You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14

69000

2800 4000 2500 8000 8000 8000 8000 8000 8000 8000 2500 4000 2800

W W W W W W W W W W

A 6 6 1 1 1 1 1 1 6 6

3000

3000
B W CLUB ROOM CLUB ROOM LABORATORY LABORATORY W
6 6
4000

4000
D D D D D D D D D

W
6
D
1
D
1
1
OFFICE ROOM 1 1 1 1 1 1 1 1
D
1
D
1
W
6

C
2000

2000
W W W W W W
2 2 3 3 3 3
W W W W

D
4 2 2 2

MEETING ROOM
1
D D D
2 1 1
UP UP UP UP

LIBRARY
19000

19000
7000

7000
OFFICE ROOM CANTEEN
UP UP UP UP
D D D
2 1 1
D
1

E
2000

2000
W W W W
4 2 2 2
W W W W W W W W

F 5 2 2 3 3 3 3 5

D
1
D
1
D
1 OFFICE ROOM D
1 D D
D
1
D
1
D
1
D
1
D
1
D
1 D D
4000

4000
1 1 1 1
W 7 W
5 5
D
2

CLUB ROOM CLUB ROOM LABORATORY LABORATORY STORAGE


G ROOM
3000

3000
9
W W
5 5

H W
5
W
1
W
1
W
1
W
1
W
1
W
1
W
5

ROOF LINE
3000 4000 2500 8000 8000 8000 8000 8000 8000 8000 2500 4000 3000

69000

GROUND FLOOR POWER LAYOUT


SCALE: 1:350

LEGEND
ELECTRICAL
: PANEL BOARD, MCCB TYPE RACEWAY
: EMBEDDED TO CEILING D: UPLEX CONVENIENCE OUTLET
SWITCH
: RACEWAY FLOOR DUPLEX RECEPTACLE OUTLET
PULL
: BOX RACEWAY
: EMBEDDED TO FLOOR C: EILING LIGHT (LED)
CIRCUIT
: HOMERUN
KILOWATTHOUR
: METER
ONE
: GANG, SINGLE POLE SWITCH, 16A, 250V
SERVICE
: ENTRANCE
:TWO GANG, SINGLE POLE SWITCH, 16A, 250V
CIRCUIT
: BREAKER
:THREE GANG, SINGLE POLE SWITCH, 16A, 250V

PROJECT TITLE: PREPARED BY: SHEET CONTENTS: SHEET NUMBER:


BUELLA, ALEXANDRA H. MANIWANG, ISABEL KINCY A.

ROMBLON STATE UNIVERSITY PROPOSED COLLEGE OF ENGINEERING


FALOGME, MARK ANTHONY M.

CHECKED BY:
BSCE III - BLK I
MEMBRANO, ARTH DAVE F.

GROUND FLOOR POWER LAYOUT E-1


COLLEGE OF ENGINEERING AND TECHNOLOGY AND TECHNOLOGY BUILDING
LOCATION: LIWANAG, ODIONGAN, ROMBLON
ENGR. JEROME G. GACU
PROFESSOR
25