PENGELUARAN
TOTAL MAINTENANCE PIT COST Rp 35,820,927 RUPIAH
TOTAL CLEARING & HAULING SOIL COST Rp 175,399,173 RUPIAH
TOTAL OVERBURDEN & HAULING OB COST Rp 447,701,173 RUPIAH
TOTAL ORE & HAULING COST Rp 71,258,575 RUPIAH
TOTAL BELANJA HARIAN BUDGET COST Rp 9,610,000 RUPIAH
TOTAL OPERATIONAL BUDGET HSE COST Rp 977,000 RUPIAH
TOTAL LOGISTIC & PURCHASING COST Rp 11,358,500 RUPIAH
TOTAL CONSUMPTION COST Rp 19,693,500 RUPIAH
TOTAL ALL COST (RUPIAH) Rp 771,818,848 RUPIAH
TOTAL ALL COST (USD $) $ 47,091 USD
TOTAL ALL COST (USD $/TON) $ 28.03 USD
PERKIRAAN PEMASUKAN
TOTAL ALL COST (RUPIAH) Rp 151,443,600 RUPIAH
TOTAL ALL COST (USD $) $ 9,240 USD
TOTAL ALL COST (USD $/TON) $ 5.50 USD
PT GUNUNG SAMUDERA INTERNASIONAL
MAINTENANCE PIT
PIT AMEHYS
PERIODE MARET 2020
HOURSMETER
DATE/HM
NO OPERATOR UNIT/TYPE S/N DAYS MAINTENANCE TOTAL HM MAINTENANCE Total Unit Bekerja
2 5 6 25 26
1 HENDRA PC 200 EX 219 2 0 0 0 9.2 8.1 17.3
2 RASYID PC 195 EX 214 3 8 8 8 0 0 24
3 SUKMO PC 210 EX 231 2 0 8 7 0 0 15
4 RIFAL PC 300 EX 302 1 0 8 0 0 0 8
5 RIFAL PC 300 EX 308 1 0 0 4 0 0 4
TOTAL 68.3
FUEL
DATE/LTR
NO OPERATOR UNIT/TYPE S/N DAYS MAINTENANCE TOTAL FUEL MAINTENANCE FUEL RATIO
2 5 6 12 13
1 HENDRA PC 200 EX 219 2 0.00 0.00 0.00 129.63 114.13 243.75 14.09
2 RASYID PC 195 EX 214 3 132.95 132.95 132.95 0.00 0.00 398.85 16.62
3 SUKMO PC 210 EX 231 2 0.00 148.45 129.89 0.00 0.00 278.33 18.56
4 RIFAL PC 300 EX 302 1 0.00 230.90 0.00 0.00 0.00 230.90 28.86
5 RIFAL PC 300 EX 308 1 0.00 0.00 125.83 0.00 0.00 125.83 31.46
TOTAL 132.95 512.30 388.67 129.63 114.13 1277.67
ALL COST
NO OPERATOR UNIT/TYPE S/N TOTAL HM TOTAL FUEL RENT COST TOTAL RENT COST FUEL COST TOTAL FUEL COST TOTAL ALL COST
1 HENDRA PC 200 EX 219 17.3 243.75 Rp 250,000.00 Rp 4,325,000.00 Rp 12,500.00 Rp 3,046,913.97 Rp 7,371,913.97
2 RASYID PC 195 EX 214 24 398.85 Rp 250,000.00 Rp 6,000,000.00 Rp 12,500.00 Rp 4,985,655.74 Rp 10,985,655.74
3 SUKMO PC 210 EX 231 15 278.33 Rp 275,000.00 Rp 4,125,000.00 Rp 12,500.00 Rp 3,479,183.11 Rp 7,604,183.11
4 RIFAL PC 300 EX 302 8 230.90 Rp 450,000.00 Rp 3,600,000.00 Rp 12,500.00 Rp 2,886,301.37 Rp 6,486,301.37
