You are on page 1of 33
& NEW SERVICEABLE USED O Part.-No.: 98D56003001000 [DORE EA [Oty: 1,000 Serial-No.: EXG01082 [Manufacturer code: FB365 Description: WINDSHIELD INSPECTION Date manufactur: 01.08.2020 Receipt-No.: 204VTLO150 Country of orig’ France —— | [Receipt date: 13.08.2020 Shelf life expiration date: Total a CBO/TBO: CSO/TSO: Total cycles: Flight hours: Reason for removal: Removed from: Date removed: Work performed: RepairO Modi ficationO TestO Overhaul 0 ORDER No.: InspectionO Shelf lifeD Periodic check( others,see remarks) a ||Renarks? n 2 CULOS & é 43.08.2020 Date FRANCE Our References: DCE-20-XPU-00880-B ent EC / EU - Declaration of Conformity The S.A.S EXCENT FRANCE, 2 Avenue Léon Foucault - ZAC du Perget, 31770 COLOMIERS declares that the new working equipment designated below: WINDSHIELD INSPECTION Ref: 98D56003001000 SN: EXC01082 Complies with the regulations established by the Decree of 2008-1156, 7 November 2008 on work equipment, and fulfils all the provisions of the European Directive 2014/35/EU Low Volt, the European Directive 2011/65/EC RoHS2, the European Directive 2018/19/EU WEEE and the European Directive 2014/30/EU Electromagnetic Compatibility subject. Person in charge of the technical file: SATAIR Done at Colomiers, the 05/08/2020 Vianney DELUGEAU Product Quality Engineer : GSE/Tool User Guide 98D56003001000/001 | oRIGINAL VERSION (ENGLISH LANGUAGE) @ AIRBUS GSE/WINDSHIELD INSPECTION 98D56003001000 / 001 iS REACH Compliant FOR DETAILS REFER TO DoC Doc. issue: G GSEMWINDSHIELD INSPECTION Page 1 of 28 (© ARBUS SAS. 2017, ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT (C80_GSE User Guide_FM1606103_v1.0 Released on 28 Jan 2021 PIN: GSE/Tool User Guide 98D56003001000/001 | ORIGINAL VERSION (ENGLISH LANGUAGE) @ AIRBUS Document Validation Company Department Date Made by SGA BP2 05/04/2019 Checked by SGA BP2 05/04/2019 Validated by AIRBUS SEMSD 29/05/2019 Record of Revisions Reference of the Issue Date Affected Page(s) Reason for revision document used A 05/04/19 ALL Initial Issue GIM_FM1606103 B 07/08/19 7-17 & 18 Pictures updated GIM_FM1606103 c 21/08/19 3-23 & 24 New appendix added | GIM_FM1606103 New tape reference and | GIM_FM1606103 D_ | 05/03/2019 All ipaecueMnent E | 25/03/2020 ALL Procedure improvement | GIM_FM1606103 F | 15/05/2020 ALL Harness modification | GIM_FM1606103 - CE logo updated GIM_FM1606103 G_ | 27/01/2021 184 - §1.2.B “First Use Date” added Doc. issue: G GSE/WINDSHIELD INSPECTION Page 2 of 28 ‘®AREUS 4°, 2017, ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT C80_GSE User Guide_FM1606103_v1.0 Released on 28 Jan 2021 nn GSE/Tool User Guide 98D56003001000/001 | oIGINAL VERSION (ENGLISH LANGUAGE) @ AIRBUS Doc. issue: G [ GSE/WINDSHIELD INSPECTION Page 3 of 28 Released on 28 Jan 2021 (© ARBUS SAS, 2017, ALL RIGHTS RESERVED, CONFIDENTIAL AND PROPRIETARY DOCUMENT C80_GSE User Guide_FM1606103_v1.0 r PIN: 98D56003001000/001 | oRIGINAL VERSION (ENGLISH LANGUAGE) GSE/Tool User Guide | @ AIRBUS 1 ONonE Document Validation Record of Revisions . Prerequisites 1.1. General information . 1.2 Warning and caution 2 + GSE/Tool setup 2.1 Before use .. 2.2 Customer checklist. 2.3. Packing checklis' 2.4 Zone of use (aircraft location). 3. GSE/Tool Usage. 3.1. GSE/Tool description 3.2 Personal protective equip! 3.3. Conditions 3.4 Assembly procedure 3.4.1. Assembly procedure for dielectric tes' 3.4.2 Assembly procedure for insulation test . 