National Reconstruction Authority: Total
National Reconstruction Authority: Total
100
100 500 10 50 4060 6 0.62 751.85
1430
Foundation pad and stirrups 230 4900 230 12 20 5360 1 0.89 95.29
4 fo Combined footing, CF2 at
grids B2-B3
100
100 500
Foundation pad and stirrups 230 4900 230 12 19 5360 2 0.89 181.05
5 fo Combined footing, CF3 at
grids C2-C3 & D2-D3
230 2700 230 12 34 3160 2 0.89 191.00
100
100 500
Lap Length 960 (for 16φ bar) Distance between footing and Ground Level 600
Clear Span of Floor, H 2475 Distance between Ground Level & Plinth level 450
h 500 3 249.93185185
H/4 620 136.15407407
All dimensions are in mm
4
Bends Deduction Jogged Cutting Weight per unit Total Weight,
Description Diameter, mm Development Length, mm Sets
S. N. 45 90 135 length,mm Length, mm length, kg/m kg
1 Bar 1 (GF) 16 960 32 96 3590 4 1.58 22.69
2 Bar 2 (FF) 16 960 32 96 6590 4 1.58 41.66
3 Bar 3 (GF) 16 960 32 96 3590 4 1.58 22.69
4 Bar 4 (FF) 16 960 32 96 6590 4 1.58 41.66
5 Bar 5 (GF) 16 960 32 96 3590 4 1.58 22.69
6 Bar 6 (FF) 16 960 32 96 6590 4 1.58 41.66
7 Bar 7 (GF) 16 960 32 96 3590 4 1.58 22.69
8 Bar a (FF) 16 960 32 96 6590 4 1.58 41.66
9 Bar b (GF) 16 960 32 96 3590 4 1.58 22.69
10 Bar c (FF) 16 960 32 96 6590 4 1.58 41.66
11 Bar d (GF) 16 960 32 96 3590 4 1.58 22.69
12 Bar e (FF) 16 960 32 96 6590 4 1.58 41.66
Total 386.09
Government of Nepal
National Reconstruction Authority
Central level Project Implementation Unit (
Project: Emergency School Reconstruction of SHREE BHAIRUM SECONDARY SCHOOL (3 Storey 12 Classrooms)
Project Location: Bidur Municipality-8, Hattigauda, Nuwakot
Contractor: Gaura Khani JV Prepared By:
Bar Bending Schedule for Column Stirrups
Clear Cover (Column) 40
1 e d c
Column Size 500x500
b
Bars in Column 12 Nos. 16φ 500
Stirrups C/C distance 100 5 6 a7
Stirrups Dia 8 6 Legged 2
80
1 Outer Stirrups 420 8
420
140
2 Inner Stirrups 8
420
140
3 Inner Stirrups 8
420
Total
nment of Nepal
onstruction Authority
ect Implementation Unit (Education)
3 Storey 12 Classrooms)
Manoj Poudel
All dim
Bends Deduction Hook C/C distance Cutting Length with bend Cutting Length without Adapted
90 135 length Between bars deduction bend deduction
0.395
0.395
0.395
0.00
Government of Nepal
National Reconstruction Authority
Central level Project Implementation Unit (Education)
Project: Emergency School Reconstruction of SHREE BHAIRUM SECONDARY SCHOOL (3 Storey 12 Classrooms)
Project Location: Bidur Municipality-8, Hattigauda, Nuwakot
Contractor: Gaura Khani JV Prepared By: Manoj Poudel
Clear Cover 25
Beam Size 300x400
Bars in Column 3 Nos. 16φ at top & 3 Nos. 16φ at bottom
Stirrups C/C distance 100 & 150
Stirrups Dia 8 2 Legged
Lap Length 960 (for 16φ bar)
Wt. per
Bar Bending Schedule for foundation tie beam All dimensions are in mm
unit
Diameter( Number Cutting Sets Length(kg Total
S No. Description Shape of Bar mm) Length(mm) /m) weight(kg)
Through bar along grid
A,B,C,D,E,F 680 680 16 3 8740 6 1.58 248.60
7380
80
80
Stirrups along grid A,B,C,D,E,F 350 8 56 1360 6 0.40 180.53
250
Through bar along grid 1,2,3 680 680 16 3 30240 3 1.58 430.08
28880
2
Lapping bar 16 12 960 3 1.58 54.61
960
80
80
Stirrups along grid 1,2,3 350 8 226 1360 3 0.40 364.28
250
Total 1956.79
Working Schedule for foundation tie beam
80
Stirrups along grid A,B,C,D,E,F 80 350 8 56 1360 6 0.40 180.53 Adopt 1300
mm cutting
length of
250 stirrups
2
Through bar along grid 1,2,3 680
16 1 9120 3 1.58 43.24
(Bottom bar: middle) 8440
Through bar along grid 1,2,3 9400 350 16 2 10080 3 1.58 95.57
(Top bar: Corner)
330
Through bar along grid 1,2,3 8860 350 16 1 9540 3 1.58 45.23
(Top bar: middle)
330
80
Adopt 1300
Stirrups along grid 1,2,3 80 350 8 226 1360 3 0.40 364.28 mm cutting
length of
250 stirrups
Total 1956.79
Earthwork in excavation, Stone soling, PCC
S.N. Description Quantity, m^3
Formworks
S.N. Description Quantity, m^2
Bar Bending schedule(BBS)
S.N. Description Quantity, kg
Concrete works M20 (1:1.5:3)
S.N. Description Quantity, m^3