ee
Email Ch pi EARS BAN TD gmneaah Com
Petula ONO! FEY ae - 49214%2-0
foverle Fegnayes
‘Trade License No. eee
Hereinafter referred to asthe second party (Customer)
Whereas the customer requests to obtain gas services on a
certain property located atthe given address:
Project Name: DISCOVERY GARDENS.
Bldg/Black/Frend: 4.50
Unit Number: wes:
{Gas Account Number:
Preamble:
‘Whereas the fst part is @ company specialize in Installation
and extension gas networks by vtwe of licenses issued from
the official authorities,
‘The second parts (owner / tenant) of the property mentioned
above, the partes hereby agreed on the folowing terms and
conditions:
4. This preamble shall be deemed as an integral part ofthis
Contract, a base for interpretation ofits text and an integral
Part to the terms and conditions thereo.
2 The fist party (supplier) wil provide uninterrupted ens
supply to the Customer's locatlon/premise. should a
temporary cut-off of supply be required due to any incident
and or major service interruption tothe system the fist party
shall notify Customer ofthe affected areas and the duration of,
the cut-off prior to making any cut-off of supply in case of
Scheduled work, oF as soon as possible in the event of
Unscheduled interruption
3. The Customer has agreed to pay the tri rates as fllows:
‘connection Fees:
Security Depost
‘AED 500.00 ~Non Refundabl
‘AED 500.00 ~ Refundable
Fed charges: AED30.00/ month
Default charges: AED 30.00/ month
Gas Consumption: AED 19.48 / cubic meter
4, Te frst party (supplier) shall have the right to deduet the
final bil amount from the Security Deposit and any excess
amount shall be refunded to the customer. customer
undertakes to setle outstanding amount in case the Security
Deposit snot sufficient to.cover payment for the fina Bil
An
ween i 20__
Joh 8533013 A Fabs (o) He HPS 2 Bal
41033 yp nn al a
(Cas) Jajah
frit yh 2
gal
@ (1) tyne
e250
sad Ine)
ahd ip AO
jell at Jy
Aaja ak ta
(Saad) ALY a Lh GR Hy
SoD eel Ju yD Se Up hy Ua
“St
ea a
ws
Bad
ihe hy
‘ase
ay IAN ASE ay Bk Lae BS Ji GL Sam
na onl Ont and ol y iy yal 3
(6 BH el AS Kan (lie |) GE I Can
AIA Sia 994 ec
Vp yd pty Ge SY Ue Me
a hl ebay Da Sy ah ny
pi Bh hat A 8. J a yd) Ml 2
easy
Sie 2 Lad EU yoy Cay (BS Sa hy
We Rh Ae a SMA (Qa) A) Gay ay
hyo A ILS At Ud iy Sd (ny AB Ha aly
gre UL Sy Ja cee
PN BAL poy JD pe gh le GANG Gly 3
sal aes ees
eal
AB pans
nabs
Jad
By ooh ae a 5 5d od (2399) J
Rees Coad) ADS 10 50 (ad) AIG 3 i id
Wiad eee os pet'5. Th fist party (supp) shal provide the Invoke forte gs ill
‘monthly (lor commercial) and or quarterly (or residential) The
ppl shall have the right to dconnect the gas services lo ease
the customer fale to settle the eustanding amount on or before
the de date o the outstanding amount exceeds more than SOX
‘ofthe security depot. In such case of connection, a service fee
shall apply forthe reconnection
6. Poymer ofa ivoles shal be effected by Customer to supplier
‘bank acount ono Before the de date as ndcated onthe Invoke.
7. The Customer wil asst the supll’s representative to access
‘the meter tobe read on appropiate days and to perform period
ralenance of the gas systems located within the apartment/uit
required. Default Charges shall apply in case of allure to get the
‘eter reading by the supplier due to Inacessbity of the
‘partmentJunt and deal mount sll be adjusted as o0n the
‘meter reading becomes avaible on the nest bling pesto
8. The Guster undertakes to norm the fst party and request for
{at daconnection fe (5) days before vacating the premises, should
the customer leave the premise on 2 short-term period, the
tstomer needs to request for temporary gas dscomnecton and
reconnection once as willbe used aga
For commercial accounts who request fr temporary diconnection
{due to renovation, 2 reconnection fe shall apply.
"The Customer undertakes nt to use or bring LPG yinder inside
‘the apartment were 2 central gb system i stalled forthe
safety ofthe bulsng andthe tenants
40. The Customer undertates to Inform the fst party (supple)
Immediately In ease of any emergencies or pereved Incidents. In
case of emergencies, the Customer shall call supplies Call Center
toll free mimber €00'5224 and advise the
‘operatr ofthe emergency stuationacordingy.
11. The fst pany shall provide a 24-hour emergency response
Service and sell attend to such emergencies within 2 reasonable
period of time fom the time of reeling any emergency call.
42. The ist party hereby reserves the rights to revise the gas rtes
‘without ror noice to cstemer should the LP6/Propane pce and
fr operating cost in the lcal market change for any acceptable
43, The suppl shall charg the customer forthe cost ofthe hose
in the event that the ose Is ising at the time of eas
disconnection
41 The fst party shal process the nal Bll at the time of eas