5 RIFAL PC 300 EX 308 4 125.83 Rp 450,000.00 Rp 1,800,000.00 Rp 12,500.00 Rp 1,572,872.34 Rp 3,372,872.34
TOTAL Rp 35,820,926.52
PT GUNUNG SAMUDERA INTERNASIONAL
CLEARING AND SOIL REMOVAL
PIT AMEHYS
PERIODE MARET 2020
HOURSMETER
DATE/HM
NO OPERATOR UNIT/TYPE S/N DAYS CLEARING TOP SOIL CLEARING TOTAL HM CLEARING TOTAL HM TOP SOIL
1 2 3 4 5 6 7 8 9 10 11 12 13 27 28
1 DARLIS PC 200 EX 201 1 0 0 0 0 0 0 0 0 0 0 0 0 0 8.3 0 8.3 0
2 AMRAN PC 195 EX 213 4 0 0 0 0 0 0 0 0 7 6 7 6 0 0 0 0 26
3 RASYID PC 195 EX 214 10 8 0 8 7 0 0 8 8 8 8 8 8 7 0 0 31 47
4 SUKMO PC 210 EX 231 13 8 9 8 8 0 0 8 8 8 8 8 8 7 8.6 6.6 56.2 47
5 RIFAL PC 300 EX 308 5 0 0 0 0 0 0 7 8 8 8 4 0 0 0 0 7 28
TOTAL 102.5 148
DATE/HM
NO DRIVER UNIT/TYPE S/N DAYS CLEARING TOP SOIL CLEARING TOTAL HM CLEARING TOTAL HM TOP SOIL
1 2 3 4 5 6 7 8 9 10 11 12 13 27 28
1 HARDIN DT HOWO DT 01 3 0 0 0 0 0 0 0 0 5.8 0 9.1 0 6.6 0 0 0 21.5
2 MUSLAEDI DT HOWO DT 04 2 0 0 0 0 0 0 0 0 0 8.5 0 0 6.7 0 0 0 15.2
3 LATIF DT HOWO DT 07 4 0 0 0 0 0 0 0 0 5.2 7.4 9 0 6.6 0 0 0 28.2
4 RAHMAN DT HOWO DT 08 2 0 0 0 0 0 0 0 0 0 8.5 0 0 7.5 0 0 0 16
5 ILHAM DT TATA DT 03.08 1 0 0 0 0 0 0 0 0 0 0 0 7 0 0 0 0 7
6 SABRIADI DT TATA DT 03.09 1 0 0 0 0 0 0 0 0 0 0 0 7.5 0 0 0 0 7.5
7 DT TATA DT 03.11 1 0 0 0 0 0 0 0 0 0 0 0 7.5 0 0 0 0 7.5
TOTAL 0 102.9
FUEL
DATE/LTR
NO OPERATOR UNIT/TYPE S/N DAYS CLEARING TOP SOIL CLEARING TOTAL FUEL CLEARING TOTAL FUEL TOP SOIL FUEL RATIO
1 2 3 4 5 6 7 8 9 10 11 12 13 27 28
1 DARLIS PC 200 EX 201 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 152.19 0.00 152.19 0.00 18.34
2 AMRAN PC 195 EX 213 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 117.30 100.55 117.30 100.55 0.00 0.00 0.00 0.00 435.70 16.76
3 RASYID PC 195 EX 214 10 132.95 0.00 132.95 116.33 0.00 0.00 132.95 132.95 132.95 132.95 132.95 132.95 116.33 0.00 0.00 515.18 781.09 16.62
4 SUKMO PC 210 EX 231 13 148.45 167.00 148.45 148.45 0.00 0.00 148.45 148.45 148.45 148.45 148.45 148.45 129.89 159.58 122.47 1042.83 872.12 18.56
5 RIFAL PC 300 EX 308 5 0.00 0.00 0.00 0.00 0.00 0.00 220.20 251.66 251.66 251.66 125.83 0.00 0.00 0.00 0.00 220.20 880.81 31.46
TOTAL 281.40 167.00 281.40 264.78 0.00 0.00 501.60 533.06 650.36 633.60 524.53 381.94 246.22 159.58 122.47 1930.40 2969.71
