You are on page 1of 2

TEXAS PARKS AND WILDLIFE

For further information contact:


Carl Frentress
An Improved Device for
Regional Waterfowl Biologist – East Texas
Wildlife Division
Texas Parks and Wildlife
2906 Trey Circle
Managing
Water Levels
Athens, Texas 75751-6849
903-675-4177
FAX 903-675-7596

Acknowledgment
I wish to thank Hayden Haucke,
in Beaver
Area Manager of the Gus Engeling Wildlife
Management Area, for his assistance with
testing and applying the drain method.
Ponds
by Carl Frentress
Many ponds constructed by beaver are of the device followed ideas developed from
utilized by wintering waterfowl. Also, the field experience with beaver ponds. Subse-
large majority of these wetlands are excellent quent examination of literature revealed that
examples of the habitats required for rearing the same general concept had been proposed
wood ducks. Some researchers have found earlier in states in the Northeast. However,
that breeding wood ducks prefer foraging my updated version of the drain device
habitats comprised of shallow water areas employs readily available, economical
among or adjacent wooded sites. Most beaver materials which require no pre-assembly,
ponds fit this description. Therefore, because and, which are easily transported and
Partial funding for this publication was beaver ponds have been recognized as handled in the field. I have found these
contributed by Federal Aid (P-R) Project W-124-M valuable both to wintering waterfowl and to features to be useful improvements.
production of wood ducks, attention has This technique is based on the fact that
been turned to management possibilities for beaver tenaciously concentrate their dam
these sites. A major consideration in this enlargement and repair activities on, and/or,
strategy is the ability to manipulate water in the immediate vicinity of their structure.
levels in order to influence wetland plant Research has revealed that the sound of
communities. flowing water is the stimulus causing beaver
However, because of the tenacity of to recognize loss of water from their ponds.
beaver, the capability of wildlife managers to Because water overflows most beaver dams,
alter water levels in beaver ponds often is this construction activity is on-going.
4200 Smith School Road obstructed. Breaches may be repaired Therefore, in active beaver colonies, any
Austin, Texas 78744 overnight. Conventional drain pipes are undue loss of water is quickly slowed or
plugged repeatedly. During 1985, in search- stopped. The animals will fill large breaches
ing for ways to manipulate water levels in in the dam in only a few days. Also, conven-
beaver ponds, I devised a technique to tional pipes and culverts that may be
overcome the efforts of beaver to prevent inserted in the dam usually are plugged. The
PWD BR W7100-320 (10/97)
WILDLIFE DIVISION drawdown of their ponds. Preliminary testing classic three-log drains are handled similarly.
In accordance with Texas State Depository Law, this publication is available at
the Texas State Publications Clearinghouse and/or Texas Depository Libraries.
Consequently, beaver respond Soft wire 4. Assemble the drain tubes. Each (Figure 5). This manner of 6. Place end caps over the outlets. 7. When the dam has been bottom, beaver will stack material
to any destruction of their work Carpenter’s level drain tube will consist of solid- placement is important. After the pipes are in place, restored to the original over the pipes, thus, plugging the
simply by restoring the dams to Garden fork wall pipe for half the length Therefore, each drain will some of the inflow will begin elevation, remove the end caps intake sections. Therefore, the
their original condition. Thus, any and perforated-wall pipe for the consist of a combination of to flow around and through from the pipe outlets. This will pipes must be suspended about
device for prolonged passage of 2. Inspect the pond and beaver other half (Figure 3). These solid sections and perforated the pipes at the trench in the permit the inflow to pass 2 feet from the bottom. This
water through a beaver dam must dam to determine the most combined PVC sewer pipe (intake) sections. Two or more dam. If beaver are maintaining through the dam via the pipes prevents beaver tampering with
have an intake that is: 1) undetect- suitable location to place the sections should be assembled pipes may be necessary to carry an active colony in the pond, (Figure 11). The result is that the intake.
able to the beaver, and, 2) located drain pipe system. Generally, into one long tube. Couplings the normal stream inflow. The they will begin to repair the the water level will remain at Secondly, in a few instances
