You are on page 1of 52
VPLEX VS6 FRU Replacements re a Support Conte Esso Sets Welcome to VPLEX VS6 FRU Replacements. Copyright ©2018 EMC Corporation ll hghts Reserved. publish inthe USA. EMC balleyes the Information in this publeaton Ie accurate ae ofits publication date. The information's subject to change without nace. THE INFORMATION IN THIS PUBLICATION IS PROVIDED “AS IS.” EMC CORPORATION MAKES NO REPRESENTATIONS OR WARRANTIES OF ANY KIND Jaffe RESPECT TO THe INFORMATION IN THIS PUBLICATION, AND SPECIFICALLY DISCLAIMS INPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Use, copying, and distribtion of any EMC sofware descibed inthis publication requles an applicable software leense. The trademarks ages, and fenice mara (cllectvaly'Trademaris") sppearng inthis publication are the property ot EM Corporation and other parties. Nothing contained inthis Dubliation should be construed as ranting any license or right to use any Trademark without the prior witien permission of the Party that owns the Trademark. ENC, ENCE, the EMC logo, AccessAnywhere Access Loghx,AdvantEdge, AlphaStor, ApeSync ApelicationXtender, Achivextender, atmos, authentic, Authertle Problems, automated Resource Manager, Autostart, avtoswap, AVALOWGm, Avamat, Aveksa, Bus-Tech, captva, Catalog solution, C-ci, Celera, Calere Replicator, Centers, Centerstage, Canesten EMC Cerlradker ClO Cannes, Caimpack, Claimatcitor Caralart cuARWON, Cientah, Cloudiray, Codebook correlation Techncloay, Common information Mode, Compuset, Compute Anywhere, CorfguratienIntligenee, Coniguresc, CConnectix, Constellation Computing, Conrb, ENC ContrelCenter, CopyCress, CopyPoint, CX, DataBdge , Data brotection Suite Data Brotection Advisor [Declassty, DD Boost, Dante, Datadasextender, Data Domain, Direct Mar’ Architecture, Disixtender, DksKxtender 2000, DLS ECO, Document Scences, Documentum, OR anvewhere, DSSD, ECS, elnput, E-Lab,Eastc loud Storage, Emallxaminer, Emaintender, EMC Certera, EMC Controlcenter, ENC Lifeline, EMT, engin uly, €PrM.cRoom, vent explorer, FAST, FarPaint.FrstPass, FLARE, Forma, Geosynchrony, Global ie Vtualizaton, Graphic Visualization, Greenglum, hightoad, WomeBase, Uluminator, Infotechive, Infolove,Infescape, ina, Ingutecee,Ingueacce Express, Invst, Tek Ison, 115 Kazeon, EMC Lifeline, Mainframe Appliance for Storage, Mainframe Data Library, Max Retriever, cx, Mediastor Metro, MetroPeit, irorview, Mozy, Null-Band Deduplcation Naviphere, Nestorage, Netiitness, Networker, EMC Oncourse, OnRack, Openscale Petrodoud, PATO, Powerinks PowerPath, Powersnap,Prosphere, batectEverywher, brotecPaint, EMC Proven, EMC Proven bréfessional QuickSCan, RAPIDPath, EMC Recoverrsne, Raitt, Repicare, Replistr,ResoUrcePal, Retrospect, Rok, the RSA logo, Safeline, SAN Adsor, SAN Copy, SA Manager, ScalslO ‘Smarts, silver Tall Ec Snap, snapimage, Snapsure, Snapview, sourceone, SRDF, EMC Storage Administer, Storagescope, Supoartlate,SYMMAPL, Symmnabler,Symmetix, Syenmetiic OMX, Symmetrix VMAX, TimeFinger, Twinstrate, UitraFex, UltrePamne, Utrascale, Unisphere, Universal Dats Consistency, Ublock, VCE, Velocity, Viewlets, VIR, Virtual Mati, Virtual Hatrix Architecture, Vital Provisioning, Vitalze Everything, Compromise Nothing, vrtuent, Vax, VtaKe, Vs, VNXE, Voyence, VPLEX, VSAM-Assst, VSAM 1/0 PLUS, VSET, VSPEX, Watch, WeDXTeNdR, XPress, TESS, levem “arameacha, eremsr xtemsw, XremIO, Yotavorta, Zarosfrcion Enterprise Stora0e Copyright 2016 EMC Corporation. al rights reserved. \VPLEX VS6 Field Replaceable Units (FRUs) 1 Course Overview This course describes how to replace VPLEX VS6 Field Replaceable Units (FRUs). Derr) | Procedures are used to guide you through the steps along with videos showing the actual replacement of the units. ‘This course is intended for those having experience with previous VPLEX cluster and FRU procedures and who are responsible for replacement tasks. Upon completion of this course, you should be able to: + List preliminary FRU replacement activities and information for the VPLEX VS6 + Replace faulted FRUs using the replacement procedures Cl retad This course covers how to replace VPLEX VS6 Field Replaceable Units (FRUs). Procedures are used to guide you through the steps along with videos showing the actual replacement of the units. Ccopyrght 2016 EMC Corporation ll hts reserved. VPLEX VS6 Field Replaceable Units (FRUs) 2 Module: Preliminary FRU Replacement Information Upon completion of this module, you should be able to: » Explain when to use FRU replacement procedures for configured or un-configured VPLEX Clusters » List the needed service software tools » Describe the use of SSH and Web server connections during the FRU replacement » List the scripted and manual FRU procedures and which FRUs are monitored This module focuses on covering the preliminary FRU replacement information such as needed service software tools, the use of SSH and web server information. It will list the scripted and manual FRU procedures. © Corporation. ll rights reserved \VPLEX VS6 Field Replaceable Units (FRUs) 3 VPLEX VS6 FRU Replacement » SolVe Desktop » FRU Replacement Procedures — CLI-guided/scripted ~— Manual — Configured > after EZ-Setup — Un-configured > before EZ-setup PLEX VS6 VPLEX VS6: Engines Cluster The latest VPLEX VS6 FRU procedures are always available in SolVe