Installation Detail Required For Instruments (STEC Reply 27-April)
Installation Detail Required For Instruments (STEC Reply 27-April)
设备配套液位计,已安装
液位计 10LAA10CL301 Already Installed
设备配套液位计,已安装
液位计 10LAA20CL301 Already Installed
两端法兰与管道焊接后,螺栓连接
孔板 10LAB21CF001 Relief Valve
孔板 10LAB22CF001 Relief Valve 两端法兰与管道焊接后,螺栓连接
10LAB31CF001 DP Orifice 法兰连接(仪表接头向下倾斜45°)
10LAB32CF001 DP Orifice 法兰连接(仪表接头向下倾斜45°)
10LAB33CF001 DP Orifice 法兰连接(仪表接头向下倾斜45°)
10LBA10CF001 DP Orifice 法兰连接(仪表接头向上倾斜45°)
10LBA11CF001 DP Orifice 法兰连接(仪表接头向上倾斜45°)
10PAB20CT101 SH20023-082-094-18
Local Flowmeter 两端法兰与管道焊接后,螺栓连接
10PAR10CF001 Cooling Tower
10URA10CL302 变送器固定冷却塔立柱,探头投入水中
Cooling Tower
After welding both ends of flanges and pipes,then adopt bolt connection
After welding both ends of flanges and pipes,then adopt bolt connection
Flanged connection (instrument connector inclined down 45°)
Flanged connection (instrument connector inclined down 45°)
Flanged connection (instrument connector inclined down 45°)
Flanged connection (instrument connector incline up 45°)
Flanged connection (instrument connector incline up 45°)
please refer to the drawing SH20023-082-094-18
After welding both ends of flanges and pipes,then adopt bolt connection
Transmitter would be fixed on the cooling tower column, and the put the sensor
into the water
Equipment with metal sleeve (similar with thermowells), adopt threaded
connection
Equipment with metal sleeve (similar with thermowells), adopt threaded
connection
after primary valve installed, then adopt the flange connected
after primary valve installed, then adopt the flange connected
after primary valve installed, then adopt the flange connected
after primary valve installed, then adopt the flange connected
after primary valve installed, then adopt the flange connected
Open the hole on the panel and then install
please refer to the drawing SH20023-082-094-15
please refer to the drawing SH20023-082-094-15
The received resistivity meter is a complete set of equipment and has been
installed
Equipment with metal sleeve (similar with thermowells), adopt threaded
connection
Equipment with metal sleeve (similar with thermowells), adopt threaded
connection
after primary valve installed, then adopt the flange connected
after primary valve installed, then adopt the flange connected
after primary valve installed, then adopt the flange connected
after primary valve installed, then adopt the flange connected
after primary valve installed, then adopt the flange connected
Open the hole on the panel and then install
please refer to the drawing SH20023-082-094-15
please refer to the drawing SH20023-082-094-15
Equipment with metal sleeve (similar with thermowells), adopt threaded
connection
please refer to the drawing SH20023-082-094-19
please refer to the drawing SH20023-082-094-19
please refer to the drawing SH20023-082-094-19
please refer to the drawing SH20023-082-094-19
The received liquid level gauge is a complete set of equipment and has been
installed
The received liquid level gauge is a complete set of equipment and has been
installed
The received resistivity meter is a complete set of equipment and has been
installed
The received PH device is a complete set of equipment and has been installed
The received resistivity meter is a complete set of equipment and has been
installed
Comments 21-April-2021 名称
Please Share Installation detail drawing
Please Share Installation detail drawing
AQC炉自动取样水质分析仪
Please Share Installation detail drawing