Bar Bending Schedule for footing
S No. Description Shape of Bar Diameter(mm) Number Cutting Length(mm) Sets Wt. per unit Length(kg/m) Total weight(kg)

1 Foundation pad for Isolated 100 100 16 17 2600 4 1.58 279.39


footing, F1 at grid A1 & F1
2400
Foundation pad for Isolated
2 footing, F2 at grid B1, C1, 100 100 16 20 3100 8 1.58 783.80
D1,E1 2900

230 230 12 34 2160 3 0.89 195.84


1700

230 230 16 12 5360 3 1.58 304.92


4900

230 4900 230 12 12 5360 3 0.89 171.52


Foundation pad and stirrups
3 for Combined footing, CF1 at
grids A2-A3, E2-E3 & F2-F3

230 1700 230 12 34 2160 3 0.89 195.84

100
100 500 10 50 4060 6 0.62 751.85

1430

230 230 12 34 3360 1 0.89 101.55


2900

230 230 16 20 5360 1 1.58 169.40


4900

Foundation pad and stirrups 230 4900 230 12 20 5360 1 0.89 95.29
4 fo Combined footing, CF2 at
grids B2-B3

230 2900 230 12 34 3360 1 0.89 101.55

100
100 500

2050 10 50 5300 2 0.62 327.16

230 230 12 34 3160 2 0.89 191.00


2700

230 230 16 19 5360 2 1.58 321.86


4900

Foundation pad and stirrups 230 4900 230 12 19 5360 2 0.89 181.05
5 fo Combined footing, CF3 at
grids C2-C3 & D2-D3
230 2700 230 12 34 3160 2 0.89 191.00

100
100 500

2000 10 50 5200 4 0.62 641.98


Total 69780 5005.01
Remarks
Clear Cover (Footing) 50
Clear Cover (Column) 40
1 e d c
Column Size 500x500
b
Bars in Column 12 Nos. 16φ
a
Stirrups C/C distance 100 5 6 7
Stirrups Dia 8 6 Legged 2

Lap Length 960 (for 16φ bar) Distance between footing and Ground Level 600
Clear Span of Floor, H 2475 Distance between Ground Level & Plinth level 450
h 500 3 249.93185185
H/4 620 136.15407407
All dimensions are in mm
4
Bends Deduction Jogged Cutting Weight per unit Total Weight,
Description Diameter, mm Development Length, mm Sets
S. N. 45 90 135 length,mm Length, mm length, kg/m kg
1 Bar 1 (GF) 16 960 32 96 3590 4 1.58 22.69
2 Bar 2 (FF) 16 960 32 96 6590 4 1.58 41.66
3 Bar 3 (GF) 16 960 32 96 3590 4 1.58 22.69
4 Bar 4 (FF) 16 960 32 96 6590 4 1.58 41.66
5 Bar 5 (GF) 16 960 32 96 3590 4 1.58 22.69
6 Bar 6 (FF) 16 960 32 96 6590 4 1.58 41.66
7 Bar 7 (GF) 16 960 32 96 3590 4 1.58 22.69
8 Bar a (FF) 16 960 32 96 6590 4 1.58 41.66
9 Bar b (GF) 16 960 32 96 3590 4 1.58 22.69
10 Bar c (FF) 16 960 32 96 6590 4 1.58 41.66
11 Bar d (GF) 16 960 32 96 3590 4 1.58 22.69
12 Bar e (FF) 16 960 32 96 6590 4 1.58 41.66
Total 386.09
Government of Nepal
National Reconstruction Authority
Central level Project Implementation Unit (
Project: Emergency School Reconstruction of SHREE BHAIRUM SECONDARY SCHOOL (3 Storey 12 Classrooms)
Project Location: Bidur Municipality-8, Hattigauda, Nuwakot
Contractor: Gaura Khani JV Prepared By:
Bar Bending Schedule for Column Stirrups
Clear Cover (Column) 40
1 e d c
Column Size 500x500
b
Bars in Column 12 Nos. 16φ 500
Stirrups C/C distance 100 5 6 a7
Stirrups Dia 8 6 Legged 2

Clear Span of Floor, H 2475 500


Diameter of vertical bars 16
3
Bends Deduction
Description Shape Diameter, mm
S. N. 45
4