3.5 GSE/Tool usage during maintenance task GSE/Tool usage during dielectric test 3.5.2 GSE/Tool usage during insulation tes' 3.6 Disassembly procedure. 3.7. Trouble shooting Test & Maintenance Handling/Storage 3.5.1 End of life Appendices . Glossary ... Table of Contents of use... Doc. issue: G [ GSEMWINDSHIELD INSPECTION Page 4 of 28 (C80_GSE User Guide_FM1606103_v1.0 (© AIRBUS SAS, 2017, ALL RIGHTS RESERVED, CONFIDENTIAL AND PROPRIETARY DOCUMENT Released on 28 Jan 2021 PIN: GSE/Tool User Guide @ AIRBUS 98D56003001000/001 | oRIGINAL VERSION (ENGLISH LANGUAGE) 1 Prerequisites 1.1. General information All following instructions are only applicable for GSE/Tool P/N 98D56003001000/001. This GSE/Tool User Guide must be read in conjunction with the appropriate Aircraft documentation. In case of conflicting documents please contact AIRBUS. Before using or mounting the GSE/Tool, read this GSE/Tool User Guide carefully and ensure that all content is well understood. Non-compliance with the instructions can lead to personal injury or material damage and excludes any warranty. The GSE/Tool is delivered by the manufacturer ready for assembly. Before GSE/Tool assembly, a visual inspection and crosscheck with tool packing list (see Chapter 5) shall be performed to ensure there are no missing or damaged parts. During GSE/Tool life cycle, follow the maintenance intervals set out in the maintenance instructions (see Chapter 4), except where: - Visual inspection calls for immediate action; - Unforeseen conditions necessitate more frequent servicing. 1.2. Warning and caution A. General The GSE/Tool P/N 98D56003001000/001 is designed to meet specific conditions of use and to fulfil a defined function (described into this user guide). Any other use/action than that given in this user guide will be under users/operators responsibility (except in case of specific request coming from Airbus). B. First use date The operator shall note below the date of the 1% use of the GSE/Tool P/N 98D56003001000. This date will be the reference (starting date) for Chapter 4 “Calibration / periodical check”, First Use Date Doc. issue: G GSEMINDSHIELD INSPECTION Page 5 of 28 ‘© AROUS SS, 2017, ALL RIGHTS RESERVED, CONFIDENTIAL AND PROPRIETARY DOCUMENT €80_GSE User Guide_FM1606103_v1.0 Released on 28 Jan 2021 PIN: GSE/Tool User Guide @ AIRBUS 98D56003001000/001 | oRIGINAL VERSION (ENGLISH LANGUAGE) C. Icons \ i VST Te) : To be compliant with regulation 2012/19/EC - Do not dispose Electric Aon and Electronic Equipment w CO he cy D. Safety precautions Ensure safe working practices when handling the GSE/Tool. GSE/Tool shall be used only by an authorized and competent person who fully understands the content of this user guide. Always follow the procedures described in this user guide and the related Airbus maintenance tasks. The user shall ensure that: ° The GSE/Tool is only used for the function it has been designed for, as described in this user guide; e The GSE/Toolis in proper working conditions and that the applicable safety devices are checked for functional reliability; e Required personal protective equipment (PPE) for the GSE/Tool users are available and being used; e Only qualified personnel is in charge of handling, operating, maintaining and repairing the GSE/Tool; ¢ All attached safety and warning notices will not be removed and are legible. A WARNING: « A dangerous voltage up to 5 KVAC or 6 KVDC can be applied