Government of Nepal

National Reconstruction Authority


Central level Project Implementation Unit (Education)
Project: Emergency School Reconstruction of CHANDRA JYOTI SECONDARY SCHOOL (3 storey 9 Classrooms)
Project Location: Bidur Municipality-7, Pipaltar, Nuwakot
Contractor: Gaura Khani JV Prepared By: Manoj Poudel
Bar Bending Schedule for footing
S No. Description Shape of Bar Diameter(mm) Number Cutting Length(mm) Sets Wt. per unit Length(kg/m) Total weight(kg) Remarks

100 100
16 8 1900 3 1.58 72.06
Foundation pad for Isolated
1 1700
footing, F1 at grid A3, B3, E3

100 100 16 8 1900 3 1.58 72.06


1700

240 240 16 37 2580 3 1.58 452.55


2100

240 240 16 10 7580 3 1.58 359.35


7100

240 7100 240 20 12 5360 3 2.47 476.44


Foundation pad and Chairs for
3 Combined footing, CF1 at grids
B1-B2, C1-C2, D1-D2

240 2100 240 16 37 2580 3 1.58 452.55

600

500 500 1 no. of chair bar


12 15 2500 3 0.89 100.00 is provided for 1
450 m^2 area
450
240 240 16 37 2180 2 1.58 254.93
1700

240 240 16 8 7580 2 1.58 191.65


7100

240 7100 240 20 10 7580 2 2.47 374.32


Foundation pad and Chair fo
4 Combined footing, CF2 at grids
A1-A2, E1-E2
240 1700 240 16 37 2180 2 1.58 254.93

600

1 no. of chair bar


500 500
is provided for 1
450 m^2 area

450 12 13 2500 2 0.89 57.78

240 240 16 30 2180 1 1.58 103.35


1700

240 240 16 8 6880 1 1.58 86.98


6400

240 6400 240 20 10 6880 1 2.47 169.88


Foundation pad and Chair for
5 Combined footing, CF3 at grids
C3-D3
240 1700 240 16 30 2180 1 1.58 103.35

600

500 1 no. of chair bar


500 12 11 2500 4 0.89 97.78 is provided for 1
450 m^2 area

450
Total 3679.94
Government of Nepal
National Reconstruction Authority
Central level Project Implementation Unit (Education)
Project: Emergency School Reconstruction of SHREE CHANDRA JYOTI SECONDARY SCHOOL (3 Storey, 9 Classrooms)
Project Location: Bidur Municipality-7, Pipaltar, Nuwakot
Contractor: Gaura Khani JV Prepared By: Manoj Poudel
Bar Bending Schedule of Column (For GF and FF)
Clear Cover (Footing) 50
Clear Cover (Column) 40
Column Size 525*425
Stirrups C/C distance 100
Stirrups Dia 10
Lap Length 960 (for 16φ bar)
Lap Length 1200 (for 20φ bar)
Floor height 3000
Clear Span of Floor, H 2500
h 525
H/4 625
Distance between footing and Ground Level 550
Distance between Ground Level & Plinth level 450
All dimensions are in mm
S.N. Description Shape Diameter Development Number Cutting Length Sets Weight per unit Total
Length length, kg/m weight, kg

16 960 4 3545 15 1.58 336.12


3155

100
290

6155 16 960 4 6545 15 1.58 620.56

100
For column along grid 1,2 &3 (4 290
3
Nos. of 20φ & 8 Nos. of 16φ bars)

3395 20 1200 2 4025 15 2.47 298.15

200
430

6395
20 1200 2 7025 15 2.47 520.37

200
430

Total 1775.20
Government of Nepal
National Reconstruction Authority
Central level Project Implementation Unit (Education)
Project: Emergency School Reconstruction of SHREE CHANDRA JYOTI SECONDARY SCHOOL (3 Storey 9 Classrooms)
Project Location: Bidur Municipality-7, Pipaltar, Nuwakot
Contractor: Gaura Khani JV
Bar Bending Schedule for Column Stirrups
Clear Cover (Column) 40
Column Size 525*425
Bars in Column 4Nos. 20φ & 8 Nos. 16φ
Stirrups C/C distance 100
Stirrups Diameter 10
Clear Span of Floor, H 2500
All dimensions are in mm
Hook Weight per unit Total
Description Shape Diameter Cutting length Number Sets
S. N. length length, kg/m Weight, kg