Desktop. There are CLI-guided and scripted procedures that guide you through replacements step by step including gathering health check and diagnostics information. The FRU replacements are typically started with the command VPlexadmin replace-fru and then select the faulted FRU from the replacement menu. On the other hand, there are some manual replacement procedures. No script guides you through the needed steps. The FRU manual lists all the steps which need to be executed manually. This manual process starts with disabling the call-home, gathering health information, and verifying the faulted unit for replacement. Another important area for FRU replacements is to know if the procedure is performed on an un-configured VPLEX VS6 Cluster, which means the configuration commands for EZ Setup have not been run. An example could be that a faulted Management Module Control Station (MMCS) failed the EZ-Setup and it was determined to replace this MMCS. In this case the replacement procedure for an un-configured MMCS should be used. However, if an MMCS fails in a successfully configured VPLEX VS6 Cluster then the replacement procedure for a configured MMCS needs to be used. Copyright 2016 EMC Corporation. al rights reserved. \VPLEX VS6 Field Replaceable Units (FRUs) 4 Laptop Tray, Service Laptop Software » Laptop tray at U20 location in EMC cabinet » Red Ethernet service cable — MMCS-A service port £ Ge The EMC VPLEX VS6 cabinet has a laptop tray in the front at the U20 location. The red Ethernet service cable connected to MMCS-A should be available to connect to the service laptop. The service laptop needs PUTTY version 0.60 or later for SSH connections, WinSCP or a similar tool for copying files to the VPLEX management module control stations, and a web browser and Flash Player version 10.0.0 or higher for the VPLEX GUI poration. ved. \VPLEX VS6 Field Replaceable Units (FRUs) PuTTY Configuration for Service Port When connected to the red Ethernet service cable, the laptop should automatically get an IP address from the DHCP server running on the MMCS. Use an SSH tool like PUTTY and configure it to the service IP address 128.221.252.2 with the default port 22 for the connection type SSH. You can then save the session and open the session to the MMCS-A. Copyright 2016 EMC Corporation. all rights reserved. PLEX VS6 Field Replaceable Units (FRUs) 6 Web Server Connection - Illustrations pcs in PUTTY You can also connect to the same service port IP address 128.221.252.2 with a browser using HTTP. In the FRU replacement screen, the commands are listed to start the scripted FRU replacement procedure. After you have logged into the MMCS-A and connected to the VPlexeli using SSH, you execute these commands. While going through the FRU Replacement script, there are entries for illustrations in the GUL. They can help with an easier selection and show how to remove and replace a FRU through illustrations. copyright 2016 &? ‘eeporation ll thts reserve. VPLEX VS6 Field Replaceable Units (FRUs) 7 Faulted Parts in the VPLEX VS6 » Call-home information alae » Support center information » CLI command output — VPlexcli context — Health check » Unisphere for VPLEX » Results of troubleshooting Pe i.e. performance i i t eens | | Ei With the VS6 the call-home feature should be used. A warning message is generated if a FRU is degraded. If a FRU is faulted, an error message is sent. The information in the call-home messages and the information gathered through troubleshooting come from the EMC support center and generate service calls. VPlexcli context information and health check commands can also be used to detect and verify faulted FRUs. In Unisphere for VPLEX, certain failures are displayed under the Monitoring tab in System Health. Service tasks can also be generated out of troubleshooting an issue. Some FRUs might not generate call homes or unique warning or error messaging. Performance issues can be one of the symptoms. Replacing an SFP or I/O Module might be a direct result from troubleshooting @ customer SR. Ccopyrght 2016 EMC Corporation ll hts reserved. \VPLEX VS6 Field Replaceable Units (FRUs) 8 Identifying FRUs in the VPLEX VS6 » Compare with support center message mm MC + Summary output in CLI-guided procedures 2.75" Sr sem When the faulted unit is selected in the replacement menu, a summary is displayed and should be checked against the FRU replacement call-home or service center information. Serial and part numbers can easily be found on the faulted unit. First we see pull-out tags for the engine chassis and the BBUs. Each fan module has its serial number and part number in the front. The management as well as the 1/O modules have their serial and part number on the handle. The pull-out tag with serial and part number is from an InfiniBand switch. Other FRU components also have the S/N and part number easily available. Copyright 2018 EMC Corporation. All rights reserved \VPLEX VS6 Field Replaceable Units (FRUs) 9 In the scripted procedures, VPLEX VS6 uses amber marker LEDs for engine, director, and unit to physically identifying the selected or faulted FRU to avoid errors. Here the engine marker and director marker can be seen. During a FRU replacement for a PSU, for example, the script also marks the PSU that was chosen in the menu and needs