to the HV instrument outputs during the test. Therefore special safety consideration must be taken when performing this test! e Onlya skilled person familiar with hazardous voltages can perform this measurement! . pone perform this test if any damage or abnormality (test leads, instrument) is note e Never touch exposed probe tip, connections equipment under test or any other energized part during the measurements. e Make sure that NOBODY can contact them either! e DO NOT touch any part of test probe in front of the barrier (keep your fingers behind the finger guards on the probe) — possible danger of electric shock! FOR any Information, refer to manufacturer user manual CA.6165. Doc. issue: G GSE/WINDSHIELD INSPECTION Page 6 of 28 ‘© AIRBUS 88,2017 ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT (©80_GSE User Guide_FIM1606103_y1.0 Released on 28 Jan 2021 PIN: GSE/Tool User Guide @ AIRBUS 98D56003001000/001 | oRIGINAL VERSION (ENGLISH LANGUAGE) E. EC Directives This GSE/Tool is manufactured in accordance with the following European Directives: « Electromagnetic Compatibility 2014/30/EU e Low Voltage 2017/35/EU e Waste Electric & Electronic Equipment 2018/19/EC « ROHS2 2011/65/EC Before use, the user shall ensure that GSE/Tool is in conformity with local legislation if used outside of the EU. Doc. issue: G GSEMINDSHIELD INSPECTION Page 7 of 28 ‘© AIRBUS S.A, 2017, ALL RIGHTS RESERVED, CONFIDENTIAL AND PROPRIETARY DOCUMENT C80_GSE User Guide_FM1606103_v1.0 Receeedon caer ane PIN: GSE/Tool User Guide @ AIRBUS 98D56003001000/001 | oRIGINAL VERSION (ENGLISH LANGUAGE) 2 GSE/Tool setup 2.1 Before use Connect multi-function equipment tester (item 708) to an external electrical source (200V AIC). External power source must be grounded > > Check that values registered in auto sequence of multifunction equipment tester (item 708) are in accordance with value indicated in Technical Adaptation or Airbus Procedure insulation test procedure. For this purpose, follow this process: « Select Auto Sequences program on touch screen e Check values e Operator can use the electrical device in manual mode. Please refer to CA 6165 user manual for any information. Doc. issue: G GSE/WINDSHIELD INSPECTION Page 8 of 28 ‘© AIRBUS 8S, 2017, ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY COCUMENT (C80_GSE User Guide_FM1606103_v1.0 Released on 28 Jan 2021 PIN: 98D56003001000/001 Sean eoenteasiatanse | @ AIRBUS * Before using the GSE/Tool, be sure that you hav 2.2 Customer checklist a CE declaration for the GSE/Tool (if applicable), a CE declaration for the standard items of the GSE/Tool (if applicable), a certificate of conformity, a GSE User Guide, periodical test results (if applicable), 2 = o E E 3 ° a AMM, SB, SRM and/or TSM task relevant to the use of the GSE/Tool. ¢ A manufacturer's plate shall be placed on the GSE/Tool. It must include: []___ the name and country of the manufacturer, [1___ the GsE/Too! part and serial numbers, O the date of manufacture, the regulatory "CE" marking, the weight of the GSE/Tool, the MLL. of the GSE/Tool, the design issue of the GSE/Tool, if the GSE/Tool is mobile, its maximum speed. Doc. issue: G GSEMINDSHIELD INSPECTION | Page 9 of 28 (© ARBUS 8 AS. 2017, ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPREETARY COCUMENT C80_GSE User Guide_FM1606103_v1.0 Released on 28 Jan 2021 PIN: 98D56003001000/001 GSE/Tool User Guide ORIGINAL VERSION (ENGLISH