You are on page 1of 214
Chapter 1 LOADING, UNLOADING, CARRIAGE CRUSHING OF MATERIALS AND $ ouT Reference to Through NE. |_ MORD |Description unit |@bOUr) “Rate - | specifications ate | Rs.) 14 Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual Means (Loading of Lime, Aggregate, Cum ~ 43.60 Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m (ii) Loading of Earth, Sand, Cum — 21.80 Moorum, Manure, Flyash by manual means including a lead upto 30 m Unloading of Lime, Aggregate, Cum -- 21.80 Stone Boulder, Brick Aggregate. Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m (iv) Unloading of Earth, Sand, Cum 13.40 Moorum, Manure, Flyash by manual means including a lead upto 30.m 12 Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick ‘Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Mechanical Means (Loading of Lime, Aggregate, Cum ~ 31.50 Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by 20 Sr. No. Reference to MORD Specifications Description Unit Labour! Rate (Rs) Through Rate (Rs.) 13 14 15 mechanical means including a lead upto 30 m Placing tioper at loading point, loading with front fend loader excluding time for haulage and retum trip, Loading of Earth, Sand, Moorum, Manure, Flyash by mechanical means including a lead upto 20 m.Placing tipper at loading point, loading with front end loader excluding time for haulage and retum trip. (iii) Unloading of Earth, Sand, Lime moorum, Aggregate, Stone Boulder, Brick Aggregate Kankar, Building Rubbish, Manure, Crushed Slag, Fiyash. Stone for Masonry Work by mechanical means. Loading, Unloading and Stacking of Bricks by Manual Means (Loading of Bricks by manual means including a lead upto 30 m (ii) Unloading and Stacking of Bricks by manual means including a lead upto 30 m Loading and Unloading of Cement by Manual Means (i) Loading of Cement by manual means including a lead upto 30 m Unloading of Cement by manual means including a lead upto 30 m Loading and Unloading _ of Structural Steel and Stee! Bars by manual means (Loading of Structural Steel Steel Bars by manual means including a lead upto 30 m (ii) Unloading of Structural Steel Steel Bars by manual means including a lead upto 30 m 21 cum cum 1000 Nos 1000 Nos Tone Tonne Tonne Tonne 15.90 4.85 73.30 73.30 55.30 55.30 59.70 58.70 Reference to MORD |Description Specifications, Sr. No. unit [Rb (Rs) Labour! Through Rate (Rs.) 16 Loading and Unloading of Bitumen Drums by Manual Means (i) Loading of Bitumen Drums by manual means including a lead upto 30.m (ii) Unloading of Bitumen Drums by Manual Means including a lead upto 30.m Note: The rate is inclusive of the self weight of drum 17 100 Loading and Unloading of Timber by Manual Means () Unloading of Timber by manual means including a lead upto 30 Unloading of Timber by manual means including a lead upto 30 m ‘Note :Density of wood has been assumed as 900 kg per cum. Ifthe density is less the output may be reduced proportionately 18 Loading and Unloading of C.C, Blocks, Kerb, ete. (i) Loading with care .C. Blocks, km Stone, 200 m_ Stone Boundary Pillar, Kerb, Channel Bond Stone, ‘ete. by manual means including a lead upto 30 m (ii) Unloading with care Cc. Blocks, km Stone, 200 m Stone, Boundary Pillar, Kerb, Channel, Bond Stone, ete. by manual means including a lead upto 30 m 19 Loading and Unloading of Hume Pipes (Loading of RCC Hume pipes by mechanical means including a lead upto 30 m ‘A 900/1000/1200mm dia RCC Hume pipe 22 Tonne — Tonne ~ Tonne - cum — cum — PiPipe 65.05 59.25 95.90 95.90 144.15 144.18 42.55 Reference to Through NE | MORD [Description unit |tabour| “Rate - | Specifications (rey | (RS) B Teommdia ROG Hume pre -PPpe — 25.50 © 600/500/300mm dia Hume pipe PIPipe — 1825 Unloading of RCC Hume Pipe by manual means including @ A 900/10001200 mm dia RCC PiPipe ~ 175.08 Hume pipes 8 750mm dia Hume pipe PiPipe — 145.9 © 600/500/300mm dia Hume pipe PIPipe ~ 109.40 (il) Unloading of RCC Hume Pipe by manual means including a lead upto 30m A 900/10001200 mm dia Hume PIPipe — 29.00 pipe & 750 mm dia Hume pipe PiPige = 1740 © 600500/300 mm dia Hume PiPipe ~ 1245 pipe 4.10 Haulage excluding Loading & Unicading Haulage of materials by_ tipper excluding cost of loading, unloading and stacking () Surface road TiKm. = 2.30 (i) Unsurfaced Gravel road TiKm. = 2.80 Gi) Katcha track and track in River T/Km. = 5.60 BediNallah bed & Choe bed 4m Haulage excluding Loading & Unicading Haulage of materials by truck excluding cost of loading, unloading and stacking 