100
1 Outer Stirrups 345 10 100 1780 107 15 0.617 1763.52

445

100
2 Inner Stirrups 10 100 1362 107 15 0.617 1349.39
136
445

3 Inner Stirrups 100 10 100 1232 107 15 0.617 1349.39


171
345
Total 4462.30
Government of Nepal
National Reconstruction Authority
Central level Project Implementation Unit (Education)
Project: Emergency School Reconstruction of SHREE CHANDRA JYOTI SECONDARY SCHOOL (3 Storey 9 Classrooms)
Project Location: Bidur Municipality-7, Pipaltar, Nuwakot
Contractor: Gaura Khani JV Prepared By: Manoj Poudel

Clear Cover 25
Beam Size 300x300
Bars in Column 3 Nos. 12φ at top & 3 Nos. 12φ at bottom
Stirrups C/C distance 100 & 150
Stirrups Dia 10 2 Legged
Lap Length 720 (for 12φ bar)

Bar Bending Schedule for lower tie beam All dimensions are in mm
S No. Description Shape of Bar Diameter( Number Cutting Sets Wt. per unit Total
mm) Length(mm) Length(kg/m) weight(kg)

Bottom through bar along grid 12 3 8415 5 0.89 112.20


A,B,C,D,E 245 245
7925

Top through bar along grid 245 7925 245 12 3 8415 5 0.89 112.20
1 A,B,C,D,E,F

100
Stirrups along grid A,B,C,D,E 100 250 10 56 1200 5 0.62 207.41

250

Bottom through bar along grid


1,2,3 345 345 12 3 23515 3 0.89 188.12
22825

250 22825 250


Through bar along grid 1,2,3 12 3 23515 3 0.89 188.12
95 95
2
Lapping bar 720 12 12 720 3 0.89 23.04

100
Stirrups along grid 1,2,3 100 250 10 156 1200 3 0.62 346.67

250
Total 1177.75
Working Schedule for lower tie beam

Diameter( Cutting Wt. per unit Total


S No. Description Shape of Bar Number Sets Remarks
mm) Length(mm) Length(kg/m) weight(kg)

Through bar along grid 245 245 12 3 8415 5 0.89 112.20


A,B,C,D,E (Bottom bar)
7925

Through bar along grid 245 245 12 3 8415 5 0.89 112.20


A,B,C,D,E (Top bar) 7925
1

100
Stirrups along grid A,B,C,D,E 100 250 10 56 1200 5 0.62 207.41 Adopt 1140
mm cutting
length of
250 stirrups

Through bar along grid 1,2,3 345 12 2 8725 3 0.89 46.53


(Bottom bar: Corner)
8380

Through bar along grid 1,2,3 4660 345 12 2 5005 3 0.89 26.69
(Bottom bar)

Lapping bar 11220 12 2 11220 3 0.89 59.84

Through bar along grid 1,2,3 345


(Bottom bar: middle) 12 1 5005 3 0.89 13.35
4660

Through bar along grid 1,2,3 345


(Bottom bar: middle) 12 1 8350 3 0.89 22.27
8005

Lapping bar 12 1 11595 3 0.89 30.92


11595

2
Through bar along grid 1,2,3 250 9145
12 2 9490 3 0.89 50.61
(Top bar: Corner)
95
2
Through bar along grid 1,2,3 9115 250
(Top bar: Corner) 12 2 9460 3 0.89 50.45
95

Lapping bar 6000 12 2 6000 3 0.89 32.00

Through bar along grid 1,2,3 250 9865


12 1 10210 3 0.89 27.23
(Top bar: middle)
95

Through bar along grid 1,2,3 8395 250 12 1 8740 3 0.89 23.31
(Top bar: middle)
95

Lapping bar 12 1 6000 3 0.89 16.00


6000

100
Stirrups along grid 1,2,3 100 250 10 156 1200 3 0.62 346.67 Adopt 1140
mm cutting
length of
250 stirrups
Total 1177.67