replacement. Another example for the use of amber marker LEDs is with a director fan. Fan replacements are a manual procedure, not script driven. The amber LED used for a faulted fan is enabled when the fault occurs and not activated with a replacement script. poration. all tghts reserved. \VPLEX VS6 Field Replaceable Units (FRUs) 10 Director DIMM. Director BBU Director Fan Director SSD Director Psu Base Module FC I/O Module IB I/0 Module MMCS A or B MMCS A and B MGMT Module No How VPLEX VS6 FRUs are Covered Coos Cees FRU part Poe] Reena inn Yes Yes manual Yes Yes Yes Yes Yes manual Yes Yes Yes Yes Yes Yes Yes Yes Yes This table of VPLEX VS6 FRUs shows which FRU is covered by a scripted, CLI-guided procedure, as well as which FRU has a procedure when the cluster has not yet been configured with €Z-Setup. Most of the FRUs are monitored and trigger a call-home. Some might not directly call home but can be identified through performance issues. copyright 2016 &? ation. all tghts reserved, \VPLEX VS6 Field Replaceable Units (FRUs) iL How VPLEX VS6 FRUs are Covered (cont.) aS Procedure for | Monitored, cord Peursem et “ aa Me ea ery 1B Switch No ~ manual ups No ~ manual Yes Engine Chassis No ~ manual Yes Yes cables No ~ manual SFP No ~ manual Yes IB switches are not directly monitored, but in case of failure it will show in the internal communication statistic and IB-group presence. Other failures will show, for example, through performance statistics or temperature warnings! r All FRU replacements in this table follow manual steps. As an example, IB switches are not directly monitored, but in case of a failure, this will show up in the internal communication statistic and IB-group presence. VPLEX monitors which constantly monitor software status, IO status, and hardware status, should detect the faulted IB connectivity. Copyright 2016 EMC Corporation. all rights reserved. \VPLEX VS6 Field Replaceable Units (FRUs) 12 Module: Replacing the Faulted FRUs Upon completion of this module, you should be able to: « List the Field Replaceable Units for the VPLEX VS6 » Know how to access the FRUs » Perform the FRU procedures for the VPLEX VS6 » Execute CLI context commands for detailed unit information This module focuses on the replacement of FRUs in the VPLEX VS6. Upon completion of this module you should be able to list all the VPLEX VS6 FRUs and perform their replacements. Copyright 2016 EMC Corporation. al rights reserved. \VPLEX VS6 Field Replaceable Units (FRUs) 13 VPLEX VS6 - Field Replaceable Units Pe maruld DIMM module Battery Backup Power Supply Unit Management Engine Chassis * Unit (BBU) (Psu) ‘Module (tm) Solid State Drive Fen. Base Module MMCS A or BY ups (SSD) * Director * FC 1/0 Module MMCS A and B Cables InfiniBand 1/0 MRI21 Cable Module SFP InfiniBand Switch * These FRUs have procedures for Configured state (after the EZ-Setup utility has KE successfully created the VPLEX cluster) and for Unconfigured state replacements (before the EZ-setup was run). This is a list of all the FRUs in the VPLEX VSG. All these FRUs have replacement procedures that must be followed when a replacement is needed. Perform this procedure only after a VPLEX cluster has been configured for operation by running the EZ-Setup utility. Do not run the procedure on a new cluster that has not yet been configured. FRUs listed here with an asterisk also have a procedure when the VPLEX cluster has not been configured. Make sure you use the correct replacement procedure. Copyright 2016 EMC Corporation. All rights reserved, \VPLEX VS6 Field Replaceable Units (FRUs) 14 DIMM (Memory Module) Director B oe DIMM module Solid State Drive (SSD) * Director * gs Click the Launch button to view the replacement demonstration. Replacing a DIMM or memory module is completed from the front. You need to identify the engine, director, and the location of the faulted DIMM. The top view of the director shows four banks of DIMMs. Each bank has a total of 2 DIMMs, eight DIMMs per director in specific locations. Click the Launch button to view the DIMM replacement demonstration. Copyright 2016 EMC Corporation. al rights reserved. \VPLEX VS6 Field Replaceable Units (FRUs) 15 DIMM - CLI Context vplexcii:/>[1s Jengines /engine-i-i /airectore/director-i--A/hardware/dinns Jengines /engine-1-1/directors/director=1-1-/hardware/dinns : Ginm-RO dinm-A12 dimm-A1S dinm-AL8 dimm-A21 dimm-A3 dinm-A6 dinm-Ad eLexcns:/> [Te Tangles Tg Ine i aI FeGEats /ATEectar-i-1"h hardware /almas7™ ote/dixector-1-1-A/harduare/dinne[SEEORO) Jengines /engine-1-1/dire Nan value operaticnal-status online part-number 100- 103-00 sezial-number BOADOLL40aL01B9267 (atruncates..) r ‘Two commands in the CLI context for DIMMs are shown here. The output of the first command displays the names of the DIMMs which also represent their location in the DIMM banks. The output of the second command shows the details per DIMM, its operational status, part and serial number. Copyright 2016 EMC Corporation. All rights reserved, \VPLEX VSG Field Replaceable Units (FRUs) 16 Solid State Drive SAT a DIMM module Solid State Drive (SSD) * Director * Click the Launch button to view the replacement demonstration. Replacing the director Solid State Drive (SSD) is completed from the front. You need to identify the engine and director. ‘The top view of the