LANGUAGE) @® AIRBUS 2.3 Packing checklist 98D56003001000: LOWER LEVEL fos Item Description P/N Quantity 108 HARNESS SA 98D56003001108 1 703 POWER CABLE CA6165-A 4 704 ADHESIVE COPPER AT528 4 706 HIGH VOLTAGE CABLE CA6165-A 2 MULTI FUNCTION 708 | EQUIPMENT TESTER CAB165-A 1 713 CABLE PLUG ADAPTER B4-I/KA 4 714 INSULATION CONTROLER CA6524 1 98D56003001001: Item Description P/N Quantity 110 HARNESS LR/ WB 98D56003001110 4 106 | STORAGE BAG 98D56003001106 4 Doc. issue: G GSEMINDSHIELD INSPECTION Page 10 of 28 C80_GSE User Guide_FM1606103_v1.0 ‘© ARBUS 8S. 2017, ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT Released on 28 Jan 2021 PIN: GSE/Tool User Guide 98D56003001000/001 | oRicINAL VERSION (ENGLISH LANGUAGE) @ AIRBUS | 2.4 Zone of use (aircraft location) —— Doc. issue: G GSEMWINDSHIELD INSPECTION | Page 11 of 28 ‘© ARBUS 6S, 2017, ALL RIGHTS RESERVED, CONFIDENTIAL AND PROPRIETARY DOCUMENT C80_GSE User Guide FM1606103_v1.0 Released on 28 Jan 2021 PIN: GSE/Tool User Guide © AIRBUS 98D56003001000/001 | opiGINAL VERSION (ENGLISH LANGUAGE) 3 GSE/Tool Usage 3.1. GSE/Tool description GSE/WINDSHIELD INSPECTION 98D56003001000 98D56003001001 PIN Manufacturer name * Year of construction - This tool is used to perform dielectric and insulation test on windshield Essential function Secondary function . GSE/Tool weight 98D56003001000: 29 kg Unit: kg 9805600301001: 1 kg GSE/TooI dimensions 4 98D56003001000: 645 x 508 x 368 mm (engi Wet x Heh) 9818600300101: 271x202x50 mm Unit: mm MLL. Unit: kg : 98D56003001000: Electric (AIC:220V)/Battery ‘Type of energy used by this GSE/Tool i a Number of persons required to use this GSE/Tool| 1 ‘The tool will be used for a maintenance task in Working environment an environment provided for this purpose GSE/Tool storage box PIN 98D56003001104 GSEfTool storage box dimensions (Length x Width x Height) 645 x 508 x 368 mm Unit! mm Doc. issue: G GSE/WINDSHIELD INSPECTION Page 12 of 28 (© ARBUS SAS, 2017, ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT C80_GSE User Guide FIM1606103 v1.0 Rel on 28 Jan 2021 PIN: GSE/Tool User Guide 98D56003001000/001 | oRIGINAL VERSION (ENGLISH LANGUAGE) @ AIRBUS GSE/Tool storage box PIN 98D56003001106 GSE/Tool storage box dimensions (Length x Width x Height) 271x202x50 mm Unit: mm 9 @ 3.2. Personal protective equipment N/A Doc. issue: G GSE/WINDSHIELD INSPECTION Page 13 of 28 ‘© AIRDUS SAS. 2017, ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY COCUMENT C80_GSE User Guide FM1606103_ v1.0 Released on 28 Jan 2021 PIN: GSE/Tool User Guide @ AIRBUS 98D56003001000/001 | ORIGINAL VERSION (ENGLISH LANGUAGE) 3.3. Conditions of use Condition Details/Limits Environment of use Inside - External power needed? YES Electric source A/C 220V grounded Operating temperature range - 57+ 50° : 3.4 Assembly procedure 3.4.1. Assembly procedure for dielectric test Step 1: Plug harness on windshield connector Note: e Use harness 98D56003001108 for SA application from variant 98D56003001000 e Use harness 98D56003001110 for LR / WB application from variant 98D56003001001 Doc. issue: G GSE/MWINDSHIELD INSPECTION [ Page 14 of 28 ‘© ARBUS SAS. 2017, AL RIGHTS RESERVED, CONFIDENTIAL AND PROPRIETARY OOCUMENT C80_GSE User Guide_FM1606103_v1.0 Rel ‘on 28 Jan 2021 PIN: GSE/Tool User Guide @ pens | 98D56003001000/001 | ORIGINAL VERSION (ENGLISH LANGUAGE) Step 2: Tape cable plug adapter (item 713) on Windshield Z-bar using adhesive copper (item 704) dedicated