You are on page 1of 10

EMC Application Checklist

Product
Account Name &
City, State: Description
Contact Name:
:
Date Form Form Proposal
Completed: Completed by: Number:

This document contains confidential information and cannot be disclosed in whole or in part without the express written permission of ETS-Lindgren.
1301 Arrow Point Drive, Cedar Park, Texas 78613 (512) 531-6400  www.ets-lindgren.com
535915769.doc Page 1 of 10
EMC Application Checklist

Section 1 – Project Technical Information - The following section will help determine the exact project requirements
and identify the best possible solution. This will be especially useful if a formal project specification has not been prepared for our
review.
Describe what the customer wants to do:

Section 2 – Product (EUT, DUT, etc.) to be Tested – This information helps define the size of the chamber.

DUT Description:

Weight (lb, kg) Length (ft, in, cm) Width (ft, in, cm) Height (ft, in, cm)

DUT Information:

DUT Access Requirements:


How will EUT be moved in and out
of chamber? Threshold, ramps?
Please describe:

Chamber Door Type & Size:

Ethernet /
Fiber Optic Cooling USB
DUT Interface Requirements: Data
Please Specify Quantity/Type
Firewire GPIB RF Signal Other

DUT Power Requirements:


Specify AC/DC; single phase
(110/230 V), three phase; 50/60
Hz, #Amps, Outlets (turntable)
Please Specify Quantity/Type

Heat Load (BTU):

Cooling Requirements:

This document contains confidential information and cannot be disclosed in whole or in part without the express written permission of ETS-Lindgren.
1301 Arrow Point Drive, Cedar Park, Texas 78613 (512) 531-6400  www.ets-lindgren.com
535915769.doc Page 2 of 10
EMC Application Checklist

Section 3 – Chamber Compliance Requirements – This information helps define the size of the chamber.
Pre-Compliant Testing Compliant Testing

Section 4 – Chamber Type – This information helps define the size of the chamber.
3m Pre-Compliant 3m Compliant 5m Compliant 10m Compliant
GTEM w/System MIL-STD-461 / DO-160 Automotive CISPR (State 25/22/16)
RSE Reverberation Other-Describe:

Section 5 – Notes & Additional Information

Continue below to Chamber Validation and Turnkey System Requirements (ETS-Lindgren to provide integration and instrumentation)

This document contains confidential information and cannot be disclosed in whole or in part without the express written permission of ETS-Lindgren.
1301 Arrow Point Drive, Cedar Park, Texas 78613 (512) 531-6400  www.ets-lindgren.com
535915769.doc Page 3 of 10
EMC Application Checklist

Section 6 – Chamber Validation Standards


Commercial / CISPR
Validation other than Diameter / Height / Unit ft
 Standard Start Stop
Spec Length Width /m
ANSI C63.4 [Up To 1 GHz SAC] MHz GHz Performance X
ANSI C63.4 [Up To 1 GHz FAR] MHz GHz Performance X
CISPR 16 [Up To 1 GHz SAC] MHz GHz Performance X
CISPR 16 [Up To 1 GHz FAR] MHz GHz Performance X
CISPR 16 [Above 1 GHz sVSWR] GHz GHz Performance X
IEC 61000-4-3 MHz GHz Performance X
Other / MHz GHz Performance X

If customer is requesting a TURNKEY TEST SYSTEM, Sections 6A, B and C are required.

Section 6A – Test System Type – Turnkey Systems SW/HW/Integration


Commercial / CISPR
EMI Pre-Compliance EMI Compliance EMS Compliance EUT Monitoring
Telecom Upgrade / Software
Other:

Section 6B– Test System Standards – Turnkey Systems SW/HW/Integration


Commercial / CISPR
EN 55022 EN 55011 EN 55014 EN 55015 EN 55020
EN 61000-3-2/3 EN 61000-4-3 EN 61000-4-4/5/8 EN 61000-4-6 EN 61000-4-2
EN 301 489-7 EN 55032 FCC Part 15 Medical
Other

Section 6C – Test System Performance – Turnkey Systems SW/HW/Integration


Commercial / CISPR
Single Range or Dual Range
EMI Frequency Range MHz GHz Single Dual
System
EMS Field Strength
EMS Frequency Range MHz GHz @ m
x V/m @ y m
Modulation Type AM 80% Yes No Other Modulation Type
Conducted EMS Frequency
kHz MHz Injected Current/Voltage Level
Range
Other

This document contains confidential information and cannot be disclosed in whole or in part without the express written permission of ETS-Lindgren.
1301 Arrow Point Drive, Cedar Park, Texas 78613 (512) 531-6400  www.ets-lindgren.com
535915769.doc Page 4 of 10
EMC Application Checklist

Section 7 – Chamber Validation Standards


Automotive / Automotive Components
Validation other than Diameter / Height / Unit ft
 Standard Start Stop
Spec Length Width /m
CISPR 12 MHz GHz Performance X
SAE J551 / ISO 11451-2 MHz GHz Performance X
2009/19/EC MHz GHz Performance X
JASO D002 MHz GHz Performance X
Verify to ANSI C63.4 MHz GHz Performance X
Verify to CISPR 16 MHz GHz Performance X
Verify to IEC 61000-4-3 MHz GHz Performance X

Other MHz GHz Performance X

If customer is requesting a TURNKEY TEST SYSTEM, Sections 7A, B and C are required.