in the pond and away from the the clearest and deepest part of are simple, friction-type fittings number of pipes will depend on breach containing the pipes the new, reduced elevation. in our trials, beaver have
dam. Polyvinyl chloride (PVC) the pond is most desirable. that permit one end to be the size of the pond and the (Figure 8). They direct their Water subsequently may be attempted to build new dams
sewer pipes provide a means of shoved into the adjoining end. volume of inflow. An examina- repair activities at areas that raised or lowered simply by around the outfall below the dam.
installing a system that can be used 3. Dig a breach 1-2 feet wide These long, flexible pipes may tion of the stream current have water flowing through the replacing or removing the As mentioned above, the splashing
to manipulate water levels for through the dam (Figure 1). The be slightly unwieldy. Nonethe- above the pool may assist damaged portions. This outlet end caps according to water of the outfall is the stimulus
prolonged periods in beaver bottom of the resulting trench less, they can be handled judging the number of pipes for behavior can be used to management needs. causing beaver to recognize the
ponds. should correspond to the new, adequately and are sufficiently the drain. advantage by placing the end water discharge. This can be
This device and its installa- desired level of the water durable to be moved into caps on the pipe outlets. All This technique seems to eliminated by attaching a flex-hose
tion in a beaver pond is described surface in the pond after position (Figure 4). The 5. Using the carpenter’s level, outflow water will then flow effectively circumvent the repair downspout on the outlet ends of
in the steps that follow. installation of the device assembled tubes should be adjust the pipes to be almost around the exposed pipe. This behavior beaver exhibit toward the pipes to allow the released
(Figure 2). (In other words, dig placed with the solid-wall level, but with a slight pitch flowing water will stimulate other types of water control water to pass quietly into the
1. Assemble the following to the level at which you want sections lying through the favoring outlet flow. Wire them the beaver to fill the breach devices in their dams and ponds. downstream channel.
materials (exact quantities will the water surface to be after the excavated trench in the dam securely to steel fence posts (Figure 9). In repairing the However, two potential problems This technique is routinely
depend on site-specific drain is operating.) A garden while the perforated-wall driven into the pond bottom at damage, beaver cover the related to installation/operation of recommended and utilized for
requirements): fork is especially suited to sections extend into the pond intervals appropriate for pipes, making them an integral the device are notable. First, a management objectives serving
PVC sewer pipe (solid-wall, pulling material from the dam. supporting the entire length part of the dam (Figure 10). beaver pond cannot be completely both wood duck production and
4-in. diameter, 10-ft. lengths) Water is allowed to drain (Figures 6 and 7). After this has happened, the drained with this method. This enhancement of wintering
PVC sewer pipe (perforated- through the breach until the Figure 4. drains are ready to operate. would require the intake sections waterfowl habitat in East and
wall, 4-in. diameter, 10-ft. new, desired water level is An assembled drain pipe combination to lie on the pond bottom. When Central Texas. Additionally, the
lengths) attained in the pond. is being moved into place. Figure 6. systems are installed with the system provides a non-lethal
PVC end caps (4-in. diameter; Pipes are situated in the pond with a pipes lying on or near the pond option for application in nuisance
one for each outlet) slight downward pitch toward the situations created by beaver.
outlet end.
Steel, T-type fence posts (6-ft.
length; longer lengths for
Figures 8 (left), 9 (below top)
deeper ponds) Figure 2.
Enlarge the trench and drain water until and 10 (below bottom). Figure 11.
Post driver Beaver will repair the breach, thus The system is operated by removing
the desired lower level is reached.
incorporating the drain pipes into the the end caps from the drain pipes.
dam. Note the end caps are in place.

Figure 1.
A garden fork is used to dig a trench
through the beaver dam. Figure 5.
The solid section is in place in the
dam; the perforated section extends
into the pond in the background.
Figure 7.
T-posts are suitable supports for the
drain pipes.
Figure 3.
The drains consist of solid-wall pipe
and perforated-wall pipe.

You might also like