for this purpose as shown on picture below. Adhesive tape A Note: Take particular care when positioning the adaptor on the Z-bar and insure | that it's positioned as shown in the picture and sketch above to avoid any wrong measurement. To avoid connector displacement during measurement it is recommended to well tape the connector item 713 on the Z-Bar with tape item 704 (see below picture) and to maintain the cable item 706 on the windshield with tape item 704 (see sketch above) Refer to Technical Adaptation or Airbus Procedure preparation for external connection to windshield Z bar procedure to define Z bar area where item 713 must be taped. Doc. Issue: G GSE/MWINDSHIELD INSPECTION Page 15 of 28 ‘®AVRBUS &.AS. 2017 ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT C80_GSE User Guide FM1606103_v1.0 Released on 28 Jan 2021 PIN: GSE/Tool User Guide | @ ainBUS 98D56003001000/001 | ORIGINAL VERSION (ENGLISH LANGUAGE) Step 3: Connect first High voltage cable (item 706) between 1 socket of Harness (item 108 or 110) and red terminal of multi-function equipment tester (item 708) Step 4: Connect second High voltage cable (item 706) between cable plug adapter (item 713) and blue terminal of multi-function equipment tester (item 708) Blue terminal Red terminal NOTE: Connection can be switched without impact on test performed. Cable plug adapter WINDSHIELD Windshield connector {item 713) Harness (item 100 or 102) Harness socket High voltage cable (item 706) Red terminal EXTERNAL ELECTRICAL SOURCE blue terminal DIELECTRIC TEST INSTALLATION Doc. issue: G GSEMINDSHIELD INSPECTION [ Page 16 of 28 ‘© AIRBUS SAS, 2017. ALL RIGHTS RESERVED, CONFIDENTIAL AND PROPREETARY DOCUMENT (C80_GSE User Guide_FM1606103_v1.0 Released on 28 Jan 2021 98D56003001000/001 | oRIGINAL VERSION (ENGLISH LANGUAGE) PIN: GSE/Tool User Guide | @ AIRBUS 3.4.2. Assembly procedure for insulation test Step 1: Plug harness on windshield connector Note: e Use harness 98D56003001108 for SA application e Use harness 98D56003001110 for LR / WB application Doc. issue: G GSEMWINDSHIELD INSPECTION Page 17 of 28 (© AROUS 6.4.8, 2017, ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT (C80_GSE User Guide_FM1606103_v1.0 Rek on 28 Jan 2021 PIN: GSE/Tool User Guide @ AIRBUS 98D56003001000/001 | oRIGINAL VERSION (ENGLISH LANGUAGE) Step 2: Tape cable plug adapter (item 713) on Windshield Z-bar using adhesive copper {item 704) dedicated for this purpose as shown on picture below. ‘Windshield Adhesive tape Dow Take particular care when positioning the adaptor on the Z-bar and insure that it's positioned as shown in the picture and sketch above to avoid any wrong measurement. To avoid connector displacement during measurement it is recommended to well tape the connector item 713 on the Z-Bar with tape item 704 (see below picture) and to maintain the cable item 706 on the windshield with tape item 704 (see sketch above) Refer to Technical Adaptation or Airbus Procedure preparation for external connection to windshield Z bar procedure to define Z bar area where item 713 must be taped. Note: if the tape is removed due to bad positioning during the manipulation, don't reuse it but has to be replace by a new piece Doc. issue: G GSE/WINDSHIELD INSPECTION Page 18 of 28 {© AUS 6.45, 2017. ALL RIGHTS RESERVED, CONFIDENTIAL AND PROPRIETARY DOCUMENT C80_GSE User Guide_FM1606103_v1.0 Ret on 28 Jan 2021 PIN: GSE/Tool User Guide 98D56003001000/001 | ORIGINAL VERSION (ENGLISH LANGUAGE) @ AIRBUS Step 3: Connect first High voltage cable (item 706) between 1 socket of Harness (item 108 or 110) and insulation tester (item 714) terminal Step 4: Connect second High voltage cable (item 706) between cable plug adapter (item 713) and insulation tester (item 714) terminal Terminal 2 Terminal 1 NOTE: Connection can be switched without impact on test performed, Cable plug adapter WINDSHIELD Windshield connector (item 713) Harness (item 108 or 110) Harness socket High voltage cable {item 706) Terminal 1 Terminal 2 INSULATION TEST INSTALLATION Doc. issue: G GSE/WINDSHIELD INSPECTION Page 19 of 28 ‘© AIRBUS S.A, 2017 ALL FIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT C80_GSE User Guide FM1606103_v1.0 Released on 28 Jan 2021 PIN: GSE/Tool User Guide @ AIRBUS 98D56003001000/001 | oRiGINAL VERSION (ENGLISH LANGUAGE) 3.5 GSE/Tool usage during maintenance task 3.5.1 GSE/Tool usage during dielectric test NOTE: The test must be performed on each socket of harness Step 1: Check that multi-function equipment tester is connected to high voltage cable according to assembly procedure described in chapter 3.4.1. Step 2: Switch on the multi-function equipment tester Step 3: Select Auto Sequences program on touch screen Doc. issue: G L GSE/WINDSHIELD INSPECTION Page 20 of 28 (© AIRBUS 6.48, 2017 ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT C80_GSE User Guide_FM1606103_v1.0 Rel on 28 Jan 2021 RIN: GSE/Tool User Guide 98D56003001000/001 | oRIGINAL VERSION (ENGLISH LANGUAGE) @ AIRBUS Step 5: Enter password: 1234 Step 6: Touch play symbol ei again to launch procedure Step 7: Timer is launch according to Technical Adaptation or Airbus Procedure dielectric test procedure, Please wait until the end of time. ' 0.0ma u 1550v 0.0ma tc v O.0ma Time: 57 [AN Timer First stage is over. Touch next symbol | >» | to complete the report. Step 8: Touch HV AC symbol to read the report. 696447A00 DIELECTRIC TEST 004 | v Doc. issue: G GSE/WINDSHIELD INSPECTION Page 21 of 28 (© AROUS SAS, 2017, ALL RGHTS RESERVED, CONFIDENTIAL AND PROPRIETARY COCUMENT (C80_GSE User Guide_FM1606103_v1.0 Released on 28 Jan 2021 PIN: GSE/Tool User Guide @ AIRBUS 98D56003001000/001 | oRIGINAL VERSION (ENGLISH LANGUAGE) Fulfil manually reporting sheet provided in Technical Adaptation or Airbus Procedure. Note: if the results of the measurements is ‘> 100GOhms’ or ‘0 mA’, the reason may be that the positioning of the adaptor is not correct. Check the positioning of the adaptor on the Zbar and perform again the measurement Step 10: e Unplug high voltage cable (item 706) from harness socket and plug it to the other socket. e Follow same procedure from step 2 Doc. issue: G GSEMWINDSHIELD INSPECTION [ Page 22 of 28 (© ARBUS SAS, 2017, AL. RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT C80_GSE User Guide FM1606103_v1.0 Rel on 28 Jan 2021 PIN: GSE/Tool User Guide @ AIRBUS 98D56003001000/001 | ORIGINAL VERSION (ENGLISH LANGUAGE) 3.5.2. GSE/Tool usage during insulation test Step 1: Check that insulation controller is connected to high voltage cable according to assembly procedure described in chapter 3.4.2. Step 2: Select tension defined in Technical Adaptation or Airbus Procedure insulation test procedure with switch button Test button Switch button Step 3: Press Test button until trigger. Timer start according time define in Technical Adaptation or Airbus Procedure insulation test procedure. Note: the equipment has to be reset each time after switch off /on (timer) Step 4: Fulfil manually reporting sheet provided in Technical Adaptation or Airbus Procedure insulation test procedure. 