Professional Documents
Culture Documents
To obtain a correct rollup for a batch quantity, the accounting cost quantity, the bill of
material batch size and the routing batch size must match as it includes:-
Labor and overhead costs only when the accounting cost quantity matches the routing batch size.
Material costs only when the accounting cost quantity matches the bill of material batch size.
If the Cost Simulation program (R30812) does not find a bill of material for which the batch
quantity matches the accounting cost quantity, it uses the zero batch bill. [5]
Opening L/C:- Before sending Pro Forma Invoice or indent to open L/C, purchaser checks all
particulars of PF|/indent. Upon receipt of PFI or indent, operation team open L/C. Operation
team open L/C as per Standard Operation Procedure of L/C opening[report]
6)