Task: Cut out the boxes. Arrange them in order.

Check your order is right. Stick into your books.

Mining land
Metals are Building the Estimation
is restored
extracted mine and of the size
so it can be
from their processing and quality
used in the
ores plants of the ore
future
Evaluation
Mine is in Operation
of the risks
Discovery of use until all of the mine
and costs of
the ore of the ore is to recover
extracting
extracted the ore
the ore

Task: Cut out the boxes. Arrange them in order.


Check your order is right. Stick into your books.

Mining land
Metals are Building the Estimation
is restored
extracted mine and of the size
so it can be
from their processing and quality
used in the
ores plants of the ore
future
Evaluation
Mine is in Operation
of the risks
Discovery of use until all of the mine
and costs of
the ore of the ore is to recover
extracting
extracted the ore
the ore