3.6 Disassembly procedure To remove the GSE/Tool, follow the reverse installation procedure 3.7 Trouble shooting In case of problems with standard parts (commercial of the shelf) refer to operating instruction of standard part manufacturer. In case of any GSE/Tool issues, please contact: Maintenance Planning & GSE Services Customer Service Airbus S.A.S 1 rond point Maurice Bellonte 31707 Blagnac Cedex France #] maint.gsetools@airbus.com Doc. issue: G GSE/WINDSHIELD INSPECTION Page 23 of 28 (© AIRBUS 8,A8, 2017, ALL RIGHTS RESERVED, CONFIDENTIAL AND PROPRIETARY DOCUMENT C80_GSE User Guide_FM1606103_v1.0 me paca soai PIN: GSE/Tool User Guide @ AIRBUS 98D56003001000/001 | oRIGINAL VERSION (ENGLISH LANGUAGE) | 4 Test & Maintenance A. Calibration Electrical devices (Multi-function equipment tester (item708) and insulation controller (item 714) must be calibrated each year. For any detail, please contact electrical device supplier. B. Periodical Test Each year for electrical device C. Servicing & Maintenance Servicing and maintenance must be done before each use, with the GSE/Tool uninstalled and in a rest configuration. Servicing and maintenance shall consist of: - Verifying the proper conditions of working of the GSE/Tool. - Checking periodic tests have been performed (when applicable) - Checking calibration has been performed (when applicable) - Greasing parts (when applicable) - Cleaning parts (when applicable) D. Maintenance Schedule N/A E. Specific maintenance N/A Doc. issue: G GSEMWINDSHIELD INSPECTION [ Page 24 of 28 (© AIRBUS SAS. 2017, ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT (C80_GSE User Guide FM1606103_ v1.0 Released on 28 Jan 2021 98D56003001000/001 | ORIGINAL VERSION (ENGLISH LANGUAGE) PIN: GSE/Tool User Guide | @ AIRBUS 5 Handling/Storage A. Handling 98D56003001000: This GSE can be handled by one person. To lift this GSE in rest configuration, two persons are necessary. 98D56003001001: This GSE can be handled by one person. B. Storage Before storing, refer to “Packing checklist" (chapter 2.3) in order to verify the availability of all items which shall be part of the GSE/Tool P/N 98D56003001000/001. Whenever possible, keep the GSE/Tool in its original box for storage. When unused, the GSE/Tool shall be stored in a clean dry and ventilated room in order to avoid mechanical, chemical or even humidity damages. Do not store the GSE/Tool near corrosive fluids or near heat or ozone sources. 6 End of life WARNING To be compliant with regulation 2012/19/EC - Do not dispose and Electronic Equipment was! Doc. issue: G GSE/MWINDSHIELD INSPECTION [ Page 25 of 28 (© AIRBUS GAS, 2017, ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPREETARY DOCUMENT (C80_GSE User Guide_FM1606103_v1.0 Released on 26 Jan 2021 98D56003001000/001 | oRIGINAL VERSION (ENGLISH LANGUAGE) PIN: GSE/Tool User Guide @ AIRBUS 7 Appendices TA endix 1: Periodical test sample ;| Company in charge of tests Company: Name Address Address Location: Name Address Address | Equipment Name of manufacturer : P/N Date of manufacture ML. Static load tests MLL. (kg) Proof test factor Test time (min) Load applied xX XX XX XxX Mean(s) used for test performing: | Proof test performed in the presence