You are on page 1of 1

March 14, 2015

Engr. Robie Murallon


Operations Manager
Global Enginery Technicians, Inc.
Victoria Wave-Special Economic Zone, Mt. Apo Building, Brgy. 186,
North Caloocan City
Metro Manila Philippines 1474

Dear Sir:

The Certificates of Analysis and Interpretations for the samples received last February 27, 2015 for the
Water Quality Monitoring of GLOBAL ENGINERY TECHNOLOGIES, INC. are hereby submitted .

The summary of the results in tabulation form is also presented for your easy comparisons and
evaluations. The comparisons of the results of the samples received last November 19, 2014, December
1, 2014 and December 12, 2014, December 29, 2014, January 18, 2015 , February 1, 2015 , February 14,
2015 and February 27, 2015 are presented to see the trending of the parameters. Graphs of the results
are also presented. The WQI ratings of all the sampling sites are also presented. The confidence interval
of the parameters in all sampling sites are also presented.

We hope that everything is clear and in order.

Thank you very much.

Truly yours,

Engr. Aladino M. Abulencia


General/Technical Manager

You might also like