You are on page 1of 3
‘ved Quai Over ARAMCO Qualification Tests QM31 — Heat Exchanger Q.01) What precautions should be taken prior to welding the base metal in a cladded joint? Q.02) Q.03) Q.04) Q.05) 9.06) Q.07) Q.08) Welding on a low temperature pressure vessel, which is the following are important? a) the inter-pass temperature is not exceeded. b) the specified preheat temperature is achieved before welding attachments. c} the welding machine is calibrated. d) all of the above, The manufacturer of a pressure vessel built to ASME VIll, Div. 1, must have a formal quality system meeting the requirements of : a) ASME VIll, Div. 1. b) 'SO 9001. ¢) ISO 9002. d) none of the above. e) all of the above. sit acceptable to carry out a hydrostatic test after the primer coat of an ASME Vill, Div. 1 pressure vessel is applied? In the case of a pressure test of an austenitic stainless steel pressure vessel, what is the crit difference to be considered when compared with carbon steel vessel? ‘TRUE or FALSE : It is acceptable to perform the final code acceptance hydrostatic test before. WHT. ‘What document does ASME Vill require for a two piece head that was weld fabricated by another company? Describe two common types of header boxes. Page 1 of 3 atte eld ity eer ARAMCO Qualification Tests QM31 - Heat Exchanger Q.09) Fora U Tube Heat Exchanger made to TEMA rules, what is the governing specification for the Q.10) Q.11) Q.12) Q.13) Qi4) Q.15) Q.16) Q.17) Q.18) design and construction of the shell? What is the difference between a “G finned” and an “Extruded finned” tube? \s a hydrostatic pressure test required for all ASME Vill, Div. 1 Heat Exchangers? How are both straight and U-Tube lengths measured (Not measuring device)? What does T.E.M.A. stand for? What is the requirement on tube end projection (from tubesheet)? What is allowable internal nozzle projection? Name two U.S. Industry Standards apply to Air Cooled Heat Exchangers? List two classes of Exchangers are covered by T.E.M.A. Who is responsible for inspection in accordance with T.E.M.A.? Poge 2 of 3 Valued Quality Detvered, ARAMCO Qualification Tests QM31 — Heat Exchanger Q.19) T.E.M.A. requires the manufacturer to inspect for quality in accordance with what code / Q.20) Q.21) Q.22) Q,23) Q.24) Q.25) Q.26) standard? What is the minimum bolt diameter for end flange? Name two American National Standards that apply to Shell and Tube Heat Exchangers? What is the difference between a Forced and Induced draft Exchanger? API 661 requires flange dimensions and facings to be in accordance with what US Industry ‘What types of random tests are performed on tubes after fining to check the quality of the fining operation? What is the minimum duration of a pressure test of an Air-Cooled Heat Exchanger? Name three types of Heat Exchangers? Page 3 of 3

You might also like