You are on page 1of 2

Reservoir sediment management

Reservoir drawdown routing or sluicing

• As soon as the reservoir is


drawn down for sluicing,
the suspended sediment
concentration in the river
at the intake increases by a
factor of 1000.

• Sedimentation basins are


used during the drawdown
period to reduce sand
concentration delivered to
turbines.

Courtesey: Gregory Morris


23
Reservoir sediment management
Reservoir drawdown flushing
• Requires complete shut down of the plant to flush the sediments from the bottom level outlets

Courtesey: Gregory Morris


24

You might also like