DATE/LTR
NO DRIVER UNIT/TYPE S/N DAYS CLEARING TOP SOIL CLEARING TOTAL FUEL CLEARING TOTAL FUEL TOP SOIL FUEL RATIO
1 2 3 4 5 6 7 8 9 10 11 12 13 27 28
1 HARDIN DT HOWO DT 01 3 0 0 0 0 0 0 0 0 42.572 0 66.794 0 48.444 0 0 0.00 157.81 7.34
2 MUSLAEDI DT HOWO DT 04 2 0 0 0 0 0 0 0 0 0 64.6 0 0 50.92 0 0 0.00 115.52 7.60
3 LATIF DT HOWO DT 07 4 0 0 0 0 0 0 0 0 31.512 44.844 54.54 0 39.996 0 0 0.00 170.892 6.06
4 RAHMAN DT HOWO DT 08 2 0 0 0 0 0 0 0 0 0 66.385 0 0 58.575 0 0 0.00 124.96 7.81
5 ILHAM DT TATA DT 03.08 1 0 0 0 0 0 0 0 0 0 0 0 70 0 0 0 0.00 70 10.00
6 SABRIADI DT TATA DT 03.09 1 0 0 0 0 0 0 0 0 0 0 0 90 0 0 0 0.00 90 12.00
7 DT TATA DT 03.11 1 0 0 0 0 0 0 0 0 0 0 0 90 0 0 0 0.00 90 12.00
TOTAL 0 0 0 0 0 0 0 0 74.084 175.829 121.334 250 197.935 0 0 0.00 819.18
FUEL RATIO
ALL COST
NO OPERATOR UNIT/TYPE S/N TOTAL HM TOTAL FUEL RENT COST TOTAL RENT COST FUEL COST TOTAL FUEL COST TOTAL ALL COST
1 DARLIS PC 194 EX 212 8.3 152.19 Rp 250,000.00 Rp 2,075,000.00 Rp 12,499.00 Rp 1,902,167.05 Rp 3,977,167.05
2 AMRAN PC 195 EX 213 26 435.70 Rp 250,000.00 Rp 6,500,000.00 Rp 12,500.00 Rp 5,446,212.12 Rp 11,946,212.12
3 RASYID PC 195 EX 214 78 1296.27 Rp 250,000.00 Rp 19,500,000.00 Rp 12,500.00 Rp 16,203,381.15 Rp 35,703,381.15
4 SUKMO PC 210 EX 231 103.2 1914.94 Rp 275,000.00 Rp 28,380,000.00 Rp 12,500.00 Rp 23,936,779.79 Rp 52,316,779.79
5 RIFAL PC 300 EX 308 35 1101.01 Rp 450,000.00 Rp 15,750,000.00 Rp 12,500.00 Rp 13,762,632.98 Rp 29,512,632.98
6 HARDIN DT HOWO DT 01 21.5 - Rp 420,000.00 Rp 9,030,000.00 Rp 12,500.00 Rp - Rp 9,030,000.00
7 MUSLAEDI DT HOWO DT 04 15.2 - Rp 420,000.00 Rp 6,384,000.00 Rp 12,500.00 Rp - Rp 6,384,000.00
8 LATIF DT HOWO DT 07 28.2 - Rp 420,000.00 Rp 11,844,000.00 Rp 12,500.00 Rp - Rp 11,844,000.00
9 RAHMAN DT HOWO DT 08 16 - Rp 420,000.00 Rp 6,720,000.00 Rp 12,500.00 Rp - Rp 6,720,000.00
10 ILHAM DT TATA DT 03.08 7 70 Rp 220,000.00 Rp 1,540,000.00 Rp 12,500.00 Rp 875,000.00 Rp 2,415,000.00
11 SABRIADI DT TATA DT 03.09 7.5 90 Rp 220,000.00 Rp 1,650,000.00 Rp 12,500.00 Rp 1,125,000.00 Rp 2,775,000.00
12 DT TATA DT 03.11 7.5 90 Rp 220,000.00 Rp 1,650,000.00 Rp 12,500.00 Rp 1,125,000.00 Rp 2,775,000.00
