You are on page 1of 1

PRODUCED BY AN AUTODESK STUDENT VERSION

PROP. FRONT
ELEVATION
FUTURE ROO
F

J H G1 G F1 F E1 E D1 D C1 C B2 B1 B A1 A

LVL.+430

FIRST FLOOR
LVL.+315
LVL.+315 LVL.+315 +6850 AS/SITE

LVL.+315
LVL.+430

LVL.+430

LVL.+430

LVL.+430
LVL.+315

LVL.+315
LVL. ±00 LVL. ±00

LVL.+315

LVL.+315
LVL. ±00
LVL. ±00
LVL. ±00

GROUND FLOOR
±00 LVL

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION

ROAD LVL
-450 LVL AS/SITE

ELEVATION-B

PROP. FRONT 2

ELEVATION 1

NO. Revision / Issue Date

8 7a 7 6a 6 5a 5 4a 4 3a 3 2 1b 1a 1 Project :

BAWAL
B.O.Beam Second Floor
LVL +13850
Client :

M/s BPS STRUCTURES PVT. LTD.

Drawing Title :
ELEVATIONS
FIRST FLOOR
R.S. +6850 AS/SITE

Architect

studio
LINEDESIGN
PROJECTS LLP
B-2/33, Lower Ground Floor Safdarjung Enclave,New Delhi-110 029
RS RS
GROUND FLOOR Tel. : 91-11-4082 0008, 4082 0009, Email : support@studiolinedesign.com

±00 LVL

ROAD LVL
-450 LVL AS/SITE Consultant

ELEVATION-A

Drawn By: Date : Scale :

BHUPENDER 31-05-2021 NTS

Designed By: JOB NO.

G.VARMANI 250
Checked By: Drawing No.

K.KHAN A-3.1

PRODUCED BY AN AUTODESK STUDENT VERSION

You might also like