LNG in Indi
10.0 General
Although Natural Gas ws found in Inia bask as 189, bate ss
ulzatio picked up in eal commercial sense aftr the Mai Hi
and South Basin Gas ings in 1”. Gas Tass
Int first Gas rink pip ine nny Har Ving
Fiplinein 1987, Only after tht Ges met stare ouins
1980,erstvtile Gas Aon fia (GAIL ooes8s9
Import projet. The autor hs ben par ht eouy GAIL
fine was only six year ld company andthe estes at to
Wetenotenoushto independent snleake sch ighsapi
BOjects. These initiatives, subsequently led vo the formation
Company called Petronet LNG Lic. in 1999 for import of LNG
‘Mstegasification in India
__Gorerent of Inia sonst
¥ison2025 in 2000. Asperthisdoc
emai $0 msaisiedstany tine exe ati
LNG eis
expected gas finds. The
‘Scanned by CamScannerNe An Instn Score
anda aw emergence oF ANY LNG rp,
jin Ini
to global enteprencarsn ints lain
growth, Sincetenthe ned Torenetsy
ate Tere has ot ben significant
High and South Basing ateses
ofits aso ichncighbous a pln)
ng isthe gist of such Torin the orn
(G Lid, (PLL) are GAIL (Io.
ion Limited (ONGC), Indian 0
rand Bharat Petroleum Corporation Lis
ies are under the Ministry of Ps
olds 12.5% equity sharin PLL ond
Theblance HY equity
ns andthe pubic.
FENG from RasCas, Qo =
72004, n 2005, the LNG re
at Dae in Guat
cept freak wat
2004, Figure 10.2
of PLL Dab.
has nde
way of adding 0"
workissehe
works 08
0 nn Se
Fig. 10.1 PLL Dabs Rags Trina.
Fig, 10:2 LNG Storage Tonks
‘Scanned by CamScannerFig, 103 PLL Oahe| Jetty & Ship Unionsing Fac
‘4 Shell-Hazira LNG Repas Termin
The poncer in LNG
Piast infosactirecapa
PI2SMMTPAreras capi
especty of hs termina
Jacrementacost isto MNT 7
Pea Fi,10t hows LNG sors an >
Iona. Hasire LNG
Shall Group whore
TNGand Pocteonparic
nd Toal Gaz Electric Hotdns
Fp 1OALNG Storage Tent nares st LNG er
2 PLL Kochi Terminal
Petronct LNG has planed to establish nother LNG reas
‘Koch nthe Kerala State at Western Coast of Ini.
“The design capacity of this terminal is2-S mp exp
smmpta, The terminal land has been acquired by the comps
Plant is expected oe commissioned by 2011
“TheLNG sourcing orginally was par ftom fn wher
its promoters, GAIL, IOCL and BPCL have signed LNG SP
NIGEG of ramin ane 2005 for S mmtpa of LNG comer
2011. However fran LNG SPA has not shown much prow
PLLon behalf fits promoter companies GAIL 1OCL
has now reached an advance stage of stiking 2 deat»)
[LNG Austaliato get 375 mmipa of LNG for Kochi Te a tri wa commie
Cee Rea GE EREIREITINGOLLNG) irene newo*'"* [MMM maoramet does neon
KochitoBangaloe via Cambor KochitoKayamila™!" | arse operating ts 6 45%
to Kijarode have been planned as apart of Indian Nato!
Hazia LNG rega emis! was commis
ms
‘Scanned by CamScannera
Dring 2905 and up 10 mid 2006 this terminal emi
wien. Thereafter since firs quarterof 2006, Haz NG,
‘Biarkablywelinsouringregasifying and sling LNG sync
nln bough fo nunber of LNG producing countess
World Fi 10 shows LNG unleading sytem at Hazira| Nts
Haris LNGhas connectivity with HVI Ppeine sd lso wi
PPL Pipeline systers. Therefore, regassifed LNG frm his
hasbeen supplied to various customers in Gujarat, None
nan, Mundin Mahara along DUPLIDPPL pipeline
TING resus terminal ts now been operating & etl
“Table gives anaccountof LNG spt cargos brs In
the period January Decemibe 2006,
9.105 Unloading fei at Hazica LNG regs trina
4. RGPPL's Dabbol LNG Re
f-gas Terminal
Enron promoted Dabhol Power Company was launched it”
‘an LNG re-gas terminal of SMMTPA and an integrated pO¥e"!