1) Hume pipe 900710001200 mm dia case! (i) Surface road. PiPige ~ 25.80 23 Reference to Through NE | MORD [Description unit |tabour| “Rate - | Specifications (rey | (RS) Case (i) Unsurfaced Gravel road PiPipe 30.70 Caseuill (i) Katcha track and track in River PIPipe ~ 6175 Bed Nallah bed & Choe bed ll) Hume pipe 750 mm dia case (i) Surface road PiPipe ~ 15.30 case-ll (i) Unsurfaced Gravel road PiPipe 1240 Caseuill (i) Katcha track and track in River PIPipe ~ 37.08 BediNallah bed & Choe bed Ill Hume pipe 600/5001300 mm dia cased (i) Surface road. PiPige ~ 10.95 case:ll (i) Unsurfaced Gravel road PiPipe — 13.5 caseulll Gi) Katcha track and track in River PIPipe 245 Bed Nallah bed & Choe bed 4.42 Supply of Quarried stone and hand breaking (i) Supply of quarried stone and Cum ~ 375.50 hand breaking into coarse aggregate to Grading 1 (90 mm to 45 mm) as per Table 400.8 of Technical Specifications. 24 Sr. No. Reference to MORD Specifications Description Unit Labour! Rate (Rs) Through Rate (Rs.) 1.43 Note: ) Supply of quarried stone and hand breaking into coarse aggregate to Grading 2 (63 mm to 45 mm) as per Table 400.8 of Technical Specifications Supply of quarried stone and hand breaking into coarse aggregate to Grading 3 (53 mm to 22.4 mm) as per Table 400.8 of Technical Specifications. (WV) Supplying and stacking at site hard stone for soling (V) Supplying and stacking course sand at site of work. Crushing of Stone Aggregates 100 per cent passing through 53 mm sieve as per Table 500.6 of Technical Specifications. Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 Uh capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates 100 per cent passing through $3 mm sieve as per Table 500.6 of Technical ‘Specifications including the cost of stone 800 cum of stone boulders are needed to get 750 cum of stone aggregates. 85 per cent of above cost will be attributed to the production of 750 ‘cum of stone aggregates of 40 mm ‘ize and balance 15 per cent will be for smaller size aggregates and stone dust which comes out as @ by- product The integrated stone crusher includes primary and secondary ‘crushing units. 25 cum Cum cum cum Cum 619.55 663.60 363.00 363.00 379.50 Reference to Through NE | MORD [Description unit |tabour| “Rate Specifications (rey | (RS) 144 Gnishing of Stone Aggregates 100 per cent passing through 22.4 mm Sieve as per. Table 500.6 of Technical Specifications. Crushing of stone boulders of 130 Cum ~ 432.55 mm size in an inlegrated stone rushing unit of 200 th capacity comprising of — primary and secondary rushing units, belt conveyer and vibrating screens to ‘obtain. stone aggregates 100 oer cent passing through 22.4 mm sieve fas per Table 500.8 of Technical Specifications including the cost of stone. Note 1 800 cum of stone boulders are needed to get 670 cum of stone chips of required size. 2 90 per cent of above cost will be atiibuted to the production of 670 cum of stone aggregate and balance 40 percent wil be for smaller size aggregates and stone dust which comes out as a by-preduct 3 The integrated stone crusher includes primary and secondary crushing unit. 1.48 Crushing of Stone Aggregates Nominal Size 13.2/11.2 mm as per Table 500.9 of Technical Specifications. 26 Sr. No. Specifications Labour| Through Rate (Rs.) Description unit [Rb (Rs) Note: 1.46 T Grushing of stone boulders of Cum — 484.40 150 mm size in an integrated stone crushing unit of 200 th capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates of 13.2 mm nominal size as per Table 500.9 of Technical ‘Specifications including the cost of stone. Il Crushing of stone boulders of Cum — 484.40 150 mm size in an integrated stone crushing unit of 200 1h capacity comprising of primary and secondary crushing units, belt conveyor and_ vibrating screens to obtain stone aggregates of 11.2 mm nominal ste as per Table 800.9 of Technical Specifications including the cost of stone. 800 cum of stone boulders are needed to get 600 cum of stone chips of size 13.2 mm and 125 cum stone dust. 95 per cent of above cost will be attributed to the production of 600 cum of stone chips of 13.2 mm size and balance 5 per cent to the production of stone dust which comes out as @ by-product. The integrated stone crusher includes primary and secondary crashing units Crushing of Stone Aggregates 9.5 mm Nominal Size as per Table ‘500.9 of Technical Specifications. 