of: | Function: Result of proof test without failure. No permanent deformation was observed. We, the undersigned, certify that this working equipment has undergone the proof tests Dates _/_/_ Signature: Inspectors: Doc. issue: G GSE/WINDSHIELD INSPECTION | Page 26 of 28 ‘© ARBUS SAS, 2017, ALL RIGHTS RESERVED, CONFIDENTIAL ANO PROPRIETARY DOCUMENT (C80_GSE User Guide_FM1606103_v1.0 Released on 28 Jan 2021 PIN: GSE/Tool User Guide @ AIRBUS | 98D56003001000/001 | oRIGINAL VERSION (ENGLISH LANGUAGE) 7.2 Appendix 2: Troubleshoot procedures How to set up DIELECTRIC TEST as default sequence In case the Dielectric Test does not appear in the Auto Sequences menu (here, it shows Demo files), please apply following sequence: 1) Inthe Main menu, select General settings: Con & bho) Con creed 3) The default program is shown with a blue marker. To define the Dielectric Test as default, select it in the menu (1) and press the button (2). Standard sequence can now be applied 4) The tool is now configured and ready for the test Doc. issue: G GSE/WINDSHIELD INSPECTION | Page 27 of 28 ‘© AIRBUS 88,2017, ALL RIGHTS RESERVED. CONFIDENTIAL ANO PROPRIETARY OOGUMENT ‘C80_GSE User Guide_FM1606103_v1.0 Released on 28 Jan 2021 RN GSE/Tool User Guide 98D56003001000/001 | oRIGINAL VERSION (ENGLISH LANGUAGE) @ AIRBUS 8 Glossary AC Aircraft AMM Aircraft Maintenance Manual GSE Ground Support Equipment N/A Not Applicable PIN Part number Doc. issue: G GSEMWINDSHIELD INSPECTION Page 28 of 28 ‘© AIRBUS S.A, 2017, ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUNENT ‘C80_GSE User Guide_FM1606103_v1.0 Released on 28 Jan 2021 AIRBUS Distribution List ‘REFERENCE GIM 90032452 1ssuE GOO bare 28 Jan 2021 GIM_98D56003001000 Distribution List MANUAL DISTRIBUTION LIST wogse@sonovisiongroup.com maint.gsetools@airbus.com programs. gsetools@airbus.cc com Repair2@hydro.aero Tooling-Biberach@hydro. aero contact. airbus@groupe-Ipf.com ranzoli.x@ecagroup.com Repair2@hydro. aero Tool. repair@airbus. com procurements tools@airbus.co com capra.g@ecagroup.com distribution.gse@airbus.com gserequest@excent.fr ‘©ARBUS S.A. 2021, ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT. Released on 28 Jan 2021 AIRBUS Distribution List REFERENCE GIM_90092452 Issue G00 are 28 Jan 2021 wogse@sonovisiongroup.com maint.gsetools@airbus.com programs.gsetools@airbus.com Repair2@hydro.aero Tooling-Biberach@hydro.aero Tool.repair@airbus.com procurement.tools@airbus.com julio.ortiz@groupedcm.com contact.airbus@groupe-Ipf.com capra.g@ecagroup.com gse.technic@ecagroup.com wogse@sonovisiongroup.com maint.gsetools@airbus.com programs.gsetools@airbus.com Repair2@hydro.aero Tooling-Biberach@hydro.aero Tool.repair@airbus.com procurement.tools@airbus.com julio.ortiz@groupedem.com contact.airbus@groupe-Ipf.com capra.g@ecagroup.com gse.technic@ecagroup.com distribution.gse@airbus.com gserequest@excent.fr wogse@sonovisiongroup.com ‘©AROUS S.A 5, 2021. ALL RIGHTS RESERVED, CONFIDENTIAL AND PROPRIETARY DOCUMENT, Released on 28 Jan 2021 AIRBUS Distribution List ‘REFERENCE GIM_90032452 1ssue G00 pare 28 Jan 2021 maint.gsetools@airbus.com programs.gsetools@airbus.com Repair2@hydro.aero Tooling-Biberach@hydro.aero Tool.repair@airbus.com procurement.tools@airbus.com contact.airbus@groupe-Ipf.com capra.g@ecagroup.com gse.technic@ecagroup.com ‘@AIRBUS 8 AS, 2021. ALL RIGHTS RESERVED, CONFIDENTIAL AND PROPRIETARY DOCUMENT, Released on 28 Jan 2021

You might also like