director shows the location of the SSD. The director supports the M.2 SSD - SMART Modular Technologies - with 60 mm in length. The thumb screw assembly holds the SSD in place. Click the Launch button to view the SSD replacement demonstration. Copyright 2018 EMC Corporation. All rights reserved \VPLEX VS6 Field Replaceable Units (FRUs) 17 Director SSD - CLI Context vbiexclis/> 11 fengines/engine-1-1/directors/director-1-1-A/hardware/internal-disks/* engines /engine-1-1/directors/director-1-1-A/hardware/internal-diaks /internal-diek-at Hane value SperatYonsisstatie SATine part-nunber 118-000: al-mumbe: The command for the SSD in the VPlexcli context is shown here. The output lists the Solid State Drive (SSD) status, part number, and serial number. Copyright 2018 EMC Corporation. All rights reserved \VPLEX VS6 Field Replaceable Units (FRUs) 18. Director Director B DIMM module Solid State Drive (SSD) * Director * Engine Front Director A ire Click the Launch button to view the replacement demonstration. The director chassis itself is a FRU. The director replacement chassis needs to be populated with the SSD, DIMM, BBUs, and Fans of the faulted director. The director FRU has two replacement procedures for the configured and un-configured state of the VPLEX cluster (after and before EZ-Setup). The difference between these procedures might only be very small but it is extremely important to use the correct procedure. In this demonstration the procedure for the configured director replacement is followed. Click the Launch button to view the director replacement demonstration. Copyright 2016 EMC Corporation. al rights reserved. \VPLEX VS6 Field Replaceable Units (FRUs) 19. Director - CLI Context Jongines/ongine-1-1/directars/director: Abtrabut Nane | value descriptor - hostaane 128.221.252.35 port 5088 sml-trace-enabled_ false ports velexcli:/> 1 /engines/engine-1-1/directors/director~i-1-a/hardware -1-A/hardware A command for a director in the VPlexcli context is shown here. The output shows director attributes and director contexts - dimms, fan-modules, internal-disks, io-modules, ports, and sfps. \VPLEX VS6 Field Replaceable Units (FRUs) 20 Battery Backup Unit (BBU) Crean ave } Battery Backup a Unit (BBU) aes Fan. A Director A Click the Launch button to view the replacement demonstration. Also serviced from the front of the VPLEX are the Battery Backup Units (BBU). Each engine has four: AO, Ai, BO, and Bi. The replacement script will mark the engine. The faulted BBU needs to be identified. Make sure you use the labeling on the engine chassis for selecting the right one. Click the Launch button to view the BBU replacement demonstration. Copyright 2016 EMC Corporation. al rights reserved. PLEX VS6 Field Replaceable Units (FRUs) 21 Battery Backup Unit (BBU) - CLI Context /engines/engine-1~1/battery-backup-unit vPlexeli:/>| vplezcli:/> [IL Jengines /engine-I-i/bateary backup unita/> /engines/engine-I-1/babtery-backup-unite/battory-Dackup-unit-A0: Nam: value battery-fully-charged true battery-test-result passed battery-time-ranaining 65535 temily-tru-id 0x0015000e marker-led oft on-battery false operational-status online part-nunber 078-000-123-04 revicion-nunber FFF serial-nunber ACPH3150500475, jntruncated.) tery-backup-nit-BO battery-backop-un r Two commands for the BBUs in the VPlexcli context are shown here. BBUs are in the engine context. The second command displays details of all the BBUs in one engine including battery charge and test, operational status, part and serial numbers. Copyright 2016 EMC Corporation. all rights reserved. \VPLEX VS6 Field Replaceable Units (FRUs) 22 Director Fan Module . aes ~ Battery Backup ‘Unit (BBU) Tari Director A Click the Launch button to view the replacement demonstration Fan modules are serviced from the front. Each director has six fans named AO to AS respectively and BO to BS. Labels on the engine chassis show the locations If one fan needs to be replaced the director is still up and running. If a second fan on the same director fails or is pulled out, the director shuts down. The fan replacement is a manual procedure. Click the Launch button to view the director fan replacement demonstration. \VPLEX VS6 Field Replaceable Units (FRUs) 23 Fan Modules - CLI Context veLexclit/> inlet—fan-faulted marker-led operational-status cutlet-fan-faulted (ateuneated.) /engines /engine-1-1/directore/director~ fen-nodule-A fan-module-Al fan-module-A2 fan-module-A2 fan-moduls-24 fan-module. Jongines/engine-1-1/directors /director-1. Name value false ott online tales -A/hardware/fan-medules: velexcli:/> [1 /engines/engine-1-1 /director/director-i-1-A/hardware/fan-odules/* -A/hardware/fan-nodules [Fan=modale-NO: ‘Two commands for the Fan modules in the VPlexcli context are shown here. Fans are in the director/hardware context. The details for each fan include Fan status, marker LED, and operational status. Copyright 2016 EMC Corporation. all rights reserved. \VPLEX VS6 Field Replaceable Units (FRUs) 24 Power Supply Unit (PSU) Director B Power Supply Unit (Psu) Base Module FC 1/0 Module InfiniBand 1/0 Module SFP Director A InfiniBand Switch Su corr Click the Launch button to view the replacement demonstration. MC ate Power Supply Units (PSU) are serviced from the rear. Each engine has four PSUs named AO, Al and