RENCANA ANGGARAN BIAYA

PEKERJAAN MEKANIKAL & ELEKTRIKAL

PEKERJAAN PLUMBING

NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JMLH HARGA


(Rp) (Rp)

I PEKERJAAN PLUMBING BANGUNAN UTAMA & TURUTAN ( TAHAP III )

A Instalasi Main Line Air Bersih & Air Kotor


1 Pipa air bersih PPR PN20
Dia. 3' 48,00 m
Dia. 21/2" 98,00 m
Pipa GIP Ke PDAM Dia. 2" 70,00 m
Fitting & aksesoris 1,00 ls

B Instalasi Air Bersih & Air Kotor Dalam Gedung


1 Lantai 1
3 Pipa air kotor PVC AW
Dia. 4" 204,00 m
Dia. 3" 158,00 m
Fitting & aksesoris 1,00 ls
Clean Out dia. 4" 1,00 bh

C INSTALASI TANDON AIR AREA LOUNDRY


KITVHEN, KANTEEN & K. JENAZAH
1 Pompa Distribusi 2,00 unit
Kapasitas : 275 LPM
Total Head : 40 meter
Power : 3,7 KW
2 Accessories dan sarana pernunjang R.Pompa 1,00 ls
3 Pipa Hisap
Pipa GIP dia. 2" 8,00 m
Gate valve dia. 2" 2,00 bh
Strainer dia. 2" 2,00 bh
Foot valve dia. 2" 2,00 bh
Flexible Joint dia. 2" 2,00 bh
Fitting dan aksesoris 1,00 ls
4 Pipa Tekan
Pipa GIP dia. 2" 36,00 m
Gate valve dia. 21/2" 5,00 bh
Gate valve dia. 2" 1,00 bh
Check Valve dia. 2" 1,00 bh
Flexible Joint dia. 2" 2,00 bh
Fitting dan aksesoris 1,00 bh
5 Pressure gauge 1,00 bh
6 Pressure switch 5,00 bh
7 WLC 5,00 set
D INSTALASI PLUMBING AREA CSSD

1 Water Heater Kaps. 100L 1,00 unit

1 Instalasi Air Bersih Pipa air bersih PPR PN20


Dia. 1' 15,00 m
Dia. 3/4" 51,00 m
Fitting & aksesoris 1,00 ls

3 Pipa air kotor PVC AW


Dia. 4" 25,00 m
Dia. 3" 20,00 m
Fitting & aksesoris 1,00 ls
Floor drain dia. 4" 4,00 bh
Floor drain dia. 3" 3,00 bh
Clean Out dia. 4" 2,00 bh

TOTAL PEKERJAAN PLUMBING GEDUNG UTAMA

NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JMLH HARGA


(Rp) (Rp)

I PEKERJAAN PLUMBING GEDUNG DIAGNOSTIK

A Pelalatan Utama
1 Pompa Distribusi 2,00 unit
Kapasitas : 275 LPM
Total Head : 40 meter
Power : 3,7 KW
2 Pipa Header Dia. 4" 1,00 unit
3 Accessories dan sarana pernunjang R.Pompa 1,00 ls
4 Pipa Hisap
Pipa GIP dia. 2" 8,00 m
Gate valve dia. 2" 2,00 bh
Strainer dia. 2" 2,00 bh
Foot valve dia. 2" 2,00 bh
Flexible Joint dia. 2" 2,00 bh
Fitting dan aksesoris 1,00 ls
5 Pipa Tekan
Pipa GIP dia. 2" 10,00 m
Gate valve dia. 2" 2,00 bh
Check Valve dia. 2" 2,00 bh
Flexible Joint dia. 2" 2,00 bh
Fitting dan aksesoris 1,00 bh
6 Pressure gauge 2,00 bh
7 Pressure switch 2,00 bh
8 Ground Tank 10 m3 1,00 unit

B Instalasi Main Line Air Bersih & Air Kotor


1 Pipa air bersih PPR PN20
Dia. 11/2" 40,00 m
Fitting & aksesoris 1,00 ls
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JMLH HARGA
(Rp) (Rp)
2 Pipa Air Kotor PVC AW
Dia.4" 40,70 m
Dia. 3" 55,00 m
Dia.2" 11,00 m
Fitting & aksesoris 1,00 ls
3 Septictank dan Resapan 3,00 unit By SipiL By SipiL
4 Grease Trap 1,00 unit By SipiL By SipiL

C Instalasi Air Bersih & Air Kotor Dalam Gedung


1 Lantai 1
1 Pipa air bersih PPR PN20
Dia. 11/2" 39,00 m
Dia. 1" 23,60 m
Dia. 3/4"" 177,60 m
Fitting & aksesoris 1,00 ls
2 Gate Valve
Dia. 3/4" 4,00 bh
Dia. 1" 1,00 bh
3 Pipa air kotor PVC AW
Dia. 4" 50,50 m
Dia. 3" 23,10 m
Dia. 2" 57,20 m
Fitting & aksesoris 1,00 ls

4 Sanitary
Floor drain 6,00 bh
Kran air 9,00 bh
Clean out dia. 4" 3,00 bh
Clean out dia. 3" 2,00 bh

2 Lantai 2
1 Pipa air bersih PPR PN20
Dia. 11/2" 28,60 m
Dia. 3/4"" 70,90 m
Fitting & aksesoris 1,00 ls
2 Gate Valve
Dia. 3/4" 2,00 bh
Dia. 1 1/4" 1,00 bh
3 Pipa air kotor PVC AW
Dia. 4" 22,00 m
Dia. 3" 47,80 m
Dia. 2" 57,70 m
Dia. 2 1/2" 7,00 m
Fitting & aksesoris 1,00 ls
4 Sanitary
Floor drain 3,00 bh
Kran air 11,00 bh
Clean out dia. 4" 1,00 bh
Clean out dia. 3" 4,00 bh
Clean out dia. 2" 6,00 bh
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JMLH HARGA
(Rp) (Rp)
3 Lantai 3
1 Pipa air bersih PPR PN20
Dia. 11/2" 28,60 m
Dia. 3/4"" 106,70 m
Fitting & aksesoris 1,00 ls
2 Gate Valve
Dia. 3/4" 2,00 bh
Dia. 1 1/4" 1,00 bh
3 Pipa air kotor PVC AW
Dia. 4" 22,00 m
Dia. 3" 47,80 m
Dia. 2" 63,80 m
Dia. 11/2" 11,60 m
Fitting & aksesoris 1,00 ls
4 Sanitary
Floor drain 3,00 bh
Kran air 15,00 bh
Clean out dia. 4" 4,00 bh
Clean out dia. 3" 8,00 bh
TOTAL PEKERJAAN PLUMBING GEDUNG DIAGNOSTIK
TOTAL PEKERJAAN PLUMBING
PAJAK 10 %
JUMLAH TERMASUK PAJAK
DIBULATKAN
TERBILANG :