.00
100.10

203.60

252.10

302.10

353.80

403.80

453.80

506.80

553.50

601.50

648.10

698.30

749.60

780.80

827.10

877.10

941.10
0.000

48.30

14.00
JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE
48.30 51.80 103.50 48.50 50.00 51.70 50.00 50.00 53.00 46.70 48.00 46.60 50.20 51.30 31.20 46.30 50.00 50.00 99.80 48.40 50.70 50.00
ACCUMULATED DISTANCE

ELEVASI TANGGUL KIRI


81.70
LEFT BANK LEVEL
YANG ADA
EXISTING

ELEVASI TANGGUL KANAN


RIGHT BANK LEVEL

ELEVASI DASAR SALURAN PADA AS


BED LEVEL IN CENTER LINE
ELEVASI TANAH ASLI
8.757

8.478

8.852

8.682

8.968

8.516

8.625

8.933

8.562

8.706

8.757

8.763

8.328
7.608
8.469

9.053

8.621

8.399
6.744

8.629

8.824

8.979
9.072

8.804

7.856

7.651

7.587

7.592
ORIGINAL GROUND LEVEL
9.220

9.204

9.187

9.152

9.136

9.119

9.113

9.102

9.086

9.069

9.051

9.036

9.020

9.008

9.004

8.988
8.987

8.970
8.967

8.960

8.945
8.943
8.893

8.878
8.873

8.861

8.857

8.823

8.807

8.790

8.780

8.774
ELEVASI TANGGUL
BANK LEVEL
8.720

8.704

8.687

8.652

8.636

8.619

8.613

8.602

8.586

8.569

8.551

8.536

8.520

8.508

8.504

8.488
8.487

8.470
8.467

8.460

8.445
8.443
8.393

8.378
8.373

8.361

8.357

8.323

8.307

8.290

8.280

8.274
ELEVASI MUKA AIR RENCANA
DESIGN WATER LEVEL
7.810

7.794

7.777

7.742

7.726

7.709

7.703

7.692

7.676

7.659

7.641

7.626

7.610

7.598

7.594

7.578
7.577

7.560
7.557

7.550

7.535
7.533
7.483

7.468
7.463

7.451

7.447

7.413

7.397

7.380

7.370

7.364
ELEVASI DASAR SALURAN
RENCANA / DESIGN

BED LEVEL

TRASE SALURAN R X Y L
ALIGNMENT TL a

ELEVASI DASAR SALURAN PEMBUANG SISI KIRI


BED LEVEL SIDE DRAIN LEFT SIDE

ELEVASI DASAR SALURAN PEMBUANG SISI KANAN


BED LEVEL SIDE DRAIN RIGHT SIDE

TIPE BANGUNAN
TYPE OF STRUCTURE

DIMENSI SALURAN DAN DATA TAMBAHAN Q v k


b h w RUAS 1 A= 518 Ha Q= 0.835 m3/dt V= 0.4132 m/dt b= 1.30 m h= 0.91 m w= 0.50 m k = 35 m=1 i = 0.0000333
CANAL DIMENSION AND ADDITIONAL DATA m I A

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PEKERJAAN :


DIREKTORAT JENDERAL SUMBER DAYA AIR LANJUTAN PEMBANGUNAN JARINGAN IRIGASI D.I AMANDIT
BALAI WILAYAH SUNGAI KALIMANTAN III KABUPATEN HULU SUNGAI SELATAN
SATKER PELAKSANAAN JARINGAN PEMANFAATAN AIR WS.BARITO PROV.KAL-SEL LOKASI :
JL. YOS SUDARSO NO.10 Telp. (0511) 3353708 BANJARMASIN 70119 KABUPATEN HULU SUNGAI SELATAN
SALURAN SEKUNDER ASAM CANGKOK PROVINSI KALIMANTAN SELATAN
POTONGAN MELINTANG KONTRAKTOR :
CROSS SECTION

No. Tanggal Yang Direvisi Asli Diperbaiki Disetujui PPK DIREKSI TEKNIS Konsultan Supervisi Kontraktor Pelaksana KONSULTAN :
IRIGASI DAN RAWA II IRIGASI DAN RAWA II CV. ANDALUSIA PT.BARINDO PRIMA AGUNG

No Kontrak :
HK 0203/SNVT.PJPA-WS.BRT/IRWA-II/010
GUSTI ABDUL AZIS, ST M. ARIFIN ZAINUL AQLI, ST INDRA MAHDI, ST No Lembar Jumlah Lembar Keterangan
NIP.19720804200212 1 004 NIP.19661028 200701 1 001 Supervision Engineer Site Manager