962150 MW capacity. Thee p
GE Fr 9 FA as turbine ee
MBITPAOCLNG wasted up wit AD
TNG(LOMMTPA) The slance> 9
Fate was tobe tid upon fon
{By 2000, power tn N
Borge tanks of |
fomplete, The marine work
teomplete. Break water was 20
work on this project was shandoned dc
Wich could not have heen absorbed
‘which waste beneficiary ‘
‘anon starter with legal lai a
holders. Finally, Government
complex. Fig. 10:6givesb
‘Scanned by CamScanner(28334), Nation Thermal Power Corrine
Fig. 108 RGPLL-
ower tran rain) has been re-started on Nap g
The entire complex is being revamped with ic help of wn
consortia, This complex is scheduled t run on Nes
200exep for break water which will he competed by So
forthiscomplexis being supplied from Qataron sot ene vn
2007, For ong term contrac, the company ishaving Us.
Algeria, ADGAS, Oman LNG Yernen LNG an Austla fe
And 10.8 show the partly completed break water & LNG srs at
‘eg terminal,
Fig, 10.7 RGPLL-Debhot-Breskwater (patty compl
DDhabol LNG termina hasals bee sone as
gh Gas Pipe, which contin
Una retae 1 Pipeline (DPPL) 30" d
Utne (Panto
tek n pnt er opie or
tats Pin psn
aim Jed flexibility to Dabo!
Ti cumin ha prvi ahd ely
SS nchcoul en
ncn rg Sicha
Presa andiar atc LNG xsi
itean pt ENG fer Dato & Lic ms
5 Indias NG Termin Mamba Propel
TATA Power, GAIL and TOTAL purse
1 :
baie i. an ai, Seamed by CamScanner‘one LNG re asterminal at Chemburin Mumbai in 1995, oi
Sen
clearance could nthe secured tal
Joincrease. By Octobe 207 tcrosseds
considered for revival by GSPCL acon yn
tof Guat.
| Ennore Terminal anil Nadu)
China Light Co and Woodside forms
G re-ga terminal anda power plan»:
eas called “Dakshin Bharat Enerss
issuedby Government of Ta
and MoU between RasGas, Qso>
Pharace Block where IOC & OIL a joint pr
on activites on bu -ack concep
vas subsequently jined by GAIL topromoe thsi
after non-confrmation of LNG del which Gait. lOc
singed with NIGEC, Tran for $ MMTPA of LN
eominencenes scheduled fm 2010, he pot inne
promoted Mangalore LNG Terminal
rg majity harem Magar Reiner & Perches
ONGC prepared an ambitious pan esublsh an LNG
minal at Mangalore basicaly toserves feedstock orbit
Petrochemical plant and balance lan gs for power
and merchant sl, However, deo LNG sourcing his
is lsoin dormant sie.
Terminal Gujarat)
py sconsdeing Wo etal lige atria
Fn Gujrat. This group (Adan is already havin pot
onan other baninss oc Mana, which ives them the eu
Toit ads an Manppad NG Re Trial
Rent nanur us Kastan Keriet
es dn Cota ee
aa eines cin r=
IN cnn NOT ger
serrate ove eo
Ba ere se ns uli
an a (PLL_ Daan Shel aia) ansi me
x robe commissioned by end 2007 and one Da
ce mt
een ort oa
sl Terao
i etnran saps
as
rr
‘Scanned by CamScannerNG Aa an Sears
{tallenging tsk 10 develop Indian 3s marhy
‘system in India isnot supported by space heating ond Tae) 2
Eis sersare power generation an er ee
ine plans. Coal
Songer afLNG fever tron These =
rs has inteated dh
bring recent pst urns
kt wasn comforableo secs ING
deliverdpriccof S6SMMTU Tasos
80 yearsofmarketdevelopnnt LNG space
leto the marke,
that Iria wll have $196 LNG reg rnin
HLNG nameplate capacity ofan OMNI
olin so farasits gas markt sconce
Gas market survey, hive pn
could nt be established bi:
nby nal gasp
variance. For exa'
U0-Ao vee re
tment easel Tsoi
In mos optimistic sensi ati ss
adobe gad Even wih mserahrtantnes
thee requirement increases insane prparoncvey sea
gas demand projectionhave een naked out harevecn
Sector ferllustation since son rau
than 504 foal zs aca te Gas Like Coma
the Power Sector
“However dean postin the woking rope Minsy
eras ena aloys
inno spo,
ees
Serres tt oes
ee coor pease md
eens
Se te eee
ne a arco
an ee
pe er)
eerie
Se eat pe a
»
‘Scanned by CamScannerwhere LNG reessitcaton,
the ates ike pants
building, fab, warchouse. mare,
nexcept that ligula,
‘Scanned by CamScannerssn tri e.
