You are on page 1of 1
APPENDIX 4 “TRICITY SUPPLY APPLICA EEDING 1004 CHECK No|FoRWDOCUMENT| INFORMATION REQUIRED __ [STAGE] STAGE AC [Bai lforaon — [Aaa of salaton Wm Name & Address of Owner / Developer YIN Name & Address of Consultant Engineer YIN Type of rein YW Voltage Level (275KV, 132 kV, 33 kV, 22 kV, YIN io) Supply Scheme (O/H or U/G; Bulk IPD) YIN Total Load Required (kW) YIN Date Supply Required YIN tats te aa 7H [Ean & rans — atest Devcomant ra Pan aprovedby | VIN (eferto ate e504) | foal autor Site Plan & contour plan with Proposed Sub- YIN Station Sites (Top view & Side-Section Plan) Location plan on meter panel / room or front YIN elevation of building requiring supply (to Aeteine rer en) Layout Plan of Sub-station Building YIN (austen peat Pan af Man Sach RSOR_[ VN Single Une Dagram / Schenti f vw Inglaton Storage Dove [ GD Ter a he above pans | TN (QUPEM standard map with Coordinates System = UTM GSe4) B_| Load Details YIN C_| Metering Details YIN D_| Load Profile & Consumption YIN E | Motor Loads YIN F | Capacitor Bank Installation YIN G_| Power Quality Compliance Declaration Form YIN Ti [ Fre Fahng Docimentaton for tached sBSaTon YW ‘Substation Land 1 Copy Borang A (Perakuan YIN Pajtanbraahmiic Tana Penang Bank Guarantee YR ‘8 Copies Pre-Com Plan PE (Endorsed by YIN certified surveyor) copy ot Rak [Goan a NV&HY Metoing [Preliminary metering fomaton sheet vn

You might also like