TOTAL Rp 175,399,173.09
PT GUNUNG SAMUDERA INTERNASIONAL
HOURSMETER
1 HARDIN DT HOWO DT 01
2 MUSLAEDI DT HOWO DT 04
3 HARDIN DT HOWO DT 05
4 LATIF DT HOWO DT 07
5 RAHMAN DT HOWO DT 08
FUEL
1 HARDIN DT HOWO DT 01
2 MUSLAEDI DT HOWO DT 04
3 HARDIN DT HOWO DT 05
4 LATIF DT HOWO DT 07
5 RAHMAN DT HOWO DT 08
TOTAL
FUEL RATIO
ALL COST
DAYS
14 15
13 0 0
15 5 8
16 7 8
5 0 0
16 8 8
7 0 0
5 0 0
TOTAL
DAYS
14 15
9 6.6 0
6 6.7 0
8 0 0
4 6.6 0
10 7.5 0
TOTAL
DAYS
14 15
13 0.00 0.00
15 83.79 134.06
16 116.33 132.95
5 0.00 0.00
16 148.45 148.45
7 0.00 0.00
5 0.00 0.00
348.56 415.46
DAYS
14 15
9 48.444 0
6 50.92 0
8 0 0
4 39.996 0
10 58.575 0
197.935 0
ACTUAL OB (TON)
DATE/HM
16 17 18
13 13 13
7 6 9
13 13 13
8 13 0
13 13 12
8 13 13
0 0 0
TOTAL
DATE/HM
16 17 18
9.1 6.5 0
0 7.4 9.1
5.6 0 7.3
9.3 7.8 7.8
3 4 9.5
TOTAL
DATE/LTR
16 17 18
238.36 238.36 238.36
117.30 100.55 150.82
216.05 216.05 216.05
112.72 183.17 0.00
241.22 241.22 222.67
251.66 408.95 408.95
0.00 0.00 0.00
1177.31 1388.29 1236.84
DATE/LTR
16 17 18
66.794 47.71 0
0 56.24 69.16
47.096 0 61.393
56.358 47.268 47.268
23.43 31.24 74.195
193.678 182.458 252.016
FR OB
0.80
DATE/HM
19 20 21
8.3 8.2 5.6
8.5 8.5 0
4.8 6 4.9
0 0 0
8.5 7.7 4.3
DATE/LTR
19 20 21
55.01 128.35 165.02
100.55 117.30 134.06
0.00 0.00 149.57
112.72 112.72 70.45
92.78 129.89 167.00
125.83 125.83 157.29
0.00 0.00 0.00
486.88 614.09 843.39
DATE/LTR
19 20 21
60.922 60.188 41.104
64.6 64.6 0
40.368 50.46 41.209
0 0 0
66.385 60.137 33.583
232.275 235.385 115.896
22 23 24
5.4 0 0
0 5.2 0
4.7 0 0
0 0 0
4.6 4.2 0
22 23 24
165.02 165.02 176.02
134.06 134.06 150.82
116.33 116.33 149.57
0.00 0.00 0.00
148.45 148.45 113.19
251.66 0.00 0.00
0.00 202.04 0.00
815.52 765.90 589.60
22 23 24
39.636 0 0
0 39.52 0
39.527 0 0
0 0 0
35.926 32.802 0
115.089 72.322 0
25 26 27
9.4 0 0
9 9 8
8 10 9
0 0 0
8.9 8.6 0
0 0 0
9 9 9
25 26 27
7.6 3.6 0
0 0 0
8.8 9.1 0
0 0 0
0 8.8 0
25 26 27
172.35 0.00 0.00
150.82 150.82 134.06
132.95 166.19 149.57
0.00 0.00 0.00
165.15 159.58 0.00
0.00 0.00 0.00
259.77 259.77 259.77
881.04 736.35 543.40
25 26 27
55.784 26.424 0
0 0 0
74.008 76.531 0
0 0 0
0 68.728 0
