Rencana Anggaran Biaya: Pekerjaan Mekanikal & Elektrikal
Rencana Anggaran Biaya: Pekerjaan Mekanikal & Elektrikal
PEKERJAAN PLUMBING
A Pelalatan Utama
1 Pompa Distribusi 2,00 unit
Kapasitas : 275 LPM
Total Head : 40 meter
Power : 3,7 KW
2 Pipa Header Dia. 4" 1,00 unit
3 Accessories dan sarana pernunjang R.Pompa 1,00 ls
4 Pipa Hisap
Pipa GIP dia. 2" 8,00 m
Gate valve dia. 2" 2,00 bh
Strainer dia. 2" 2,00 bh
Foot valve dia. 2" 2,00 bh
Flexible Joint dia. 2" 2,00 bh
Fitting dan aksesoris 1,00 ls
5 Pipa Tekan
Pipa GIP dia. 2" 10,00 m
Gate valve dia. 2" 2,00 bh
Check Valve dia. 2" 2,00 bh
Flexible Joint dia. 2" 2,00 bh
Fitting dan aksesoris 1,00 bh
6 Pressure gauge 2,00 bh
7 Pressure switch 2,00 bh
8 Ground Tank 10 m3 1,00 unit
4 Sanitary
Floor drain 6,00 bh
Kran air 9,00 bh
Clean out dia. 4" 3,00 bh
Clean out dia. 3" 2,00 bh
2 Lantai 2
1 Pipa air bersih PPR PN20
Dia. 11/2" 28,60 m
Dia. 3/4"" 70,90 m
Fitting & aksesoris 1,00 ls
2 Gate Valve
Dia. 3/4" 2,00 bh
Dia. 1 1/4" 1,00 bh
3 Pipa air kotor PVC AW
Dia. 4" 22,00 m
Dia. 3" 47,80 m
Dia. 2" 57,70 m
Dia. 2 1/2" 7,00 m
Fitting & aksesoris 1,00 ls
4 Sanitary
Floor drain 3,00 bh
Kran air 11,00 bh
Clean out dia. 4" 1,00 bh
Clean out dia. 3" 4,00 bh
Clean out dia. 2" 6,00 bh
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JMLH HARGA
(Rp) (Rp)
3 Lantai 3
1 Pipa air bersih PPR PN20
Dia. 11/2" 28,60 m
Dia. 3/4"" 106,70 m
Fitting & aksesoris 1,00 ls
2 Gate Valve
Dia. 3/4" 2,00 bh
Dia. 1 1/4" 1,00 bh
3 Pipa air kotor PVC AW
Dia. 4" 22,00 m
Dia. 3" 47,80 m
Dia. 2" 63,80 m
Dia. 11/2" 11,60 m
Fitting & aksesoris 1,00 ls
4 Sanitary
Floor drain 3,00 bh
Kran air 15,00 bh
Clean out dia. 4" 4,00 bh
Clean out dia. 3" 8,00 bh
TOTAL PEKERJAAN PLUMBING GEDUNG DIAGNOSTIK
TOTAL PEKERJAAN PLUMBING
PAJAK 10 %
JUMLAH TERMASUK PAJAK
DIBULATKAN
TERBILANG :