Ricbeing an important economic and energy sving svc beexclded should be detenine rm the design conan
respec eonsieratonothisaspect at appropiate sction
arapee Atypical LNG repasification terminal will compen 1) aerate ,
Saag Pate htt loogscinalrechion a
Pipcronge fick release hooks. Muiple hook assemble sould bey
Be esr tert coins of various wi ae i
PS scan imegnted cold ecovery syste)
‘The LNG tankers are moored and berthed along the jet sp
designed for LNG handing. LNG is pushed out ofthe shi a
the lan tased storage tanks with thee of unloading arms cone
tothe stip. though an insulted cryogenic pipe
10.3.1. The Jey
‘The jty consists of beting fail
associate facies
unloading arms and
10312 ner
TMenumbroni af or decminey hs
[NG tesrottestp innate
ste on The eh ay be ini ie ps
een the athe oft yen
‘Strip peg input
ye nein ric
‘ase csbcteeg a as
‘hile pov Wasp)
‘Seanned by CamScannerWN An in ee
sion
ingest
i fats de to feuen arm yd
wien Tiss dey ono fone mt
pee ei ana ou ciclo LNG UNG pc huh eg
Sega and sent bck'othe aporaon ston hep ne
mits
iy two nig ics ile Wher ag
fing plce this opis forre-ciclaton fr heping he
inch down condition
i fll fled with LNG andthe boi off formats sntio the
orto the vaporiser section
ferminal contol 001 to je
‘unloading operations shal
yeSECUNy Tze should ein pie
jon exclusion zone snd prey
int the terminal an jel
Section
ge section consss of LNG woage asin tn paps,
andre iguetction fc
according ship is,
Separate sets fins aero
See mzerine cue fenton of stress band wk LNG.
ee ome continuous spots enol stn. An LNG ws
foemethe awn nies
incaeofemezeny
ter istions =! Be
fans becepbe of wisn chy a
id and fw empcrar LNG In er et ise
Jyogeic mat chao cto ein
alloy, Nickel eri sel or 36 Nise)
eonrteare orl el
1 evaporatonlowesad
is gear povided
‘Scanned by CamScannercomions the tank is subject to vaaion
Also during stat p.tank tempers regu
eto cyonctenpaaes Sri
varios esses pir ncr
eth tanks shall be capable isang
pil off Gas & Religuefaction
of boo ga recovery fromthe tanks pi
rit nto the LNG send out system or nett in he
sion network BOG also wa for vapours
during unloaing thereby avsiting peste pin he
If vapour return to he ship tank snot consider the
be designed ule isda uty so
ion, the instantaneous BOG geerion is
and necessary provision shale proved topo
pressure as wl tak cae ote ate ih.
jon & Recycle Storage: Ligation processed
G production plant ma be wo ore -gosation Re
processes favourable compared her cies
m & Mixing wih gs sched the Tea hs
is compressediothe network pesureand mini
product Buti shouldbe kepin min whi =
alc ofthe bof ss may redeetichsins
pied NOTE
aires
= phase insted
incorporation
jm eerie out wing LNG co
tee
reads to ccrgy savings ser
tno he BOO
sfx vaporition on 8
pliers t=
:
‘Scanned by CamScanner186 An ie Sora
provides with Mare ten Ble pressure of teint yar
soos z ae
handling system ence’
lable,
ps are used fr pumping the LNG from insane
rework resre hugh vapien Th sc a,
or vertical mulisagctutosunerih poss,
accomplished bythe transfer of beat o LNG fom
air process sea. Ithe aps rcs.
its bubble point, vaporised and hen wate po
et be designed based onthe gui he
ith LNG forts aprsation. maxi NG
eatavable inthe eating msn lowest
medium.