27 Sr. No. Reference to MORD Specifications Labour| Through Rate (Rs.) Description unit [Rb (Rs) Note: 100 Crushing of stone boulders of 750 Cum — 508.85 mm size in an integrated stone crushing unit of 200 vh capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates of 9.5 mm nominal size a8 per Table 500.9 of Technical Specifications including the cost of stone. Crushing of stone boulders of Cum ~ 514.50 450mm size in an intergrated stone crushing unit of 200vh capacity comprising of | primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates of 9.5mm nominal size as per table 500.9 of Technical specifications including the cost of stones, 800 cum of stone boulders are needed to get 600 cum of stone chips of size 6.7 mm and 125 cum stone dust. 95 per cent of above cost will be attributed to the production of 600 cum of stone chips of 9.5 mm size and balance 5 per cent to the production of stone dust which ‘comes out as a by-product. The integrated stone crusher includes primary and secondary crushing units. Setting Out (i) Typical benchmark as per Km. 485.60 2346.4 drawing 200.1 and as per Technical Specification clause 108. (ii) Typical reference pillar as per Km, 233.80 1068.25 drawing 2002 and as per Technical specification clause 108 28 Reference to MORD |Description unit |tapour Specifications (Rs) Through Rate (Rs.) 4000 mm — _ceMeNT PLASTER 45MM THICK BW =0:325 cum M-10=0:10cum 475 Cum 83 Stim 4Smm 38 (M0 Gracey 1000 mm e—_‘ttoms gs (NOT TO SCALE) Drawing No. 200.1 <— cement praster . ‘SMM THICK E EW = 0.192 Cum & M10 008 cum Bw =0.199 cum PLASTER =1.500Sim iETTING Remarks 31 Remarks 32 Remarks 33, Remarks 34 Remarks Remarks 36 Remarks 37 Remarks 38 Remarks 39 Remarks 40 Remarks 41 Chapter 2 SITE CLEARANCE 24 22 23 Reference to MoRD Specification 201 201 201 Description Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201 By Manual Means Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal _ of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead ‘of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 () ByManual Means (A) In area. of non-thomny jungle (8) In area of thomy jungle (I) By Mechanical Means (A) In area of non-thorny jungle (8) In area of thomy jungle Cutting of Trees _ including Cutting of Trunks, Branches and Removal of Stumps 31 Through |Remarks Hectare 5,872.70 - Hectare Hectare Hectare Hectare 22,440.10 30,198.40 45,774.70 56,231.10 Reference to sr. ‘¢_ | Labour} Through |Remarks MORD unit No. | specification Rate | Rate Cutting of trees, Including cutting of trunks, branches and removal of stumps & roots, refling compaction of -backfiling and stacking of serviceable material by manual means vith all lifts 28 per Technical Specifeation Clause 201 A. Lead upto 100m (i) Girth above 300mm to Each = 117.30 600 mm (i) Girth above 600mm to Each ~ 219.80 900 mm Gil) Girth above 900 mm to Each — 410.50 +800 mm (iv) Girth above 1800 mm to Each ~ 762.60 2700 mm (v) Girth above 2700 mm to Each 1,592.00 4500 mm (vi) Girth above 450mm Each 4,505.38 B. Lead upto 1000 m () Girth above 300mm to Each = 12985 600 mm (i) Girth above 600 mm to Each 287.40 800 mm (ii) Girth above 900 mm to Each 460.60 1800 mm (W) Girth above 1800 mmto Each — 897.78 2700 mm (v) Girth above 2700 mm to Each ~ 1,675.50 4500 mm (v) Girth above 4500mm Each 4,714.08 24 201 Uprooting and Removing Stumps & Roots Uprooting and Removing Stumps & roots, compaction of backfiling and stacking of servicable material by manual means as per Technical Specification Clause 201 32 Reference to sr. ‘¢_ | Labour} Through |Remarks MORD unit No. | specification Rate | Rate A_Lead upto 100m (Girth above 300 mm to Each 66.25 600 mm (i) Girth above 600 mm to Each — 108.95 900 mm (ii) Girth above 800 mm to Each — 224.88 +1800 mm (i) Girth above 1800 mmto Each — 436.95 2700 mm (W) Girth above 2700 mmte Each — 286.45 4500 mm (vi) Girth above 4500mm Each — 2,515.38 B. Lead upto 1000 m (i) Girth above 300 mm to Each — 69.15 600 mm (i) Girth above 600 mm to Each — 119.40 900 mm (ii) Girth above 800 mm to Each — 237.00 +1800 mm (i) Girth above 1800 mmto Each — 453.70 2700 mm (\) Girth above 2700 mm te Each — 907.30 4500 mm (Wi) Girth above 4500mm Each — 2,819.70 25 202 Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and’ other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal_of unserviceable material and stacking the serviceable material with all ifts and lead of 1000 m as per Technical Specification Clause 202 ()) By Manual Means 33, Sr. No. Reference to MORD Specification Unit Labour Rate Through |Remarks| Rate 26 27 202 202 (A)_Lime Conerete (8) Cement Concrete (C) Reinforced Cement Conerete (Wl) By Mechanical Means (A) Cement Concrete (8) Reinforced Cement Concrete Dismantling Brick/Tile Work Dismantling of existing structures like culverts, bridges, retaining walls and’ other structures comprising of brick masonry including disposal of unserviceable material and stacking the serviceable material with all lt and lead of 1000 m as per Technical Specification Clause 202 (A) Lime mortar (8) Cement mortar (©) Mud Mortar (0) Dry Brick Pitching or Brick Soling Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and’ other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000_m as per Technical Specification Clause 202 (A) Rubble Stone Masonry in Lime Mortar 34 ‘Cum! cum Cum Cum cum Cum Cum cum Cum cum 207.60 237.00 538.25 369.85 567.20 148.90 178.25 137.18 131.30 160.65 Sr. No. Reference to MORD Specification Unit Labour Rate Through Rate Remarks 28 29 2.10 211 202 202 202 202 (©) Rubble Stone Masonry in ‘Cement Mortar (©) Rubble Stone Masonry in Mud Mortar () Dry Rubble Masonry (€) Dismanting Stone Pitching / Dry Stone Spalls, (F)Dismanting boulders laid in wire crates including opening of crates and stacking dismantled materials Dismentling Wood work wrought and planed fixed in Frames of Trusses upto a height of 5 m above plinth level as_per Technical Specification clause 202. DismentlingSteel work in all types of sections upto a height of 5 m above plinth level excluding cutting of rivet as technical specification clause 202. (A) Including dismembering (8) Excluding dismembering (C) Extra over items(A) and) for cutting rivets Scraping of bricks dismantled from brick work including stacking as__per_ Technical In Lime/ Cement Mortar ‘Scraping of Stone from Dismantled Stone Masonry as. per Technical Specification Clause 202. In Cement or Lime Mortar 35 ‘Cum! Cum cum cum cum cum Tonne Tonne Each 1000Nos cum 178.25 148.90 143.00 137.15 148.90 312.10 636.75 466.70 4.30 -- 513.85 ~ 206.10 -- Sr. No. Reference to MORD Specification Unit Labour | Through Rate | Rate Remarks 2A2 2.13 Note. 2.14 202 202 202 ‘Scraping Plaster in Lime or Cement Mortar from Brick / ‘Stone Masonry as per Technical Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. (A) Upto 600 mm dia Hume pipe (®) Above 600 mm to 900 mm dia Hume pipe (C) Above $00 mm dia Hume Pipe The excavation of __ earth, dismantling of stone masonry work in head walls and protection works is not included which is to be measured and paid separately. Credit for retrieved stone from masonry work may be taken as per actual availability Dismantling of -——Filexible Pavements Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m stacking serviceable. and unserviceable materials separately as per Technical Specification Clause 202 () By Manual Means (A) Bituminous Courses (8) Granular Courses (Il) By Mechanical Means (A) Bituminous Courses 36 Mire Mire Mire cum cum cum 7.20 76.23 = 103.05 — 176.50 378.85 284.60 208.30 Sr. No. Reference to MORD Specification Labour Rate Through |Remarks| Unit Rave 215 202 Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202. Dismantling of cement concrete pavements by mechanical means Using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials, separately Note: The above analysis is for removal of complete 2.16 247 2.18 2.19 pavement. In case full depth repair work is required to be done after dismantiing, provision of 2 concrete saw cutter may be added for 0.25h, 202 202 202 202 Dismantling Guard Rails Dismantling guard rails by manual means and disposal of dismantied material with all lifts and upto a lead of 1000 m, stacking serviceable materials ‘and unserviceable materials separately as __ per Technical Specification Clause 202 Dismantling Kerb Stones Dismantling kerb stones by manual means and disposal of dismantled material with all ifts and upto a lead ‘of 1000 m as per Technical Specification Clause 202 Dismantling Kerb Stone Channels Dismantling kerb stone channels by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 m as per Technical Specification Ciause 202. Dismantling Kilometre Stones 37 1,516.35, Running 42.90 metre Running — 10.55 metre Running — 15.90 metre Reference to MORD Specification Sr. No. Unit Labour Rate Through |Remarks| Rate Dismanting of kilometre stones including cutting of earth foundation and disposal of dismantled material with all lifts and lead upto 1000 m and backfiling of pit as per Technical Specification Clause 202 “a ® © ©) Sth km Stone (Ordinary km Stones 200 m Stones Boundary Pillar 2.20 202 Dismantling of Fencing Dismantling of barbed wire fencing / wire mesh fencing including posts, foundation concrete, backfiling of pit by manual means including disposal of dismantled material with all lifts and upto a lead of 1000 m, stacking serviceable material and unserviceable material separately as per Technical Specification Clause 202 2.21 202 Dismantling of Cl Water Pipe Line Dismantling of Cl water pipe line 600 mm dia including disposal with all lifts and lead upto 1000 m and stacking of serviceable material and unserviceable material separately under supervision of concemed department as _per Technical Specification Clause 202 Note: The rate analysis does not include any excavation in earth or dismantling of masonry works which are to be measured and paid separately. 222 202 Removal of Cement Concrete Pipe of Sewer Gutter 38 Each — Each — Each — cum — Running — metre Running — metre 172.78 106.80 23.05 23.05 21.40 72.55 Sr. No. Reference to MORD Specification Description Unit Labour Rate Through |Remarks| Rate Removal of cement conorete pipe Running — of sewer gutter 1500 mm dia under the supervision of _ concerned department including disposal with all lifts and upto a lead of 1000 m and stacking of serviceable and unserviceable material separately but excluding earth excavation and dismantling of masonry works as per Technical Specification Clause 202, Note: The rate analysis doss not include any excavation in earth or dismantling of masonry works which are to be measured and paid separately. 2.23 202 Removal of TelephoneiElectric Poles and Lines Removal of telephone/electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concemed department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per Technical Specification Clause 202 39 metre Each 88.15 85.25 Chapter 3 EARTHWORK, EROSION CONTROL AND DRAINAGE Sr. No. Reference to MORD Specification Description Unit Labour Rate ‘Through Rate 34 301.4 Preparation of Foundation for Embankment Scarifying Existing _ Granular Surface to a Depth of §0 mm by Manual Means Searifying existing granular surface to a depth of 50 mm and disposal of scatified material with a lift upto 3m and leads upto 1000 m as per Technical Specification Clause 301.4 Note: In cass material is to be reused at site, transportation cost catered above (Sub.item b) for disposal shall be deleted. 32 33 301.4 301.5 Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with 2 lift upto 3 m and lead upto 1000. m as per Technical Specification Clause 301.4. Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 3002 as per_Technical Specification Clause 301.5 41 Sqm Sqm Cum 12.15 6.60 56.85 Reference to iors voit] bea Mgsuah Specification ‘Note: In case the earth cutting is done by dozer and pushed for fling in the embankment, the input of dozer in the cost of embankment shall be deleted as the same is already provided in the cost of excavation. However, if the earth is dumped by tippers from roadway cutting, the input of dozer for spreading is required to be provided. 3.4 301.5 Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with Cum 178.10 approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 35 302 (i) Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in Cum 55.10 ~ soil using manual means for camying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 (i) Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in Cum — 46.40 soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. 42 Reference to iors voit] bea Mgsuah Specification (ii) Excavation in Soll_using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in Cum = 28.00 soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of ines, grades and cross-sections, and transporting tothe embankment location with a lift upto 1.5 m and lead upto 1000 _m as per Technical Specification Clause 302.3 3.6 302.36 Excavation in Marshy Soil Excavation for roadway in marshy Cum — 41.50 soil with hydraulic excavator 0.9 cum bucket capacity including cutting and_loading in tippers and disposal with a lft upto 1.5 m and lead upto 1000 m, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.36 3.7 302.311 Removal of Unsuitable Soil with Disposal upto 1000 m Removal of unsuitable soil, Cum including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by sultable soll, which shall be paid separately as per Clause 2035.2 as per Technical Specification Clause 302.3.11 28.00 43

You might also like