APPENDIX 4
“TRICITY SUPPLY APPLICA EEDING 1004
CHECK
No|FoRWDOCUMENT| INFORMATION REQUIRED __ [STAGE] STAGE
AC [Bai lforaon — [Aaa of salaton Wm
Name & Address of Owner / Developer YIN
Name & Address of Consultant Engineer YIN
Type of rein YW
Voltage Level (275KV, 132 kV, 33 kV, 22 kV, YIN
io)
Supply Scheme (O/H or U/G; Bulk IPD) YIN
Total Load Required (kW) YIN
Date Supply Required YIN
tats te aa 7H
[Ean & rans — atest Devcomant ra Pan aprovedby | VIN
(eferto ate e504) | foal autor
Site Plan & contour plan with Proposed Sub- YIN
Station Sites (Top view & Side-Section Plan)
Location plan on meter panel / room or front YIN
elevation of building requiring supply (to
Aeteine rer en)
Layout Plan of Sub-station Building YIN
(austen peat Pan af Man Sach RSOR_[ VN
Single Une Dagram / Schenti f vw
Inglaton
Storage Dove [ GD Ter a he above pans | TN
(QUPEM standard map with Coordinates
System = UTM GSe4)
B_| Load Details YIN
C_| Metering Details YIN
D_| Load Profile & Consumption YIN
E | Motor Loads YIN
F | Capacitor Bank Installation YIN
G_| Power Quality Compliance Declaration Form YIN
Ti [ Fre Fahng Docimentaton for tached sBSaTon YW
‘Substation Land 1 Copy Borang A (Perakuan YIN
Pajtanbraahmiic Tana Penang
Bank Guarantee YR
‘8 Copies Pre-Com Plan PE (Endorsed by YIN
certified surveyor)
copy ot Rak [Goan a
NV&HY Metoing [Preliminary metering fomaton sheet vn