Step 7: Finalize Improvement Plan: Preparing To Pilot
Step 7: Finalize Improvement Plan: Preparing To Pilot
Preparing to Pilot
Risk Management
• Identify potential problems of your solutions
• Determine the likelihood of their occurrence
• Take steps to avoid or deal with the likely problems in
order to have higher chance of success
High
Probability of Occurrence
Yellow light: Red light: Red light:
Proceed with Address before Do not Proceed
caution proceeding
Medium
Description of Risk
ID Risk Event Trigger Potential Impact if Risk Event Occurs
Event
RISK SCORE
Assess the
Assess how often 20-25 - Catastrophic
severity based on
a failure mode or Risk Score =
its cause happens.
how bad the
Severity x 10-19 - High
effects of the Categorize the
Rated on a scale
failure mode are. A
Likelihood
risk according
4-9 - Moderate
of 1 to 5, where 5 Highest Risk to its 1-3 - Low
rating of 5 means
means that failure Score warrants consequence
that an effect is so
is certain to occur first consideration
severe, it threatens
and 1 means for analysis.
the safety of the
extremely remote.
customer.
RISK
Assess how often
LIKELIHOOD
Assess the
SEVERITY RISK SCORE RISK RISKSCORE
CATEGORY
a failure mode or severity based on 20-25 - Catastrophic
Risk Score =
its cause happens.
ABSENTEEISM how bad the
5 Severity 5
x 10-19 - HighCATASTROPHIC
25
Rated on a scale effects of the Categorize the
of 1 to 10, where failure mode are. A
Likelihood 4-9 - Moderate
risk according
Highest Risk to its 1-3 - Low
10 means that rating of 10 means
Score warrants consequence
failure is certain to that an effect is so
first consideration
occur and 1 severe, it threatens
for analysis.
means extremely the safety of the
remote. customer.