80
1 Outer Stirrups 420 8

420

140
2 Inner Stirrups 8

420

140
3 Inner Stirrups 8

420
Total
nment of Nepal
onstruction Authority
ect Implementation Unit (Education)
3 Storey 12 Classrooms)

Manoj Poudel

All dim
Bends Deduction Hook C/C distance Cutting Length with bend Cutting Length without Adapted
90 135 length Between bars deduction bend deduction

16 24 80 1744 1840 1820

16 24 80 130 1228 1324 1280

16 24 80 130 1228 1324 1280


All dimensions
Weight areTotal
in mm
Number per unit Weight,
length, kg
kg/m

0.395

0.395

0.395

0.00
Government of Nepal
National Reconstruction Authority
Central level Project Implementation Unit (Education)
Project: Emergency School Reconstruction of SHREE BHAIRUM SECONDARY SCHOOL (3 Storey 12 Classrooms)
Project Location: Bidur Municipality-8, Hattigauda, Nuwakot
Contractor: Gaura Khani JV Prepared By: Manoj Poudel

Clear Cover 25
Beam Size 300x400
Bars in Column 3 Nos. 16φ at top & 3 Nos. 16φ at bottom
Stirrups C/C distance 100 & 150
Stirrups Dia 8 2 Legged
Lap Length 960 (for 16φ bar)

Wt. per
Bar Bending Schedule for foundation tie beam All dimensions are in mm
unit
Diameter( Number Cutting Sets Length(kg Total
S No. Description Shape of Bar mm) Length(mm) /m) weight(kg)
Through bar along grid
A,B,C,D,E,F 680 680 16 3 8740 6 1.58 248.60
7380

Through bar along grid 350 7380 350


A,B,C,D,E,F 16 3 8740 6 1.58 248.60
330 330
1

80
80
Stirrups along grid A,B,C,D,E,F 350 8 56 1360 6 0.40 180.53

250

Through bar along grid 1,2,3 680 680 16 3 30240 3 1.58 430.08
28880

350 28880 350


Through bar along grid 1,2,3 16 3 30240 3 1.58 430.08
330 330

2
Lapping bar 16 12 960 3 1.58 54.61
960

80
80
Stirrups along grid 1,2,3 350 8 226 1360 3 0.40 364.28

250
Total 1956.79
Working Schedule for foundation tie beam

Diameter( Cutting Wt. per unit Total


S No. Description Shape of Bar Number Sets Remarks
mm) Length(mm) Length(kg/m) weight(kg)

Through bar along grid


680 680 16 3 8740 6 1.58 248.60
A,B,C,D,E,F (Bottom bar)
7380

Through bar along grid 350 7380 350


16 3 8740 6 1.58 248.60
A,B,C,D,E,F (Top bar) 330 330
1

80
Stirrups along grid A,B,C,D,E,F 80 350 8 56 1360 6 0.40 180.53 Adopt 1300
mm cutting
length of
250 stirrups

Through bar along grid 1,2,3 680 16 2 8580 3 1.58 81.35


(Bottom bar: Corner)
7900

Through bar along grid 1,2,3 680


16 2 11580 3 1.58 109.80
(Bottom bar) 10900

Lapping bar 12000 16 2 12000 3 1.58 113.78

Through bar along grid 1,2,3 680


(Bottom bar: middle) 16 1 11580 3 1.58 54.90
10900

2
Through bar along grid 1,2,3 680
16 1 9120 3 1.58 43.24
(Bottom bar: middle) 8440

Lapping bar 11460 16 1 11460 3 1.58 54.33

Through bar along grid 1,2,3 350 9400


16 2 10080 3 1.58 95.57
(Top bar: Corner)
330
2

Through bar along grid 1,2,3 9400 350 16 2 10080 3 1.58 95.57
(Top bar: Corner)
330

Lapping bar 12000 16 2 12000 3 1.58 113.78

Through bar along grid 1,2,3 350 9940


16 1 10620 3 1.58 50.35
(Top bar: middle)
330

Through bar along grid 1,2,3 8860 350 16 1 9540 3 1.58 45.23
(Top bar: middle)
330

Lapping bar 16 1 12000 3 1.58 56.89


12000

80
Adopt 1300
Stirrups along grid 1,2,3 80 350 8 226 1360 3 0.40 364.28 mm cutting
length of
250 stirrups
Total 1956.79
Earthwork in excavation, Stone soling, PCC
S.N. Description Quantity, m^3
Formworks
S.N. Description Quantity, m^2
Bar Bending schedule(BBS)
S.N. Description Quantity, kg
Concrete works M20 (1:1.5:3)
S.N. Description Quantity, m^3