Section 7A – Test System Type – Turnkey Systems SW/HW/Integration


Automotive / Automotive Components
EMI Pre-Compliance EMI Compliance EMS Compliance EUT Monitoring
Other

Section 7B – Test System Standards – Turnkey Systems SW/HW/Integration


Automotive / Automotive Components
CISPR 12 CISPR 25 ISO 11452-X ISO 11451-X ISO 7637-2/3
GM/FORD/etc. 2009/19/EC
Other

Section 7C – Test System Performance – Turnkey Systems SW/HW/Integration


Automotive / Automotive Components
Single Range or Dual Range
EMI Frequency Range MHz GHz Single Dual
System
EMS Field Strength
EMS Frequency Range MHz GHz @ m
x V/m @ y m
Modulation Type AM 80% Yes No Other Modulation Type
Conducted EMS Frequency
kHz MHz Injected Current/Voltage Level
Range
Dynamometer Required? Yes No 2 Wheel Drive 4 Wheel Drive
E& H Field
E Field Generator? Yes No Yes No
Generator?
Other

This document contains confidential information and cannot be disclosed in whole or in part without the express written permission of ETS-Lindgren.
1301 Arrow Point Drive, Cedar Park, Texas 78613 (512) 531-6400  www.ets-lindgren.com
535915769.doc Page 5 of 10
EMC Application Checklist

Section 8 – Chamber Validation Standards


MIL-STD-461 / DO-160
Chamber Validation is not required per the standard.

Validation other than Diameter / Height / Unit ft


 Standard Start Stop
Spec Length Width /m
Other / MHz GHz Performance X

If customer is requesting a TURNKEY TEST SYSTEM, Sections 8A, B, C and D are required.

Section 8A – Test System Type – Turnkey Systems SW/HW/Integration


MIL-STD-461 / DO-160
EMI Pre-Compliance EMI Compliance EMS Compliance EUT Monitoring
Upgrade / Software
Other

Section 8B – Test System Standards – Turnkey Systems SW/HW/Integration


MIL-STD-461 / DO-160
MIL-STD 461 MIL-STD-464 DO-160
Other / Version:

Section 8C – Test System Performance – Turnkey Systems SW/HW/Integration


MIL-STD-461 / DO-160
EMI Frequency Range MHz GHz

EMS Field Strength


EMS Frequency Range MHz GHz @ m
x V/m @ y m
Modulation Type AM 80% Yes No Other Modulation Type
Conducted EMS Frequency
kHz MHz Injected Current/Voltage Level
Range
Other

Section 8D - CATEGORIES (MIL-STD-461 F)


Req’d Notes
Test Type
(Y/N) (Provide Field Strength in V/m)
CE101
Conducted Emissions, 30Hz - 10kHz
CE102
Conducted Emissions, 10kHz-10MHz
CE106
Conducted Emissions Antenna Terminal,10kHz-40GHz
CS101
Conducted Susceptibility, 30 Hz to 150 kHz

This document contains confidential information and cannot be disclosed in whole or in part without the express written permission of ETS-Lindgren.
1301 Arrow Point Drive, Cedar Park, Texas 78613 (512) 531-6400  www.ets-lindgren.com
535915769.doc Page 6 of 10
EMC Application Checklist

Section 8D - CATEGORIES (MIL-STD-461 F)


Req’d Notes
Test Type
(Y/N) (Provide Field Strength in V/m)
CS106
Conducted susceptibility, transients,
CS109
Conducted susceptibility
CS114
Conducted Susceptibility, Bulk Cable Injection, 10 kHz to 200 MHz
CS115
Conducted Susceptibility, Bulk Cable Injection,
CS116
Conducted Susceptibility, Damped Sinusoidal Transients, Cables &
Power Leads, 10 kHz to 100 MHz
RE101
Radiated Emissions, Magnetic Field, 30 Hz to 100 kHz
RE102
Radiated Emissions, Electric Field, 10 kHz to 18 GHz

RE103
Radiated Emissions, Antenna Spurious and Harmonic Outputs, 10 kHz
to 40 GHz
RS101
Radiated Susceptibility, Magnetic Field, 30 Hz to 100 kHz
RS103
Radiated Susceptibility, Electric Field, 2 MHz to 40 GHz
[[ Important – Must provide the field strength in V/m for RS
103 testing]]

This document contains confidential information and cannot be disclosed in whole or in part without the express written permission of ETS-Lindgren.
1301 Arrow Point Drive, Cedar Park, Texas 78613 (512) 531-6400  www.ets-lindgren.com
535915769.doc Page 7 of 10
EMC Application Checklist

Section 9 – Chamber Validation Standards


RSE
Validation other than Diameter / Height / Unit ft
 Standard Start Stop
Spec Length Width /m
ANSI C63.4 [Up To 1 GHz SAC] MHz GHz Performance X
ANSI C63.4 [Up To 1 GHz FAR] MHz GHz Performance X
CISPR 16 [Up To 1 GHz SAC] MHz GHz Performance X
CISPR 16 [Up To 1 GHz FAR] MHz GHz Performance X
CISPR 16 [Above 1 GHz sVSWR] GHz GHz Performance X
IEC 61000-4-3 MHz GHz Performance X
Other / MHz GHz Performance X

If customer is requesting a TURNKEY TEST SYSTEM, Sections 9A, B and C are required.