tanker receiving facilities and minimum port
Berthing conditions:
sip tanker receiving ond por fies ae
erin. However thsefeee seis
al guidance and information of te eles Fr ds
may be det infoaton ae i
for LING Ports and JetiesbySIOTTO. Ss
Tankers and Tein Oper
Fponchos tet
thandbave minimum wih ps"
aliens
ee
‘Scanned by CamScannerrequires sung tsk mane
ino before anna
ig limits, need ob
fr pot faites
current in the ten
neces hold eles th
speed while ship naignes wih the mann
: The design citer forms
speed 60 knot from any dein
feurent 3 knots.
onthe berth ist then of 27h hon
tions can take place wp 0S
Ska wind speed subj to rut
ye alongside tej andthe dish
10 LSm height ofthe bay, With spi
the height may goupio2n. Testi
e day or night if managed eflecivey
and suc limits are compromised vith ves szean
‘The ships shal be berthed nonal wih ess
mtofany emerzency
Policies and standards need ake sare ps
and unloaded in por
out othe consumer,
so sessment Sai
ptm ston
ity of equipment and operon iam,
tee eeted
Sooo
as
_—
‘Scanned by CamScannerHocation of the facies at
configuration with view wo
aod aa
‘Scanned by CamScannerwi speed and diction ye
ca data inchlingcononecio
boi charts
pan bes
contour nap
evel nthe area nd worst Manaus
being srtem vith apy of water supply and keen expan
ites supply sours and ono ay
: point Gas x pint
: inter distances betwee fais nae
conto spo
al pontand ete dispose
oalstomain Terminale
ing sks
and the proximity ofthe Apts
of Blocks/ Facies sociated with regs emi
to points indicated in OISD-STD-118. ss aplae
(potential pil ofLNGecaher haar gi pes
storage a jety areal bese
eninal may const the flowing bic
consisting of pumping an vast
|
‘Scanned by CamScannerand the moore ships shai
may ead the berths nor
tothe ship,
aspassibeotheuneating
asses and provision o spas:
0A non Ser
equipment spacing Table 2 of O'SD-STD.8 as
sl flowed,
ntand other sources gto sale oc
any impounding exorcise.
be consructed as er OISD:STD-1b
distance of 0m shal be maitsined oss NG
vessel being loaded oruncaded tes
sanavigable waters. Theleasng or uns
at east im from ssh bride
refrigerant oan snd urcaing cmon»
from uncontoled sauces fist p=
onl mem anime as
to srtures or equipment dey ssi
‘Scanned by CamScannerSoe et assay
a ABOU 161°C. LNG any itedofa tank witange insane
toes Sine Containment tn sunoanalon ss
mi ty abn a
igure-10.13) The outer wall san she
storage systems inferior wipes
mands nt dsigno cobain secon
mite ines contains :
containment tank salle sry nal
many leakage,
ment LNG storage tn is dsiznl sd insist
rand outer wall sal beeper cn
IG shred. The LNG soc sd yin be
outer tank sl be abe oie NG re
inner tink. Theoter anki esprekioa
event oli age tener ik Rel
“The outer tak i its mae of mea shal o
fouter tanks mde of prestressed conse
for withstanding temperature sl hos
ean sone mong ated
ec
ie
———
Scanned by CamScannerrested Concrete outer tank wit
dmentcanbewsed asthe seem lgttomune
eotinment ark Thesontinm ols ihepncse
has the added advantage of prtcon cnn
ran isles. Ith outer ak nado
ic gade. Wouter tanks mae of pre seed cmc
stall be suitable fr whstndngengcamueniydaenns Lo
es
aa
ame
ein
peer
Se
een
Sr ne
peste ee eres
is foe LNGswage
May esnial
‘Scanned by CamScannerNG Ansan Sew
sical devlopmentsn iss,
MING Cold Recovery
fl General LNG cold sovery yseminy he opti
erin. imsat ecoerinat une iepeetd
LNG wo asto se elec incl
(col sation pests wo ons macy
LNG isch he faction pes employee tex
ale fretios ik thane, PBs er LRG Tips
make we of pressing the LNGto pss a a
peor het fom inigsed power pln an the expe he
050 which inthe pipeline ssn sure
Coldis se iro condom anne yl
Some ofthe scm onrhs tan
pefutoneconematon BOG
gafindsi Mis
explant urbine ner and condenser colng
ave mensres ae dese low as an acai xe
ake the subject simple ioundesand In view of powing LNG
and plobal awareness aout cnety iin, isesental
rope energy balances worked out make we of Tilley
enc fr LNG.
ile designing LNG regis terminal combintonofthe above
ean be sed depending wpa the projec! jes.
