Project Title: “Providing Under Ground Drainage facilities (Laterals) to R R Nagar &
Page 04 of 21
Dasarahalli Zone coming under 110 villages of BBMP”
B INPROCESS
1 Pipes edges are prepared as per requirement? Jointing area cleaned properly and checked Proper Marking to be provided before
2 3
Found ok. jointing of pipes
2 Fit -up activity to be take up as per specification. Socket
type joint minimum insertion needs to be ensured. Yes 1 3 Jack to be used for jointing pipes
6 Levels & location of pipes as per drawing & project Maintained as per the design specifiaction Maintained levels in pipe laying register
contract specification requirement or not? requirement as per the contract 3 3
ad per Drwg.
TOTAL 15 18
C FINAL INSPECION
1 Back filling activity to be initiated immediately except
thrustblock and pipe encasing areas? Back filling done immediately 3 3 Back filling done after completion of work
GRAND TOTAL 57 63
Guidelines:
Award 3 for Excellent, 2 for Very Good, 1 for Good, 0 for Poor. Findings shall be written on Good and Poor rating and CA shall be initiated for those attributes.
Product Quality check sheet for Mechanical - Unloading & Stringing LTCD/WET/PQM/ITP/F08 Rev-0
TOTAL 2 2
B INPROCESS
1 While unloading the pipes proper pipe lifting equipment Yes used proper lifting equipment.
are used or not?
1 1
2 Pipes are stacked on soft soil bags or wooden plank for Available
avoiding damages of outside coating? Pipe ends at lower
row covered with sheet to avoid foreign material
entrapment inside of pipe.
0.5 1
TOTAL 1.5 2
C FINAL INSPECION
1 Pipe are transported by the proper trailor or not? Yes
1 1
2 Minimum two support along the pipe length provided or Yes ,Provided
not? 1 1
TOTAL 4 4
Date :22.04.2017
REMARKS
MARKS MAX
SL NO DESCRIPTION FINDINGS Remarks
OBTAINED MARKS
A ROAD WORKS
1 Materials approved
2 Sub grade- preparation as per drawing/specification
3 GSB as per specification
4 Wet Mix Macadam as per specification
5 Thickness & Gradient as per specification
6 Rolling as required
7 Filed Density Results as per specification
8 Prime Coat / Tack Coat NA
9 Quality of Asphalt mix
10 Laying as per specification
11 Thickness as per specification
12 Rolling as per specification
13 Filed Density Results as per specification
14 Joint preparation
15 Workmanship
TOTAL
Yes
3 Proper backfilling with approved materials 1 1
13 Joint preparation Ok 1 1
14 Workmanship Ok 1 1
TOTAL 13 14
C FOOTPATHS
1 Materials approved
2 Excavation for required Width & Depth
3 PCC for Footpath as per drawing/specification
4 Kerb Fixing as per drawing/specification
NA
5 Backfilling as per specification
6 Sub grade- preparation as per drawing/specification
7 Tiles laying as per drawing/specification
8 Workmanship
TOTAL
PRODUCT
QUALITY ( TOTAL MARKS OBTAINED / MAX MARKS CONSIDERED ) X 100 92.86 13 14
RATING :