respectively BO, B1. Labels on the engine chassis show the locations. If one PSU needs to be replaced the director is still up and running. Click the Launch button to view the PSU replacement demonstration. Copyright 2016 EMC Corporation. All rights reserved, \VPLEX VS6 Field Replaceable Units (FRUs) 25 Power Supply Unit - CLI Context cli: /> [I3 Jengines/engine-1-i/power-suppiles/ /engines/engine-1~1/power~supplies: power-supply-a0 power-supply-al power-supr ve. 0 power-supply-bL velexcit:/> [fe Jengines/engine-i-i/power-supplies/; /engines/engine-1-1/power-supp! ies [BBWe==RaRBIF=a0F) x value narker-Lea a on false operational-status online part-number 071-000-620. revision-number PFE serial-nusber FPSAHL53600170 temperature-threshold-exceeded false (truncated r ‘Two commands for the PSUs in the VPlexcli context are shown here. PSUs are listed in the engine context. The details for each PSU include marker LED status, operational status, part and serial numbers. Copyright 2016 EMC Corporation. All rights reserved, \VPLEX VSG Field Replaceable Units (FRUs) 26. Base Module Director B Power Supply Unit (su) Base Module FC 1/0 Module InfiniBand 1/0 Module SFP InfiniBand Switch Su corr Click the Launch button to view the replacement demonstration. MC ate The Base Modules (BM) are serviced from the rear. There are two de-populated BMs in an engine. The Base Module replacement is a manual procedure. Click the Launch button to view the base module replacement demonstration. Ccopyrght 2016 EMC Corporation ll hts reserved. VPLEX VS6 Field Replaceable Units (FRUs) 27 Fibre Channel I/O Module Director B Power Supply Unit (Psu) Base Module en FC 1/0 Module InfiniBand 1/0 Module SFP InfiniBand Switch Su Director A Click the Launch button to view the replacement demonstration. MC There are three Fibre Channel I/O Modules in each director for Front End, Back End, and WAN connectivity named AO, Al, A2 and respectively BO, B1, and 82. Replacement FC I/O modules come without the SFPs. SFPs are swapped from the faulted FC 1/0 module to the replacement module. Click the Launch button to view an FC I/O module replacement demonstration. PLEX VS6 Field Replaceable Units (FRUs) 28 FC I/O Modules - CLI Context vplexcti: /»[is Jengines/engine-i-i/directors/director-i-i-A/hardware/Lo-modules Jengines /englat-1- 1/airectors/aibactor TT -B/haedvare/ie modules AOA AZ Ad narker-led off operational-status online part-nunber 303-923-000A-02, revision-number FFF serial-nunher ce2enisoso0034 elot~nunber ° type #ibre-channel eeuncated..) ‘Two commands for displaying 1/0 modules in the VPlexcli context are shown here. 1/0 modules are listed in the director/hardware context. A director has three FC I/O modules and one InfiniBand 1/0 module (A3 or respectively B3). The details for the FC I/O modules include marker LED, operational status, part and serial numbers, and type. Copyright 2016 EMC Corporation. All rights reserved, \VPLEX VSG Field Replaceable Units (FRUs) 29 InfiniBand I/O Module Director B Power Supply Unit (Psu) ° Base Module ae FC 1/0 Module InfiniBand 1/0 Module SFP InfiniBand Switch Director A Click the Launch button to view the replacement demonstration. MC There is one two-port InfiniBand I/O Module in each director for intra-cluster communication, named A3 and respectively B3. In a single-engine VPLEX cluster the two ports of one director are connected directly to the other director. In a dual- or quad-engine VPLEX cluster, all InfiniBand ports are connected to the InfiniBand switches. Click the Launch button to view the InfiniBand I/O module replacement demonstration. Ccopyrght 2016 EMC Corporation ll hts reserved. VPLEX VS6 Field Replaceable Units (FRUs) 30 InfiniBand I/O Modules - CLI Context vplexcti: /» [is Jengines/engine-i-i/directors/director-i-i-A/hardware/lo-modules/ Jengines /englat-1- 1/airectors/aibactor TTB) haedvare/ie modules AOA AZ Ad is-present narker-led ott operational-status online part-nunber 303-319-000A-07 Fevieson-number FFF serial-nunbex cF2BK152000022 Slot-nunber type Two commands for displaying 1/0 modules in the VPlexcli context are shown here. 1/0 modules are listed in the director/hardware context. A director has one InfiniBand I/O module, A3 or respectively B3. The details for the InfiniBand 1/O modules include marker LED, operational status, part and serial numbers, slot number and type. Copyright 2016 EMC Corporation. All rights reserved, \VPLEX VSG Field Replaceable Units (FRUs) 31 Small Form-Factor Pluggable Transceiver Director B (ene Unit Base Module FC 1/0 Module InfiniBand 1/0 Module Su SFP Director A InfiniBand Switch Click the Launch button to view the replacement demonstration. The FC I/O modules have SFPs in each port for the 16 Gb connectivity. The SFP replacement is a manual procedure. Click the Launch button to view an SFP replacement demonstration. Ccopyrght 2016 EMC Corporation ll hts reserved. VPLEX VS6 Field Replaceable Units (FRUs) 32 SFPs - CLI Context Babe 600 oar vplexelit/> 11 /engines/engine-1-1/directors/director-1-1-A/narduare/sfpe Jengines/engine-1-1/directore/director-1-1-A/nardw: Name Manufacturer PartHunber s/n AO-ECOO FINISAR FTLEGSZ9P20NV-ES VPHOLAX coRP. RO-FCOL FINISAR PTLESS29P3ENV-ES UPAOAWL conP. RO-FCO2 FINISAR FTLESS29P2ENV-ES ugLOIG RO-FcO2 FINTEAR PILESS29P3ENV-ES UPROE3Q core. 1-FC00 