"The figures wvkeout tte nds toa froma
out ina class ond may beak forrefrese
3.72 Measure needed to achieve optima cot of Reseieaton
cational LNG Regasifcation processes ger se 2
al heat souree, Heat usualy provided by wi aes
fi a
Scanned by CamScannerUNG Anan Sens
such a8 open rack seawater va
‘ombuntionvaporizers:imermoiiate Mudvayne
waermixumcranetrapaizen, 8°
To vaporize ne MSCID of LNG we seguir
ilo Br oe dy Ths can sapped
oman of mua zoe withthe heat ond
perature of 100.000 GPM of seawater by I$".
lage seawater fowatis neces to mectemvionnenn aes
‘Scrathexings themiron nen
sn consumption and LNG shrinkage Hosen
{Sawa prizes the seawater pumps, andthe scans
ae water ne
the concept het required treason
rede
appreciate the concep
OfLNG (@)161"C to + 25°C) is 200,000 Kea.
The new LNG Regasifcation paces
process wihapowerplamionesnes esac be veprizaion
‘ces oovingeasng mtr
1 Bower generation with LNG lized a working i
[SEES ecient
Fale 3, thane and propane pass.
pt)-THeLNG poker cjcle pun rms
DB piestaterexchanzerusing weet rom the power
fat Alycot water eat mdiomistselotanserbst tse
I poer bock and the LNG Repasicon iy
Uris oret heat exchange system oles he LNG ost
Mpetexchange with he power lock back hen source cane
Hnigheattanster id when th pow lantisotin oper. Po
Ipekrp heat sources include aire or dct ingen te waste
eat recover nis
MThe hot LNG vapors thea expanded expan
over The low temperate ofthe LNG wring fd acres oe
rien we podem frmth power ants how evel wea
Thon a steam yee reciely hiss the rnsnto press LNG
arora th send ca press barony ia mst he
Pipe ine sstem
“Approximately 27.6 MW was
‘he high pressure, hghtemperue LN
the demethaniser, Approve of ofl
Teste as compressor comes be deme
Mp Berto teppei pressure of 90 Bae. TREN
donry was avaiable rinteratonle oo
{Grape emsesniti
is power ware 7
nr
exper ut
Sak mp
siavabess
102.7.23.21NG cold tization
LNG power exele, the LNG is ao we
power generation =TC
‘Scanned by CamScannerLNG coolsalyelater lion nexchngr'o ois shiny
10.9 poses fow der
ai tempeatre on owe escstn ory
Jel power Plant. Gas rine sr
ower generation capacity due ochonss
ning nen ss
expercne piper pu when
Inman cases op in power sng
peaks arcane sold fora prem
cooing ower output and gency
{optimum eves todo hese
pln eno
eanalsobe sed rede the poser
Thiswlllower he sean
and poi lower conics
mot power ou
1ademetanser than capbleo
nd over ME ofthe than a
to meet a wide range of
La Annan Sra
12.33 Tratkonletods VS newness (sittin
cold mh :
Se ins and talline ofan inet
Cae asin pws in wihacompes hi eles
ae sur pentane ron ert INGE
Sty mes cater for epson
a ee tmemis ete the egal.
A om he pean LNG Reason,
Fee 000, GPM seater te andthe seawater
sa Mem ites reured ty conventional
Season cn ect
setiavesn the rion of 32 MW of powerseguiedby the
Tctrpumpe However te power ees LNO pumps forthe
‘Septal testzytgher Ths soto beet power
ommedy the LNG poverecie pmn
‘Menage petition on SL NG expander ple ferrie
"Poampresim LSM nny enone ty
TEAM wie te mcpaeoity pret 31
on ofLNG ar power pata nk inner iy
rmpacton power gern The eeu ha al
atone emt iy SMW.
npn power of 670”
Tern efor be inept cscs 227i!
9524 BrukiWi ore omnes ai