Main Office Dates Activity Details Required Material
Main Office Dates Activity Details Required Material
HR + ENGINEERING OFFICE
19-Aug WALL HOLE CLOSING + VID ROOM MODIFICATION + ELECTRICAL CABLE WORK
20-Aug ELECTRICA WIRING + PRE- PLASTERING INSIDE
21-Aug
22-Aug REMOVE SHUTTERING + JACK
23-Aug INSIDE ALL PLASTERING + WATER LEVEL OF HALF WALL
24-Aug PUTTY + PRIMER COAT + GLASS WORKER VISIT
25-Aug OUTSIDE PLASTERING + TILES
26-Aug ELECTRICAL WORK ( AC+ LIGHT + INTERNET)