Section 9A – Test System Type – Turnkey Systems SW/HW/Integration


RSE
EMI Pre-Compliance EMI Compliance EUT Monitoring Telecom
Upgrade / Software Other

Section 9B – Test System Standards – Turnkey Systems SW/HW/Integration


RSE
EN 55022 EN 55011 EN 61000-4-4/5/8 EN 61000-4-6 EN 61000-4-2
FCC Part 15 FCC Part 22 FCC Part 24 3GPP EN 61000-4-3
EN 301 489-7 EN 300 328 EN 300 440
Other

Section 9C – Test System Performance – Turnkey Systems SW/HW/Integration


RSE
MH
EMI Frequency Range GHz
z
 Technology List Required Bands Below For Each Technology
GSM
CDMA
WCDMA
TD-SCDMA
LTE
Wi-Fi
WiMAX
Bluetooth
Other

This document contains confidential information and cannot be disclosed in whole or in part without the express written permission of ETS-Lindgren.
1301 Arrow Point Drive, Cedar Park, Texas 78613 (512) 531-6400  www.ets-lindgren.com
535915769.doc Page 8 of 10
EMC Application Checklist

Section 10 – Chamber Validation Standards


Reverberation
Validation other than Diameter / Height / Unit ft
 Standard Start Stop
Spec Length Width /m
IEC 61000-4-21 MHz GHz Performance X
MIL-STD 461 MHz GHz Performance X
DO-160 MHz GHz Performance X
IEC 61726 MHz GHz Performance X
IEC 61967-7 MHz GHz Performance X
GMW 3100 MHz GHz Performance X
Ford – EMCCS 2009 MHz GHz Performance X
ANSI 364-66A MHz GHz Performance X
Other / MHz GHz Performance X

If customer is requesting a TURNKEY TEST SYSTEM, Sections 10A, B and C are required.

Section 10A – Test System Type – Turnkey Systems SW/HW/Integration


Reverberation
EMI Pre-Compliance EMI Compliance EMS Compliance EUT Monitoring
Automotive Military Shielding Effect Upgrade / Software
Other:

Section 10B – Test System Standards – Turnkey Systems SW/HW/Integration


Reverberation
MIL-STD 461 MIL-STD-464 DO-160 IEC 61000-4-21 GM / Ford / Etc.
Other / Version

Section 10C – Test System Performance – Turnkey Systems SW/HW/Integration


Reverberation
EMI Frequency Range MHz GHz

EMS Frequency Range MHz GHz EMS Field Strength x V/m V/m

Modulation Type AM 80% Yes No Other Modulation Type

Other

This document contains confidential information and cannot be disclosed in whole or in part without the express written permission of ETS-Lindgren.
1301 Arrow Point Drive, Cedar Park, Texas 78613 (512) 531-6400  www.ets-lindgren.com
535915769.doc Page 9 of 10
EMC Application Checklist

Section 11 – Chamber Validation Standards


GTEM System
(Note: GTEM only are OTC)

Validation other than Diameter / Height / Unit ft


 Standard Start Stop
Spec Length Width /m
IEC 61000-4-20 MHz GHz Performance X
IEC 61000- 6-3 MHz GHz Performance X
IEC 61000- 6-4 MHz GHz Performance X
SAE J1752-3 MHz GHz Performance X
IEC 62132-2 MHz GHz Performance X
IEC 61967-2 MHz GHz Performance X
Other / MHz GHz Performance X

GTEM TURNKEY TEST SYSTEM, Sections 11A, B and C are required.

Section 11A – Test System Type – Turnkey Systems SW/HW/Integration


GTEM System
EMI Pre-Compliance EMI Compliance EMS Compliance EUT Monitoring
Automotive Military Telecom Upgrade / Software
Other

Section 11B – Test System Standards – Turnkey Systems SW/HW/Integration


GTEM System
IEC 61000-4-20 IEC 61000- 6-3 IEC 61000- 6-4 SAE J1752-3 IEC 62132-2
IEC 61967-2 IEC 6118-13 CISPR 25 FCC Part 15
Other

Section 11C – Test System Performance – Turnkey Systems SW/HW/Integration


GTEM System
EMI Frequency Range MHz GHz

EMS Frequency Range MHz GHz EMS Field Strength x V/m V/m

Modulation Type AM 80% Yes No Other Modulation Type

Other

This document contains confidential information and cannot be disclosed in whole or in part without the express written permission of ETS-Lindgren.
1301 Arrow Point Drive, Cedar Park, Texas 78613 (512) 531-6400  www.ets-lindgren.com
535915769.doc Page 10 of 10

You might also like