129.792 171.683 0
28 29 30
8 0 8.4
0 0 9
7 8 9
0 0 0
0 6.7 8.3
0 0 0
7 0 0
28 29 30
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
28 29 30
146.68 0.00 154.02
0.00 0.00 150.82
116.33 132.95 149.57
0.00 0.00 0.00
0.00 124.32 154.01
0.00 0.00 0.00
202.04 0.00 0.00
465.06 257.27 608.42
28 29 30
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
TOTAL HM
31
9.4 120.8
0 116
5 142
0 42
5.6 135.2
0 55
0 41
652
TOTAL HM
31
0 60.9
0 45.4
0 51.2
0 31.5
0 62.1
251.1
HOURSMETER
1 HARDIN DT HOWO DT 01
2 LATIF DT HOWO DT 05
3 MUSLAEDI DT HOWO DT 07
4 RAHMAN DT HOWO DT 08
FUEL
1 HARDIN DT HOWO DT 01
2 LATIF DT HOWO DT 05
3 MUSLAEDI DT HOWO DT 07
4 RAHMAN DT HOWO DT 08
TOTAL
FUEL RATIO
ALL COST
DATE/HM
DAYS
26 27 28
2 9.8 0 0
3 0 0 7
3 0 0 0
3 0 0 0
TOTAL
DATE/HM
DAYS
26 27 28
2 0 0 0
2 0 0 0
2 0 0 0
2 0 0 0
TOTAL
DATE/LTR
DAYS
26 27 28
2 179.69 0.00 0.00
3 0.00 0.00 117.30
3 0.00 0.00 0.00
3 0.00 0.00 0.00
179.69 0.00 117.30
DATE/LTR
DAYS
26 27 28
2 0 0 0
2 0 0 0
2 0 0 0
2 0 0 0
0 0 0
ACTUAL ORE (TON)
FR ORE
HAULING TOTAL
1,680.00 1,680.00 1.26
DATE/HM
TOTAL HM
29 30 31
7.7 0 0 17.5
7 0 9 23
3.4 8.8 8.7 20.9
7 8 9 24
85.4
DATE/HM
TOTAL HM
29 30 31
0 9.3 5.1 14.4
0 8.7 6.1 14.8
0 8.8 5 13.8
0 9 5 14
57
DATE/LTR
TOTAL FUEL
29 30 31
141.18 0.00 0.00 320.87312415
117.30 0.00 150.82 385.42424242
47.91 123.99 122.58 294.47630923
202.04 230.90 259.77 692.71232877
508.43 354.89 533.17 1693.4860046
DATE/LTR
TOTAL FUEL
29 30 31
0 68.262 37.434 105.70
0 73.167 51.301 124.47
0 53.328 30.3 83.63
0 70.29 39.05 109.34
0 265.047 158.085 423.13
FUEL COST TOTAL FUEL COST TOTAL ALL COST
Rp 12,500.00 Rp 4,010,914.05 Rp 8,385,914.05
Rp 12,500.00 Rp 4,817,803.03 Rp 10,567,803.03
Rp 12,500.00 Rp 3,680,953.87 Rp 8,905,953.87
Rp 12,500.00 Rp 8,658,904.11 Rp 19,458,904.11
Rp 12,500.00 Rp - Rp 6,048,000.00
Rp 12,500.00 Rp - Rp 6,216,000.00
Rp 12,500.00 Rp - Rp 5,796,000.00
Rp 12,500.00 Rp - Rp 5,880,000.00
Rp 71,258,575.06
FUEL RATIO
18.34
16.76
14.09
28.86 20404.00
FUEL RATIO
7.34
8.41
6.06
7.81
PT. GUNUNG SAMUDERA INTERNASIONAL
BELANJA HARIAN
Total Rp 9,610,000
PT. GUNUNG SAMUDERA INTERNASIONAL
OPERSASIONAL/ HSE
TOTAL Rp 19,693,500
Rp 17,056,500