FINTEAR FILESS29P2ENV-E5 UPCOHU AI-ECOl FINTSAR PTLESS29PSENV-E5 UPPOBDG ORP. (truncated. Jstps: ower [ull] TxPower[u#] Temp Ic son 50 538 st sa7 st 529 0 585, 48 506 34 A command for the SFP information in the VPlexcli context is shown here. SFPs are in the director/hardware context. The details for each SFP include part number, serial number, rx- power, tx-power, and temperature. Values for current-rx-power and current-tx-power should not be less than 100. Power values lower than 100 generate a call home event. \VPLEX VS6 Field Replaceable Units (FRUs) 33 InfiniBand Switch Water icra Power Supply Unit (Psu) Base Module FC 1/0 Module InfiniBand 1/0 Module SFP InfiniBand Switch Click the Launch button to view the replacement demenstration. InfiniBand switches are serviced from the rear. They are part of the configuration in dual- and quad-engine VPLEX clusters and connect the intra-cluster communication redundantly. Each switch and one InfiniBand port of each director is part of an IB group. With one InfiniBand switch failure, the intra-cluster communication between the directors is still possible and VPLEX operations are still online. The InfiniBand switch replacement is 2 manual procedure. Click the Launch button to view the I8 switch replacement demonstration. PLEX VS6 Field Replaceable Units (FRUs) 34 Management Module Ss MGMTB i y MCS A or 8 * | HIMES A and 8 MRa24 Cable MGMT A Click the Launch button to view the replacement demenstration. In multi-engine VPLEX clusters engine 2, 3, and 4 have two Management Modules (MM), one per director. They are referenced to as mgmt-module-a and mgmt-module-b The management module provides Ethernet management network connectivity for the cluster as well as serial and USB connection to each of the directors. Click the Launch button to view the management module replacement demonstration. Ccopyrght 2016 EMC Corporation ll hts reserved. VPLEX VS6 Field Replaceable Units (FRUs) 35. Management Module (MM) - CLI Context (Engine 2,3, and 4) vpiexcti:/> [1s Jengines/engine-i-2/agnt-nodules/ /engines /engine- gat-module-a mg 2/mgme-modales odule=b Nane value eerial-nunber Powe truncated.) Two commands for the mgmt-modules in the VPlexcli context are shown here. The Management Modules (MM) as well as the Management Module Control Stations (MMCS) are in the same engine context. They are both referenced to as mgmt-modules, here mgmt-module-a and mgmt- module-b. The details for the management module A in engine 2 include the module type, here ‘management-module’ , the operational status, the part number (different from the MMCS), and serial number. Copyright 2018 EMC Corporation. All rights reserved \VPLEX VS6 Field Replaceable Units (FRUs) 36 Management Module Control Station |_Management_| mm | MNCS Aor 8 * MNCS A and B MRa21 Cable Click the Launch button to view the replacement demonstration. MC ‘Two Management Module Control Stations (MMCSs) are in the base engine 1 of the VPLEX cluster. There is an MMCS-A and an MMCS-B. A service person typically connects to MMCS- A for any replacement procedures. However, if the MMCS-A needs to be serviced and no service port connection to MMCS-A is possible, MMCS-B is partially used for the replacement. The MMCS modules also provide Ethernet management network connectivity for the cluster. In the replacement video we will follow the VPLEX MMCS configured procedure, but remember there is also an MMCS replacement procedure for an un-configured VPLEX cluster. Click the Launch button to view the MMCS-A replacement demonstration. Ccopyrght 2016 EMC Corporation ll hts reserved. VPLEX VS6 Field Replaceable Units (FRUs) 37 Management Module Control Station - CLI Context Engine 1) velexcli: /> [fs Jengines/engine-1-1/agat-nodules fengines/engine=1-1/mgnt-modules: mgnt-module-a ngmt-nedule-b velexcli:/>[ia Jengines/ vmodules/* fengines /engine-1-1/mgmt-nodulesfmgmt-module-a: | Name revision-muiber serial-nunber FCNNCI52500526 Two commands for the MMCS in the VPlexcli context are shown here. MMCS and MM (Management Module) are in the same engine context. eeuncated..) They are both referenced to 2s mgmt-modules, here mgmt-module-a and mgmt- module-b. The details for the MMCS include the module type, here mmes, the operational status, the part number (different from the MM), and serial number. copyright 2016 &? ration. All fights reserve. VPLEX VS6 Field Replaceable Units (FRUs) 38 Management Module Control Station |_Management_| mm | MNCS A or 8 * MNCS A and B | MRa24 Cable dar Both, MMICS-A and MMCS-B, need (He to be replacea! Click the Launch button to view the replacement demonstration. MC In this FRU replacement scenario both management module control stations need to be replaced. A possible scenario could be that it was determined that internal network issues resulted from two faulty MMCSs. The MMCS modules provide Ethernet management network connectivity for the cluster. The Dual MMCS replacement sequence will first replace MMCS-B, then replace, re-image and restore MMCS-A. The factory image on MMCS-B is used to re-image MMCS-A to the cluster version. After a successfully completed replacement of MMCS-A, MMCS-B is re- image and restored. Click the Launch button to view the dual MMCS replacement demonstration. Ccopyrght 2016 EMC Corporation ll hts reserved. VPLEX VS6 