Include OSP Actual Cost Summary Page: 1 of 2 Period From: 01-DEC-20 Period To: 31-DEC-20 Department From: ELEC.WN Department To: ELEC.WN Owning Owning Department Department Name Material Labor Equipment Total --------------- ----------------------------- -------------- -------------- -------------- -------------- ELEC.WN ELECTRICAL WARTSIL NIIGATA PG 47,725.70 0.00 0.00 47,725.70 ============== ============== ============== ============== Report Total: 47,725.70 0.00 0.00 47,725.70 MLCFL_IO (PKR) Report Date: 12-JAN-21 Include OSP Actual Cost Summary Page: 2 of 2 Period From: 01-DEC-20 Period To: 31-DEC-20 Department From: ELEC.WN Department To: ELEC.WN Owning Owning Department Outside Department Name Processing --------------- ----------------------------- -------------- ELEC.WN ELECTRICAL WARTSIL NIIGATA PG 0.00 ============== Report Total: 0.00