Field Replaceable Units (FRUs) 39. MRJ21 Cable Assembly Ean nn NCS A or 8 + MICS A and 8 nyra21 cable ‘lick to view interactive ‘demonstration Click the Launch button to view the replacement demonstration. One MRJ21 cable assembly is connected with its keyed connector to the MMCS-A, another ‘one to the MMCS-B. It provides connectivity to the customer management network (black cable), as well as the redundant internal management networks in dual and quad engine configurations. The lime-colored (A-side) cable is the .252 subnet within the VPLEX cluster. The purple- colored (B-side) cable is the .253 subnet. The MRI21 cable assembly replacement follows 2 manual procedure. For further Ethernet cabling in dual and quad engine VPLEX VS6 clusters view the provided cabling animation. Click the Launch button to view the MRJ21 cable assembly replacement demonstration. Ccopyrght 2016 EMC Corporation ll hts reserved. VPLEX VS6 Field Replaceable Units (FRUs) 40 Additional FRUs - Engine Chassis Era Engine Chassis * ups Cables Lift required to replace VS6 engine If an engine chassis replacement needs to be performed, the single engine VPLEX cluster would have a considerable data unavailability downtime. With dual and quad engine clusters, the replacement can be performed with continued production. There might be a reduction in performance. Shown is the engine chassis of the VPLEX VS6 - the replacement chassis would come without the disk fillers which also have to be moved from the faulted engine chassis to the replacement chassis, just like both directors with BBUs and director fans, and all the 1/0 modules and MMs or MMCSs. The engine chassis has a configured and un-configured procedure. A transport lift is needed because of the weight of the 4-U VS6 engine. poration. All ights reserved. \VPLEX VS6 Field Replaceable Units (FRUs) 41 ations {1 health-state ok marker-Led off operational-status online part-nunmber 100-565-139-03 revision-number Fi serial-nunber F2GR153200020 top-level-assembly _FwMO0153200209 wwo-ceed 4300036 r The command for displaying an engine in the VPlexcli context shows engine attributes and contexts. Listed are among others the attributes for ip-seed, enclosure-id, the engine family, part number and serial number. The VPlexcli context for the engine lists battery-backup-units, directors, fans, mgmt-modules, and power-supplies. Copyright 2016 EMC Corporation. all rights reserved. \VPLEX VS6 Field Replaceable Units (FRUs) 42 Additional FRUs - Uninterruptible Power Supply Era Engine Chassis * ups Cables MC The uninterruptible power supplies back up the InfiniBand switches. UPS-A backs up IB switch A while UPS-B backs up IB switch B. Just like the InfiniBand switches, UPS are only part of the VPLEX VS6 configurations in dual and quad engine clusters. The procedure follows manual steps. When replacing a faulty UPS, the other UPS and InfiniBand connections need to be functional. Commands that check these conditions are run during the procedure. After the replacement, the UPS status should be back to normal and the InfiniBand connections fully functional. Copyright 2018 EMC Corporation. All rights reserved \VPLEX VS6 Field Replaceable Units (FRUs) 43 Uninterruptible Power Supply - CLI Context vplexclit/> 1e /elusters/eluster-1/uninterruptible-power-supplies/ 1/uninterruptible-power-supplies: excli:/> 11 /elusters/cluster-1/uninterruptible posses pee /elusters /cluster-1/uninterruptible-power-suppliesPups: Name value battery-replacement=date 04/29/ battery: fully-charged battery-time-remaining — Smin operational-etacus online part-nunber 078000079 revieion-number FFF serial-nunber ENp00151800077 (clusters /cluster~1/uninterrupt ible-poxer-supplies[ipe-e-Pe) (truncated The commands for the UPS display the names, battery status, operational status, part and serial numbers. Copyright 2016 EMC Corporation. All rights reserved, \VPLEX VSG Field Replaceable Units (FRUs) 44 Additional FRUs — Cables (1 of 5) | cables | FC Com (WAN) Engine Chassis * UPS Serial ups Le. ‘AC Power Cables Ethernet InfiniBand \Velac:/ connect vada wan-com foperteroue20- EROR- Conmectvty eros were ound forthe folowing com aos Yengneslentine?1/4necton/Sretor?AIhaowee/pors/82 C00 tig connect to /engies/engine-1-1/Sretor decir 13-8/haronare/pre/82 #00 Jengneslenpne?3/Snectar/Seceor 2 ifporawere)pes)02 F200 ising comme to Jengnes/ongine 1 /Srecord decir 13. B/horeare/prte/82 £C00 Jngiesfosine22/Snectas/Snetor 31 Afha due jpat/AQECOD ining cometh to [enges/engine-1/drectord decir 1 Sihareware/prtft £00 engneslen pine 22/dnectors/deetor -1sMharévete/oos/824200 ein connectly to /engmes/enpe--1/Oretors acter 13-B/arcnare/prs/2 600 eines fo pine-2Pdnecxs/Uteior 12) /B2F200 Mining ll expeied cornet, foportgroup2 1 Of Aowpected conectstyis poset ze Gretel Pesca Click to view interactive ‘demonstration In VPLEX Metro configuration the FC Com cable is used for the WAN connectivity. The connectivity is setup in redundant FC port groups. The command connectivity validate-wan-com checks for WAN COM connectivity. If there are any connections missing, it will list the faulty connections. The FC port groups will only show PARTIAL connectivity. When the faulty FC WAN cable(s) is replaced, the two FC port groups should show their expected connectivity as FULL. Be aware that the output may not show missing connectivity if the failure is intermittent. For further cabling details use the provided cabling demonstration, Ccopyrght 2016 EMC Corporation ll hts reserved. VPLEX VS6 Field Replaceable Units (FRUs) 45. Additional FRUs — Cables (2 of 5) -time-remaining tional-status revieien-nunber serialnumber Com (WAN) Engine Chassis * UPS Seria ves AC Power Cables ethernet InfiniBand sorpiies/* Pec Click to view interactive ‘demonstration The UPS serial cables connect the UPS with the MM of the second engine. They are used to monitor the UPS. If a cable has faulted or is not connected, the command shown here will display the operational status of the UPS as being removed. No other information on the UPS is available. For this process it is important to locate the right UPS - the peer needs to be operational. Both UPSs and IB switches should be online again after the UPS replacement. For the cabling in dual and quad engine VPLEX VS6 clusters, view the provided cabling demonstration. Copyright 2018 EMC Corporation. All rights reserved \VPLEX VS6 Field Replaceable Units (FRUs) 46 Additional FRUs — Cables (3 of 5) | cables Er Cek to view interactive ‘demonstration AC power cables use the colors grey and black in the VPLEX VS6 cluster. Grey cables are used for the A-side connections, black cables for the B-side connections. There are three scenarios of possible AC power cable failures: first - the connection between the Power Distribution Unit (PDU) and the VPLEX PSUs; second - AC cables between the PDUs and UPSs; third - AC power cables between UPSs and InfiniBand switches. All cables should always be checked if they are seated completely and the bail is in place. Ifa cable needs to be replaced, follow the AC power cable manual replacement procedure. For the AC power cabling view the provided cabling demonstration. Ccopyrght 2016 EMC Corporation ll hts reserved. VPLEX VS6 Field Replaceable Units (FRUs) 47 Additional FRUs — Cables (4 of 5) | cables FC Com (WAN) Engine Chassis * UPS Serial ups > > ‘AC Power Cables ~ Ethernet InfiniBand ror issuing ping command for ip rror issuing ping command for ip Error igeuing ping command for ip IP interfaces : OF Discover Network Devices : ERROR Missing IP address of Directors : Nake eure TP ie configured on Dir Missing IF address of Directors : eruncated..) 1,253.37 1253.38 6 6 Grote Pec Click to view interactive ‘demonstration Use the shell command vPlexPlatfornHealthCheck. It pings all IP addresses in the cluster and identifies unreachable components as shown in this output example. The replacement manual has IP address tables for the dual and quad engine VPLEX cluster configurations to determine which internal cluster management cable needs to be replaced. Purple and lime cables are used in dual- and quad-engine VPLEX VS6 clusters. Use the provided cabling demonstration for more details. Copyright 2016 EMC Corporation. All rights reserved, \VPLEX VS6 Field Replaceable Units (FRUs) 48 Additional FRUs — Cables (5 of 5) | cables Er FC Com (WAN) Engine Chassis * UPS Serial ups AC Power: Cables Ethernet InfiniBand > connectivity validate-local-com -c cluster-1 2 FULL ib-port-g) ~ Ok - ALL expected connectivity is present. ib-port-group-3-1 - OK - All expected connectivity is present VPLEX VS6 Cabling Click to view interactive ‘demonstration InfiniBand cables are used in single engine VPLEX VS6 cluster to connect the two directors in the base engine. The InfiniBand backbone handle the intra-cluster communication. With dual- and quad-engine VPLEX VS6 cluster, the InfniBand port are connected to the InfiniBand switches. The output confirms that the cluster has full connectivity - in respect to intra-cluster communication using InfiniBand. If a cable is faulty then the command output would show which cable is faulty. The faulty cable on a specific engine and director reports that it is I expected Copyright 2016 EMC Corporation. All rights reserved, \VPLEX VS6 Field Replaceable Units (FRUs) 49 Course Summary Key points covered in this course: » The FRU procedures, access tools, and physical identification methods were discussed and shown. » The videos for each FRU showed in detail the software and physical replacement steps for the faulted units. » The new VPLEX CLI context commands helped to identify and acquire the status of FRUs. ‘This concludes the training; proceed to the course assessment. ‘ter launching the assessment, you must complete it before returning to the course The course will automatically move to your Transcript within 48 hours after passing the assessment, This course covered the FRU procedures, access tools, and physical identification methods. The videos for each FRU showed in detail the software and physical replacement steps for the faulted units. The new VPLEX CLI context commands helped to identify and get the status of FRUs This concludes the training. Proceed to the course assessment on the next slide. poration. All ights reserved. \VPLEX VS6 Field Replaceable Units (FRUs) 50 Course Feedback aides) Do not record. Feedback Link will be inserted by Production Team. Copyright 2016 EMC Corporation. al rights reserved. \VPLEX VS6 Field Replaceable Units (FRUs) St VPLEX VS6 Cabling Demonstration Ped 1s reserved, VPLEX VS6 Field Replaceable Units (FRUs) 52

You might also like